A two-stage hybrid robust-stochastic day-ahead scheduling of transactive microgrids considering the possibility of main grid disconnection

被引:31
|
作者
Nourollahi, Ramin [1 ]
Salyani, Pouya [1 ]
Zare, Kazem [1 ]
Razzaghi, Reza [1 ]
机构
[1] Univ Tabriz, Fac Elect & Comp Engn, Tabriz 5166615813, Iran
关键词
MG; Resiliency; Robust-stochastic; ITMG; Interconnected transactive MGs; NETWORKED-MICROGRIDS; ENERGY MANAGEMENT; RESILIENCE; ENHANCEMENT; STRATEGIES;
D O I
10.1016/j.ijepes.2021.107701
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
The interconnected transactive MGs (ITMGs) concept is an efficient way for economical operation of MGs. For power systems under the danger of stochastic disasters, a priority should be given to the resiliency enhancement of these ITMGs to have the highest restoration in the times of disconnection from the main grid. This paper introduces a two-stage hybrid stochastic programming/robust optimization (SP/RO) day-ahead scheduling of ITMGs that takes into account the possibility of disconnection from the main grid for several hours. The proposed resiliency-oriented scheduling in this paper is a two-stage mixed-integer linear optimization problem and aims to reduce the operation cost of the whole ITMG. Furthermore, the excess power can be traded among MGs apart from the available power of renewable resources, dispatched power of storage and dispatchable units, and demand response programs. Thus, this scheduling needs to consider the optimal hourly transactive energy among the MGs in both normal and grid disconnected modes of the ITMG. The load curtailment and demand response programs are the last options for maintaining the balance in the conventional structure of MGs that this paper utilizes for ITMG. Obtained results showed that load curtailment of the ITMG is limited by the implementation of transactive energy between MGs. Furthermore, the reduction in renewable and dispatchable generation capacity and their impact on transactive energy and demand response programs during resiliency is discussed. Also, to enhance the conservativeness and to consider the worst cases in this scheduling, the uncertainties in the start time of the islanding and its duration are considered in the problem.
引用
收藏
页数:13
相关论文
共 50 条
  • [1] A Hybrid Robust-Stochastic Approach for the Day-Ahead Scheduling of an EV Aggregator
    Minniti, S.
    Haque, A. N. M. M.
    Paterakis, N. G.
    Nguyen, P. H.
    [J]. 2019 IEEE MILAN POWERTECH, 2019,
  • [2] Day-ahead robust dispatch of interconnected multi-microgrids considering two-stage model of hybrid energy storage
    Ding, Yixing
    Xu, Qingshan
    Hao, Lili
    Xia, Yuanxing
    Li, Dongsen
    Chen, Jun
    [J]. JOURNAL OF ENERGY STORAGE, 2024, 92
  • [3] Two-Stage Robust Stochastic Model Scheduling for Transactive Energy Based Renewable Microgrids
    Daneshvar, Mohammadreza
    Mohammadi-Ivatloo, Behnam
    Zare, Kazem
    Asadi, Somayeh
    [J]. IEEE TRANSACTIONS ON INDUSTRIAL INFORMATICS, 2020, 16 (11) : 6857 - 6867
  • [4] A hybrid robust-stochastic optimization approach for day-ahead scheduling of cascaded hydroelectric system in restructured electricity market
    Zhong, Zhiming
    Fan, Neng
    Wu, Lei
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2023, 306 (02) : 909 - 926
  • [5] Two-Stage Hybrid Day-Ahead Solar Forecasting
    Alanazi, Mohana
    Mahoor, Mohsen
    Khodaei, Amin
    [J]. 2017 NORTH AMERICAN POWER SYMPOSIUM (NAPS), 2017,
  • [6] Two-stage stochastic robust optimization model of microgrid day-ahead dispatching considering controllable air conditioning load
    Ma, Yinghao
    Xu, Wuhao
    Yang, Hejun
    Zhang, Dabo
    [J]. INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 2022, 141
  • [7] A two-stage stochastic programming approach to integrated day-ahead electricity commitment and production scheduling
    Leo, Egidio
    Engell, Sebastian
    [J]. 28TH EUROPEAN SYMPOSIUM ON COMPUTER AIDED PROCESS ENGINEERING, 2018, 43 : 1009 - 1014
  • [8] A New Hybrid Fuzzy-Stochastic Model for Day-ahead Scheduling of Isolated Microgrids
    Zandrazavi, Seyed Farhad
    Tabares, Alejandra
    Franco, John Fredy
    Shatie-khah, Miadreza
    Soares, Joao
    Vale, Zita
    [J]. 2023 IEEE POWER & ENERGY SOCIETY GENERAL MEETING, PESGM, 2023,
  • [9] A hybrid Robust-Stochastic optimization model for planned outage based Day-Ahead scheduling of a Plug-in electric vehicles parking lot
    Mobaraki, Almas Hooshyar
    Salyani, Pouya
    Safari, Amin
    Quteishat, Anas
    Younis, Mahmoud A.
    [J]. SUSTAINABLE ENERGY TECHNOLOGIES AND ASSESSMENTS, 2022, 54
  • [10] A two-stage optimal scheduling strategy of hybrid energy system integrated day-ahead electricity market
    Singh, Nitesh Kumar
    Koley, Chaitali
    Gope, Sadhan
    [J]. INTERNATIONAL JOURNAL OF ENVIRONMENT AND SUSTAINABLE DEVELOPMENT, 2024, 23 (2-3)