A bi-objective model for robust berth allocation scheduling

被引:89
|
作者
Zhen, Lu [1 ]
Chang, Dao-Fang [2 ]
机构
[1] Shanghai Univ, Sch Management, Shanghai 200444, Peoples R China
[2] Shanghai Maritime Univ, Sch Logist Engn, Shanghai, Peoples R China
关键词
Port operation; Berth allocation; Proactive scheduling; Multi-objective optimization; CONTAINER TERMINALS; HEURISTICS; TEMPLATE;
D O I
10.1016/j.cie.2012.03.003
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Berth allocation is an important port operation problem for container terminals. This paper studies how to develop a robust schedule for berth allocation that incorporates a degree of anticipation of uncertainty (e.g., vessels' arrival time and operation time) during the schedule's execution. This study proposes a bi-objective optimization model for minimizing cost and maximizing robustness of schedules. A heuristic is also developed for solving the hi-objective model in large-scale problem cases. Numerical experiments are conducted to validate the effectiveness and efficiency of the proposed model and method. Managerial implications are also discussed. (C) 2012 Elsevier Ltd. All rights reserved.
引用
收藏
页码:262 / 273
页数:12
相关论文
共 50 条
  • [1] A bi-objective robust model for berth allocation scheduling under uncertainty
    Xiang Xi
    Liu Changchun
    Miao Lixin
    [J]. TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW, 2017, 106 : 294 - 319
  • [2] A bi-objective model for robust yard allocation scheduling for outbound containers
    Liu, Changchun
    Zhang, Canrong
    Zheng, Li
    [J]. ENGINEERING OPTIMIZATION, 2017, 49 (01) : 113 - 135
  • [3] A robust bi-objective mathematical model for disaster rescue units allocation and scheduling with learning effect
    Tirkolaee, Erfan Babaee
    Aydin, Nadi Serhan
    Ranjbar-Bourani, Mehdi
    Weber, Gerhard-Wilhelm
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2020, 149
  • [4] The integration of resource allocation and time buffering for bi-objective robust project scheduling
    Liang, Yangyang
    Cui, Nanfang
    Hu, Xuejun
    Demeulemeester, Erik
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2020, 58 (13) : 3839 - 3854
  • [5] A bi-objective evolutionary approach to robust scheduling
    Surico, Michele
    Kaymak, Uzay
    Naso, David
    Dekker, Rommert
    [J]. 2007 IEEE INTERNATIONAL CONFERENCE ON FUZZY SYSTEMS, VOLS 1-4, 2007, : 1637 - +
  • [6] Stable maintenance tasks scheduling: A bi-objective robust optimization model
    Golpira, Heris
    Tirkolaee, Erfan Babaee
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2019, 137
  • [7] A bi-objective robust model for emergency resource allocation under uncertainty
    Hu, C. L.
    Liu, X.
    Hua, Y. K.
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2016, 54 (24) : 7421 - 7438
  • [8] A bi-objective model for robust resource-constrained project scheduling
    Al-Fawzan, MA
    Haouari, M
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2005, 96 (02) : 175 - 187
  • [9] A bi-objective berth allocation formulation to account for vessel handling time uncertainty
    Golias, Mihalis M.
    [J]. MARITIME ECONOMICS & LOGISTICS, 2011, 13 (04) : 419 - 441
  • [10] A bi-objective berth allocation formulation to account for vessel handling time uncertainty
    Mihalis M Golias
    [J]. Maritime Economics & Logistics, 2011, 13 : 419 - 441