Extended preventive replacement policy for a two-unit system subject to damage shocks

被引:17
|
作者
Sheu, Shey-Huei [1 ,2 ]
Liu, Tzu-Hsin [1 ]
Zhang, Zhe George [3 ,4 ]
Ke, Jau-Chuan [5 ]
机构
[1] Providence Univ, Dept Stat & Informat Sci, Taichung, Taiwan
[2] Natl Taiwan Univ Sci & Technol, Dept Ind Management, Taipei, Taiwan
[3] Western Washington Univ, Dept Decis Sci, Bellingham, WA 98225 USA
[4] Simon Fraser Univ, Beedie Sch Business, Burnaby, BC V5A 1S6, Canada
[5] Natl Taichung Univ Sci & Technol, Dept Appl Stat, Taichung, Taiwan
关键词
cumulative damage model; optimisation; shock model; replacement policy; MINIMAL REPAIR; MODEL; LAST;
D O I
10.1080/00207543.2015.1005250
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
We consider a system consisting of two units (A and B), which is subject to two types of shocks (I and II) that occur according to a non-homogeneous Poisson process. The probabilities of these two shock types are age-dependent. Each type-I shock causes a minor failure of unit A, which can be corrected by a minimal repair. Meanwhile, this type of shock results in a certain amount of damage to unit B. These damages to unit B are accumulated to trigger a preventive replacement (PM) or a corrective replacement (CM) action. In addition, a minor failure for unit B with the cumulative damage of z will occur with probability pi (z) at a type-I shock instant. Type-II shock is a major one that causes system replacement. We consider a two-dimensional PM policy, which prescribes that the system is preventively replaced at age T, or at the time when the total damage to unit B exceeds a prespecified level Z (but less than the failure level K where K>Z) or is replaced correctively at first type-II shock or when the total damage to unit B exceeds a failure level K, whichever occurs first. Thus, both PM and CM actions may be performed in our model. To minimise the expected cost per unit time, the optimal policy (T*, Z*) is derived analytically and determined numerically. We also show that our model is a generalisation of many previous maintenance models in the literature.
引用
收藏
页码:4614 / 4628
页数:15
相关论文
共 50 条
  • [31] Generalized sequential preventive maintenance policy of a system subject to shocks
    Sheu, SH
    Chang, TH
    INTERNATIONAL JOURNAL OF SYSTEMS SCIENCE, 2002, 33 (04) : 267 - 276
  • [32] Extended optimal replacement policy for a system subject to non-homogeneous pure birth shocks
    Sheu, Shey-Huei
    Chen, Yen-Luan
    Chang, Chin-Chih
    Zhang, Zhe George
    COMPUTERS & INDUSTRIAL ENGINEERING, 2013, 64 (02) : 573 - 579
  • [33] Extended replacement policy for a system under shocks effect
    Sheu, Shey-Huei
    Liu, Tzu-Hsin
    Sheu, Wei-Teng
    Chien, Yu-Hung
    Zhang, Zhe-George
    ANNALS OF OPERATIONS RESEARCH, 2024, 340 (01) : 507 - 530
  • [34] ONE UNIT RELIABILITY SYSTEM SUBJECT TO RANDOM SHOCKS AND PREVENTIVE MAINTENANCE
    ALALI, AA
    MURARI, K
    MICROELECTRONICS AND RELIABILITY, 1988, 28 (03): : 373 - 377
  • [35] OPTIMAL MAINTENANCE POLICY OF A TWO-UNIT STANDBY SYSTEM.
    Kawai, Hajime
    Transactions of the Institute of Electronics and Communication Engineers of Japan. Section E, 1981, E64 (09): : 579 - 582
  • [36] Extended Periodic Inspection Policies for a Single Unit System Subject to Shocks
    Wang, Jing
    Dong, Wenjie
    Fang, Zhigeng
    IEEE ACCESS, 2020, 8 : 119300 - 119311
  • [37] Opportunity-based age replacement policy of a system subject to shocks
    Jhang, JP
    SAFETY AND RELIABILITY, VOLS 1 & 2, 1999, : 91 - 96
  • [38] Optimal number of repairs before replacement for a two-unit system subject to non-homogeneous pure birth process
    Sheu, Shey-Huei
    Liu, Tzu-Hsin
    Zhang, Zhe-George
    Chang, Tsan-Ming
    COMPUTERS & INDUSTRIAL ENGINEERING, 2014, 69 : 71 - 76
  • [39] A multi-criteria optimal replacement policy for a system subject to shocks
    Chang, Chin-Chih
    Sheu, Shey-Huei
    Chen, Yen-Luan
    Zhang, Zhe George
    COMPUTERS & INDUSTRIAL ENGINEERING, 2011, 61 (04) : 1035 - 1043
  • [40] Stochastic analysis of a two-unit system with standby and server failure subject to inspection
    M. S. Barak
    Dhiraj Yadav
    Sudesh Kumari
    Life Cycle Reliability and Safety Engineering, 2018, 7 (1) : 23 - 32