Management of Change Orders in Infrastructure Transportation Projects

被引:2
|
作者
Assaad, Rayan H. [1 ]
Ahmed, Muaz O. [2 ]
El-adaway, Islam H. [3 ,4 ,5 ]
Shrestha, Pramen P. [6 ]
机构
[1] New Jersey Inst Technol, John A Reif Jr Dept Civil & Environm Engn, Newark, NJ 07102 USA
[2] Missouri Univ Sci & Technol, Dept Civil Architectural & Environm Engn, 1401 N Pine St, Rolla, MO 65401 USA
[3] Missouri Univ Sci & Technol, Dept Civil Architectural & Environm Engn, Civil Engn, 1401 N Pine St,228 Butler Carlton Engn Hall, Rolla, MO 65409 USA
[4] Missouri Univ Sci & Technol, Dept Civil Architectural & Environm Engn, Missouri Consortium Construct Innovat, 1401 N Pine St,228 Butler Carlton Engn Hall, Rolla, MO 65409 USA
[5] Missouri Univ Sci & Technol, Dept Engn Management & Syst Engn, 1401 N Pine St,228 Butler Carlton Engn Hall, Rolla, MO 65409 USA
[6] Univ Nevada, Dept Civil & Environm Engn & Construct, Construct Engn Management, Las Vegas, NV 89154 USA
关键词
IMPACT;
D O I
10.1061/(ASCE)SC.1943-5576.0000640
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The Illinois Department of Transportation (IDOT) will handle many upcoming projects due to the recent statewide infrastructure strategic plan and the fast-track efforts affecting many infrastructure projects amid COVID-19. Nevertheless, many change orders are anticipated to occur on IDOT's projects. Thus, this paper examines the proper contractual management of changes within IDOT infrastructure transportation projects by following a research method based on the integration between a desktop analysis and a focus group analysis. The desktop analysis involved collecting information and data from existing resources, case studies, and documents related to change orders. The focus group analysis involved consulting with change order experts to verify that the outcome of each research step is useful and to validate the final outcomes of the paper. Based on 50 documented major change orders in IDOT projects and three litigated cases, two findings are provided. First, the top causes for key change orders within IDOT projects include contract administration, allowable contingencies, quantity omission or error, differing site conditions, and design changes. Second, the most critical change order related challenges within IDOT's infrastructure projects include approval procedures, compensation considerations, and applicable laws. This paper offers flowcharts, synopsis of opportunities and risks, and a checklist to help the contracting parties better administer change orders. Ultimately, the contributions of this paper to the practice include: (1) minimizing the number and amount of change orders, (2) helping the contracting parties better understand how their individual responsibilities contribute to the proper processing and management of changes and variations, (3) offering contractors the ability to visualize the different steps involved in the approval of change orders, (4) assisting the project stakeholders in identifying change order-related areas for improvement, and (5) allowing project owners to better mitigate, manage, and administer the contractual aspects of change orders. (C) 2021 American Society of Civil Engineers.
引用
收藏
页数:17
相关论文
共 50 条
  • [41] A budget management approach for societal infrastructure projects
    Nishijima, Kazuyoshi
    Faber, Michael H.
    [J]. STRUCTURE AND INFRASTRUCTURE ENGINEERING, 2009, 5 (01) : 41 - 47
  • [42] Hazard Management with DOORS: Rail Infrastructure Projects
    Hughes, Dave
    Saeed, Amer
    [J]. SAFETY-CRITICAL SYSTEMS: PROBLEMS, PROCESS AND PRACTICE, 2009, : 71 - 93
  • [43] Projects Change Management in Based on the Projects Configuration Management for Developing Complex Projects
    Morozov, Viktor
    Kalnichenko, Olena
    Timinsky, Alexander
    Liubyma, Iuliia
    [J]. PROCEEDINGS OF THE 2017 9TH IEEE INTERNATIONAL CONFERENCE ON INTELLIGENT DATA ACQUISITION AND ADVANCED COMPUTING SYSTEMS: TECHNOLOGY AND APPLICATIONS (IDAACS), VOL 2, 2017, : 939 - 941
  • [44] Synergistic Approach to the Management of Transport Infrastructure Projects
    Petrov, Aleksandr
    Geraskina, Inna
    [J]. 12TH INTERNATIONAL CONFERENCE - ORGANIZATION AND TRAFFIC SAFETY MANAGEMENT IN LARGE CITIES SPBOTSIC-2016, 2017, 20 : 499 - 504
  • [45] Quantifying the Influence of Climate Change to Priorities for Infrastructure Projects
    You, Haowen
    Lambert, James H.
    Clarens, Andres F.
    McFarlane, Benjamin J.
    [J]. IEEE TRANSACTIONS ON SYSTEMS MAN CYBERNETICS-SYSTEMS, 2014, 44 (02): : 133 - 145
  • [46] An Investigation of Procedures of Change Orders' Control in Roadway Construction Projects
    Pourrostam, Towhid
    Ismail, Amiruddin
    Soleymanzadeh, Amir
    Ghouyounchizad, Majid
    [J]. TRENDS IN CIVIL ENGINEERING, PTS 1-4, 2012, 446-449 : 3778 - +
  • [47] Impact of change orders on small labor-intensive projects
    Hanna, AS
    Gunduz, M
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2004, 130 (05) : 726 - 733
  • [48] Management of change for reengineering projects
    Fries, S
    [J]. 40TH ANNUAL EOQ CONGRESS, BERLIN, 1996 - PROCEEDINGS, VOL 3, 1996, : 45 - 53
  • [49] VARIATION ORDERS DURING EXECUTION OF CONSTRUCTION INFRASTRUCTURE PROJECTS: CASE STUDY OF AN ELECTRICITY COMPANY
    Mashamba, T.
    Kanakana-Katumba, M. G.
    Maladzhi, R.
    [J]. SOUTH AFRICAN JOURNAL OF INDUSTRIAL ENGINEERING, 2023, 34 (04) : 76 - 90
  • [50] SWOT analysis for using BIM for infrastructure across the whole lifecycle of transportation projects
    Li, Z.
    Guo, F.
    Schaefer, D.
    [J]. SUSTAINABLE BUILDINGS AND STRUCTURES: BUILDING A SUSTAINABLE TOMORROW, 2020, : 351 - 359