RISK MANAGEMENT FOR RAIL TRANSPORTATION PROJECTS

被引:0
|
作者
Franklin, Paul [1 ]
机构
[1] Arup, New York, NY USA
关键词
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Risk management is the subject of increasing attention in recent years. In the US, when Federal funds are committed to projects, risk management is a required programmatic activity. Even when it is not mandated by law or regulation, risk management is prudent for expensive, long-duration projects. Frequently, risk management is based on a risk register, and often captures as a list of typical problems with design and construction that a contractor has experienced. Risk registers vary in quality and usefulness. Some contractor submissions appear to be more "pro-forma" documents, while more useful risk registers will include anticipated risks tailored to the complexity of the scope of work and the contractor's anticipated solution. This qualitative approach can develop a reasonable view of key risks and work to mitigate them. Recent experience at Arup has shown that this approach, while valuable as an initial approach, is limited by its quantitative nature. This paper will explore some of the key lessons learned and emerging practices that have been successfully used in recent work in detail. Key topics include: While the essential elements of risk management apply across a wide range of markets, the planning and construction of risk management for due diligence, privately funded and partnership funded (both government and PPP) projects require different emphases and tailored approaches. Appropriate risk structuring is required to identify key project risks that may be unrelated or marginally related to design and construction. Developing clear and effective ancillary risk statements (e.g., for marketing, finance, permitting and regulatory requirements) is important to successful risk management. Where partnering is used for funding, there is a greater need for clarity and good communication. Planning documents require special consideration to minimize difficulties. Planning documents also need to be efficient and effective. Large, sometimes geographically diverse, teams benefit from alternative approaches to risk workshops. Large, expensive and long duration projects benefit by shifting risk analysis toward a more quantitative approach. Modeling techniques such as Monte Carlo simulation require special software (@Risk or Primavera) and sound input. Analyses that move risk statements from the essentially qualitative (such as severity of 4 and likelihood of 3) to agreed quantitative inputs are important. Cost and schedule contingency are key concerns for funding agencies, whether in-house or external. The underlying structure for effectively constructing contingency depends on the contracting structure, sequencing of work, unit price allowances and other factors, in addition to the analysis of the contingency requirements of technical and other specific risks. Special analyses for items of particular concern, for instance, the adequacy of escalation allowances or geotechnical risks, can also be helpful, particularly in the context of emerging technologies such as HSR. Risk management is coming of age, and is more than a risk register. Projects benefit from a more qualitative approach. Not every technique applies to every project, of course, but most projects, small and large, can benefit from a more structured, quantitative approach to risk management.
引用
收藏
页码:415 / 422
页数:8
相关论文
共 50 条
  • [1] Risk Analysis for Transportation Projects
    Franklin, Paul
    [J]. ANNUAL RELIABILITY AND MAINTAINABILITY SYMPOSIUM, 2009 PROCEEDINGS, 2009, : 275 - 279
  • [2] Revenue management for rail container transportation
    Bilegan, Ioana C.
    Brotcorne, Luce
    Feillet, Dominique
    Hayel, Yezekael
    [J]. EURO JOURNAL ON TRANSPORTATION AND LOGISTICS, 2015, 4 (02) : 261 - 283
  • [3] Complexities in mega rail transportation projects "Sydney metro" and "Melbourne metro rail" insight
    Gharehbaghi, Koorosh
    McManus, Kerry
    Hurst, Neville
    Robson, Kathryn
    Myers, Matt
    [J]. JOURNAL OF ENGINEERING DESIGN AND TECHNOLOGY, 2020, 18 (05) : 973 - 990
  • [4] ROCK-SLOPE STABILITY ON RAIL TRANSPORTATION PROJECTS.
    Brawner, C.O.
    [J]. Transportation Research Record, 1980, (749) : 58 - 67
  • [5] Enterprise security management in the transportation projects
    Alavi S.H.
    [J]. Journal of Transportation Security, 2015, 8 (1-2) : 33 - 36
  • [6] Indirect Determination of the Risk of Transportation Projects
    Pastor, O.
    [J]. ACTA POLYTECHNICA, 2007, 47 (01) : 17 - 20
  • [7] Risk Analysis of Transportation Projects in CPEC
    Liu, Ya-Ti
    Huang, Dao-Zheng
    Fu, Qin
    [J]. CICTP 2019: TRANSPORTATION IN CHINA-CONNECTING THE WORLD, 2019, : 3669 - 3676
  • [8] Hazard Management with DOORS: Rail Infrastructure Projects
    Hughes, Dave
    Saeed, Amer
    [J]. SAFETY-CRITICAL SYSTEMS: PROBLEMS, PROCESS AND PRACTICE, 2009, : 71 - 93
  • [9] CONFIGURATION MANAGEMENT COORDINATION WITH ASSET MANAGEMENT AS APPLIED TO RAIL TRANSPORTATION
    Donohue, Brian P.
    Cripps, Louis
    [J]. PROCEEDINGS OF THE ASME JOINT RAIL CONFERENCE, 2018, 2018,
  • [10] Management of Change Orders in Infrastructure Transportation Projects
    Assaad, Rayan H.
    Ahmed, Muaz O.
    El-adaway, Islam H.
    Shrestha, Pramen P.
    [J]. PRACTICE PERIODICAL ON STRUCTURAL DESIGN AND CONSTRUCTION, 2022, 27 (01)