Strategic safety placement in supply chain design with due-date based demand

被引:20
|
作者
Funaki, Kenichi [1 ]
机构
[1] Hitachi Ltd, Prod Engn Res Lab, Totsuka Ku, Yokohama, Kanagawa 2440817, Japan
关键词
Supply chain design; Multi-echelon stock placement; Dynamic programming; B to B business; MULTISTAGE INVENTORY SYSTEMS; STOCK OPTIMIZATION; CORPORATION; NETWORKS; LOCATION; MODEL;
D O I
10.1016/j.ijpe.2010.11.015
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
We present a strategic safety stock placement model in supply chain design for assembly-type product with due-date based demand, where demand data are based on dates when company has to ship to customers rather than order receiving dates. We formulate multi-echelon stock placement by guaranteed-service model with demand propagation equations through backward explosion, where demand can be either stationary or nonstationary. The stock placement model is incorporated into network design problem and its optimization procedure is provided. We show effectiveness of the optimization procedure and other significant features of the model through numerical examples of a machinery product supply chain. (C) 2010 Elsevier B.V. All rights reserved.
引用
收藏
页码:4 / 13
页数:10
相关论文
共 50 条
  • [1] Fuzzy Decision Model for Order Due-Date Quotation in a Supply Chain
    Lo, Chien Chung
    [J]. 2009 INTERNATIONAL CONFERENCE ON INFORMATION MANAGEMENT, INNOVATION MANAGEMENT AND INDUSTRIAL ENGINEERING, VOL 3, PROCEEDINGS, 2009, : 171 - 175
  • [2] Scheduling and due-date quotation in a make-to-order supply chain
    Kaminsky, Philip
    Kaya, Onur
    [J]. NAVAL RESEARCH LOGISTICS, 2008, 55 (05) : 444 - 458
  • [3] Strategic design of competing supply chain networks for inelastic demand
    Rezapour, S.
    Farahani, R. Zanjirani
    Drezner, T.
    [J]. JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2011, 62 (10) : 1784 - 1795
  • [4] Due-date assignment for wafer fabrication under demand variate environment
    Pearn, W. L.
    Chung, S. H.
    Lai, C. A.
    [J]. IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, 2007, 20 (02) : 165 - 175
  • [5] CRITICAL RATIO SCHEDULING - DYNAMIC DUE-DATE PROCEDURES UNDER DEMAND UNCERTAINTY
    BERRY, WL
    PENLESKY, RJ
    VOLLMANN, TE
    [J]. IIE TRANSACTIONS, 1984, 16 (01) : 81 - 89
  • [6] Strategic safety stock placement in supply chains
    Graves, SC
    Willems, SP
    [J]. PROCEEDINGS OF THE 1996 MSOM CONFERENCE, 1996, : 299 - 304
  • [7] Strategic inventory placement in supply chains: Nonstationary demand
    Graves, Stephen C.
    Willems, Sean P.
    [J]. M&SOM-MANUFACTURING & SERVICE OPERATIONS MANAGEMENT, 2008, 10 (02) : 278 - 287
  • [8] DUE-DATE RELIABILITY IN A REPAIR SHOP - IMPLICATIONS FOR ORGANIZATIONAL AND WORK DESIGN
    KUIPERS, H
    REINKING, P
    WORTMANN, JC
    [J]. MAINTENANCE MANAGEMENT INTERNATIONAL, 1985, 6 (01): : 3 - 21
  • [9] On due-date based valid cuts for the sequential ordering problem
    L. F. Escudero
    M. T. Ortuño
    [J]. Top, 1997, 5 (1) : 159 - 166
  • [10] A synchronous supply-demand model of the port supply chain based on vertical strategic alliance
    Feng, Xuejun
    Yue, Qiaohong
    [J]. ASIAN AND PACIFIC COASTS 2007, 2007, : 609 - 612