Management of Change Orders in Infrastructure Transportation Projects

被引:2
|
作者
Assaad, Rayan H. [1 ]
Ahmed, Muaz O. [2 ]
El-adaway, Islam H. [3 ,4 ,5 ]
Shrestha, Pramen P. [6 ]
机构
[1] New Jersey Inst Technol, John A Reif Jr Dept Civil & Environm Engn, Newark, NJ 07102 USA
[2] Missouri Univ Sci & Technol, Dept Civil Architectural & Environm Engn, 1401 N Pine St, Rolla, MO 65401 USA
[3] Missouri Univ Sci & Technol, Dept Civil Architectural & Environm Engn, Civil Engn, 1401 N Pine St,228 Butler Carlton Engn Hall, Rolla, MO 65409 USA
[4] Missouri Univ Sci & Technol, Dept Civil Architectural & Environm Engn, Missouri Consortium Construct Innovat, 1401 N Pine St,228 Butler Carlton Engn Hall, Rolla, MO 65409 USA
[5] Missouri Univ Sci & Technol, Dept Engn Management & Syst Engn, 1401 N Pine St,228 Butler Carlton Engn Hall, Rolla, MO 65409 USA
[6] Univ Nevada, Dept Civil & Environm Engn & Construct, Construct Engn Management, Las Vegas, NV 89154 USA
关键词
IMPACT;
D O I
10.1061/(ASCE)SC.1943-5576.0000640
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The Illinois Department of Transportation (IDOT) will handle many upcoming projects due to the recent statewide infrastructure strategic plan and the fast-track efforts affecting many infrastructure projects amid COVID-19. Nevertheless, many change orders are anticipated to occur on IDOT's projects. Thus, this paper examines the proper contractual management of changes within IDOT infrastructure transportation projects by following a research method based on the integration between a desktop analysis and a focus group analysis. The desktop analysis involved collecting information and data from existing resources, case studies, and documents related to change orders. The focus group analysis involved consulting with change order experts to verify that the outcome of each research step is useful and to validate the final outcomes of the paper. Based on 50 documented major change orders in IDOT projects and three litigated cases, two findings are provided. First, the top causes for key change orders within IDOT projects include contract administration, allowable contingencies, quantity omission or error, differing site conditions, and design changes. Second, the most critical change order related challenges within IDOT's infrastructure projects include approval procedures, compensation considerations, and applicable laws. This paper offers flowcharts, synopsis of opportunities and risks, and a checklist to help the contracting parties better administer change orders. Ultimately, the contributions of this paper to the practice include: (1) minimizing the number and amount of change orders, (2) helping the contracting parties better understand how their individual responsibilities contribute to the proper processing and management of changes and variations, (3) offering contractors the ability to visualize the different steps involved in the approval of change orders, (4) assisting the project stakeholders in identifying change order-related areas for improvement, and (5) allowing project owners to better mitigate, manage, and administer the contractual aspects of change orders. (C) 2021 American Society of Civil Engineers.
引用
收藏
页数:17
相关论文
共 50 条
  • [1] Contractual Guidelines for Management of Infrastructure Transportation Projects
    Elsayegh, Amr
    El-adaway, Islam H.
    Assaad, Rayan
    Ali, Gasser
    Abotaleb, Ibrahim
    Smith, Christopher
    Bootwala, Mustafa
    Eteifa, Seif
    [J]. JOURNAL OF LEGAL AFFAIRS AND DISPUTE RESOLUTION IN ENGINEERING AND CONSTRUCTION, 2020, 12 (03)
  • [2] Overruns in transportation infrastructure projects
    Love, Peter E. D.
    Sing, Chun-Pung
    Wang, Xiangyu
    Irani, Zahir
    Thwala, Didibhuku W.
    [J]. STRUCTURE AND INFRASTRUCTURE ENGINEERING, 2014, 10 (02) : 141 - 159
  • [3] Cost performance of public infrastructure projects: the nemesis and nirvana of change-orders
    Love, Peter E. D.
    Irani, Zahir
    Smith, Jim
    Regan, Michael
    Liu, Junxiao
    [J]. PRODUCTION PLANNING & CONTROL, 2017, 28 (13) : 1081 - 1092
  • [4] Large Scale Infrastructure Projects: The Art of Project or Change Management?
    Geert Letens
    Kurt Verweire
    Peter De Prins
    [J]. Frontiers of Engineering Management, 2016, (03) : 197 - 202
  • [5] Large Scale Infrastructure Projects: The Art of Project or Change Management?
    Geert Letens
    Kurt Verweire
    Peter De Prins
    [J]. Frontiers of Engineering Management., 2016, 3 (03) - 202+296
  • [6] Large Scale Infrastructure Projects: The Art of Project or Change Management?
    Letens, Geert
    Verweire, Kurt
    De Prins, Peter
    [J]. FRONTIERS OF ENGINEERING MANAGEMENT, 2016, 3 (03) : 197 - 202
  • [7] Professional management in transportation infrastructure projects - planning and construction "under rolling wheels"
    Schoenthaler, Carmen
    [J]. BAUTECHNIK, 2009, 86 (01) : 48 - 55
  • [8] Change Orders and Schedule Performance of Design-Build Infrastructure Projects: Comparison between Highway and Water and Wastewater Projects
    Fathi, Medya
    Shrestha, Pramen P.
    Shakya, Binita
    [J]. JOURNAL OF LEGAL AFFAIRS AND DISPUTE RESOLUTION IN ENGINEERING AND CONSTRUCTION, 2020, 12 (01)
  • [9] Variations and Change Orders on Construction Projects
    Keane, Patrick
    Sertyesilisik, Begum
    Ross, Andrew David
    [J]. JOURNAL OF LEGAL AFFAIRS AND DISPUTE RESOLUTION IN ENGINEERING AND CONSTRUCTION, 2010, 2 (02) : 89 - 96
  • [10] Causes of Change Orders in Construction Projects
    Khalifa, Walid M. A.
    Mahamid, Ibrahim
    [J]. ENGINEERING TECHNOLOGY & APPLIED SCIENCE RESEARCH, 2019, 9 (06) : 4956 - 4961