Evolutionary Multiobjective Blocking Lot-Streaming Flow Shop Scheduling With Machine Breakdowns

被引:152
|
作者
Han, Yuyan [1 ,2 ]
Gong, Dunwei [2 ,3 ]
Jin, Yaochu [4 ,5 ]
Pan, Quanke [6 ]
机构
[1] Liaocheng Univ, Sch Comp Sci, Liaocheng 252000, Peoples R China
[2] China Univ Min & Technol, Sch Informat & Control Engn, Xuzhou 221116, Jiangsu, Peoples R China
[3] Qingdao Univ Sci & Technol, Sch Informat Sci & Technol, Qingdao 266061, Peoples R China
[4] Dalian Univ Technol, Sch Management Sci & Engn, Dalian 116023, Peoples R China
[5] Univ Surrey, Dept Comp Sci, Guildford GU2 7XH, Surrey, England
[6] Huazhong Univ Sci & Technol, State Key Lab Digital Mfg Equipment & Technol, Wuhan 430074, Hubei, Peoples R China
基金
中国国家自然科学基金;
关键词
Genetic algorithm; lot-streaming; machine breakdown; rescheduling; robustness and stability criteria; GENETIC ALGORITHM; MEMETIC ALGORITHM; SINGLE-MACHINE; ROBUST; OPTIMIZATION; TIMES;
D O I
10.1109/TCYB.2017.2771213
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
In various flow shop scheduling problems, it is very common that a machine suffers from breakdowns. Under this situation, a robust and stable suboptimal scheduling solution is of more practical interest than a global optimal solution that is sensitive to environmental changes. However, blocking lot-streaming flow shop (BLSFS) scheduling problems with machine breakdowns have not yet been well studied up to date. This paper presents, for the first time, a multiobjective model of the above problem including robustness and stability criteria. Based on this model, an evolutionary multiobjective robust scheduling algorithm is suggested, in which solutions obtained by a variant of single-objective heuristic are incorporated into population initialization and two novel crossover operators are proposed to take advantage of nondominated solutions. In addition, a rescheduling strategy based on the local search is presented to further reduce the negative influence resulted from machine breakdowns. The proposed algorithm is applied to 22 test sets, and compared with the state-of-the-art algorithms without machine breakdowns. Our empirical results demonstrate that the proposed algorithm can effectively tackle BLSFS scheduling problems in the presence of machine breakdowns by obtaining scheduling strategies that are robust and stable.
引用
收藏
页码:184 / 197
页数:14
相关论文
共 50 条
  • [31] Improved fruit fly optimization algorithm for solving lot-streaming flow-shop scheduling problem
    Zhang, Peng
    Wang, Ling
    Journal of Donghua University (English Edition), 2014, 31 (02) : 165 - 170
  • [32] Integration of Lot Sizing and Flow Shop Scheduling with Lot Streaming
    Mortezaei, Navid
    Zulkifli, Norzima
    JOURNAL OF APPLIED MATHEMATICS, 2013,
  • [33] Minimizing the mean weighted absolute deviation from due dates in lot-streaming flow shop scheduling
    Yoon, SH
    Ventura, JA
    COMPUTERS & OPERATIONS RESEARCH, 2002, 29 (10) : 1301 - 1315
  • [34] A Discrete Invasive Weed Optimization Algorithm for the No-Wait Lot-Streaming Flow Shop Scheduling Problems
    Sang, Hong-Yan
    Duan, Pei-Yong
    Li, Jun-Qing
    INTELLIGENT COMPUTING THEORIES AND APPLICATION, ICIC 2016, PT I, 2016, 9771 : 517 - 526
  • [35] Improved Meta-Heuristics for Solving Distributed Lot-Streaming Permutation Flow Shop Scheduling Problems
    Pan, Yuxia
    Gao, Kaizhou
    Li, Zhiwu
    Wu, Naiqi
    IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, 2023, 20 (01) : 361 - 371
  • [36] Improved Fruit Fly Optimization Algorithm for Solving Lot-Streaming Flow-Shop Scheduling Problem
    张鹏
    王凌
    Journal of Donghua University(English Edition), 2014, 31 (02) : 165 - 170
  • [37] Lot Streaming Flow Shop with a Heterogeneous Machine
    Ferraro, Augusto
    Rossit, Daniel
    Toncovich, Adrian
    Frutos, Mariano
    ENGINEERING MANAGEMENT JOURNAL, 2019, 31 (02) : 113 - 126
  • [38] Single-lot, lot-streaming problem for a 1+m hybrid flow shop
    Singh, Sanchit
    Sarin, Subhash C.
    Cheng, Ming
    JOURNAL OF GLOBAL OPTIMIZATION, 2024, 89 (02) : 435 - 455
  • [39] An improved NSGA-II algorithm for multi-objective lot-streaming flow shop scheduling problem
    Han, Yu-Yan
    Gong, Dun-wei
    Sun, Xiao-Yan
    Pan, Quan-Ke
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2014, 52 (08) : 2211 - 2231
  • [40] Solving Biobjective Distributed Flow-Shop Scheduling Problems With Lot-Streaming Using an Improved Jaya Algorithm
    Pan, Yuxia
    Gao, Kaizhou
    Li, Zhiwu
    Wu, Naiqi
    IEEE TRANSACTIONS ON CYBERNETICS, 2023, 53 (06) : 3818 - 3828