Influence of saturated zone depth and vegetation on the performance of vertical flow-constructed wetland with continuous feeding

被引:10
|
作者
Liu, Guochen [1 ]
She, Zonglian [1 ,2 ,3 ]
Gao, Mengchun [1 ,2 ]
Liang, Jiacheng [1 ]
Jin, Chunji [1 ,2 ]
Guo, Liang [1 ,2 ]
Zhao, Yangguo [1 ,2 ]
机构
[1] Ocean Univ China, Key Lab Marine Environm & Ecol, Minist Educ, Qingdao 266100, Peoples R China
[2] Ocean Univ China, Coll Environm Sci & Engn, Qingdao 266100, Peoples R China
[3] Ocean Univ China, Shandong Prov Key Lab Marine Environm & Geol Engn, Qingdao 266100, Peoples R China
基金
中国国家自然科学基金;
关键词
Vertical flow-constructed wetland; Saturated zone depth; Continuous feeding; Nitrogen removal; Vertical distribution; Plant uptake; WASTE-WATER TREATMENT; NUTRIENT REMOVAL CAPABILITY; NITROGEN REMOVAL; PILOT-SCALE; ENVIRONMENTAL PARAMETERS; GROWTH-CHARACTERISTICS; SPATIAL-DISTRIBUTION; TRICKLING FILTER; OXYGEN-TRANSFER; EFFICIENCY;
D O I
10.1007/s11356-018-3288-0
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
The object of this study was to investigate the effect of saturated zone depth (SZD) and plant on the removal of organics and nitrogen in four continuous-feed vertical flow-constructed wetlands (VFCWs). Three VFCWs were planted with Iris pseudacorus and operated at different SZDs (19, 51, and 84cm), and the other one was non-planted and operated at 51cm SZD. The VFCWs were operated with an organic loading rate (OLR) of 79g chemical oxygen demand (COD)m(-2)day(-1), a total nitrogen loading rate (NLR) of 11g Nm(-2)day(-1), and a hydraulic loading rate (HLR) of 0.35m(3)m(-2)day(-1). Simultaneous transformation of ammonium and nitrate occurred in all of the four systems. In the planted bed with 51cm SZD, suitable conditions for nitrification and denitrification could be created and the best performance for total nitrogen (TN) removal was realized via simultaneous nitrification and denitrification (SND), achieving TN removal efficiency of 67.4-80.3%. Higher ammonium nitrogen (NH4+-N) and COD removal efficiency was obtained in the system operated with 19cm SZD, whereas higher NO3--N removal could be achieved in the bed with 84cm SZD. With the same SZD of 51cm, the planted VFCW performed preferable removal of COD, NH4+-N, and TN in comparison with the non-planted one. All the VFCWs showed high removal efficiencies for total phosphorus (>60.15%). Adsorption of phosphorus was primarily observed in the top and upper-middle layers filled with carbon burn slag. It has been proved that the partially saturated VFCW operated with continuous feed could achieve good performance in removal of organic matter and nitrogen by SZD adjustment to develop appropriate aerobic and anoxic regions.
引用
收藏
页码:33286 / 33297
页数:12
相关论文
共 50 条
  • [21] IMPROVED AMMONIACAL-NITROGEN REMOVAL IN NON-PLANTED VERTICAL FLOW-CONSTRUCTED WETLAND SYSTEM BY NATURAL OXYGEN TRANSFER
    Du, Xiaoli
    Xu, Zuxin
    Wang, Sheng
    FRESENIUS ENVIRONMENTAL BULLETIN, 2009, 18 (10): : 1846 - 1850
  • [22] Elucidating the Potential of Vertical Flow-Constructed Wetlands Vegetated with Different Wetland Plant Species for the Remediation of Chromium-Contaminated Water
    Younas, Fazila
    Bibi, Irshad
    Afzal, Muhammad
    Niazi, Nabeel Khan
    Aslam, Zubair
    SUSTAINABILITY, 2022, 14 (09)
  • [23] Effects of salinity on pollutant removal and bacterial community in a partially saturated vertical flow constructed wetland
    Gao, Feng
    Liu, Guochen
    She, Zonglian
    Ji, Junyuan
    Gao, Mengchun
    Zhao, Yangguo
    Guo, Liang
    Jin, Chunji
    BIORESOURCE TECHNOLOGY, 2021, 329
  • [24] The influence mechanism of bioclogging on pollution removal efficiency of vertical flow constructed wetland
    Zhu, Yixuan
    Ye, Ping
    Xu, Shirong
    Zhou, Yongchao
    Zhang, Yan
    Zhang, Yiping
    Zhang, Tuqiao
    WATER SCIENCE AND TECHNOLOGY, 2020, 81 (09) : 1870 - 1881
  • [25] Batch versus continuous feeding strategies for pharmaceutical removal by subsurface flow constructed wetland
    Zhang, Dong Qing
    Gersberg, Richard M.
    Zhu, Junfei
    Hua, Tao
    Jinadasa, K. B. S. N.
    Tan, Soon Keat
    ENVIRONMENTAL POLLUTION, 2012, 167 : 124 - 131
  • [26] Compact vertical flow constructed wetland systems - first two years' performance
    Weedon, CM
    WATER SCIENCE AND TECHNOLOGY, 2003, 48 (05) : 15 - 23
  • [27] Performance of various media in vertical flow constructed wetland for the treatment of domestic wastewater
    Soundaranayaki, K.
    Gandhimathi, R.
    DESALINATION AND WATER TREATMENT, 2019, 146 : 57 - 67
  • [28] Optimising the operating performance of vertical flow constructed wetland treating rural wastewater
    Du Xiao-li
    Xu Zu-xin
    Wang Sheng
    Zheng Lei
    2009 3RD INTERNATIONAL CONFERENCE ON BIOINFORMATICS AND BIOMEDICAL ENGINEERING, VOLS 1-11, 2009, : 5149 - +
  • [29] Comparison of the performance of horizontal and vertical flow constructed wetland planted with Rhynchospora corymbosa
    Raphael, O. D.
    Ojo, S. I. A.
    Ogedengbec, K.
    Eghobamien, C.
    Morakinyo, A. O.
    INTERNATIONAL JOURNAL OF PHYTOREMEDIATION, 2019, 21 (02) : 152 - 159
  • [30] Performance and modeling of a vertical flow constructed wetland-maturation pond system
    Gikas, Georgios D.
    Tsihrintzis, Vassilios A.
    Akratos, Christos S.
    JOURNAL OF ENVIRONMENTAL SCIENCE AND HEALTH PART A-TOXIC/HAZARDOUS SUBSTANCES & ENVIRONMENTAL ENGINEERING, 2011, 46 (07): : 692 - 708