A bi-objective evolutionary approach to robust scheduling

被引:0
|
作者
Surico, Michele [1 ]
Kaymak, Uzay [2 ]
Naso, David [1 ]
Dekker, Rommert [2 ]
机构
[1] Dipartimento Elettrotecn & Elettron, Via Re David 200, I-70125 Bari, Italy
[2] Erasmus Univ, Inst Econometr, Erasmus Sch Econom, Rotterdam, Netherlands
关键词
D O I
暂无
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
The production and delivery of rapidly perishable goods in distributed supply networks involves a number of tightly coupled decision and optimisation problems regarding the just-in-time production scheduling and the routing of the delivery vehicles in order to satisfy strict customer specified time-windows. Besides dealing with the typical combinatorial complexity related to activity assignment and synchronisation, effective methods must also provide robust schedules, coping with the stochastic perturbations (typically transportation delays) affecting the distribution process. In this paper, we propose a novel bi-objective meta-heuristic approach for robust scheduling. The proposed algorithm returns a set of solutions with different cost and risk tradeoffs, allowing the analyst to adapt the planning depending on the attitude to risk. The effectiveness of the approach is demonstrated by a real-world case concerning the production and distribution of ready-mixed concrete.
引用
收藏
页码:1637 / +
页数:2
相关论文
共 50 条
  • [1] A bi-objective model for robust berth allocation scheduling
    Zhen, Lu
    Chang, Dao-Fang
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2012, 63 (01) : 262 - 273
  • [2] A Pareto evolutionary algorithm approach to bi-objective unrelated parallel machine scheduling problems
    Chyu, Chiuh-Cheng
    Chang, Wei-Shung
    [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2010, 49 (5-8): : 697 - 708
  • [3] A Pareto evolutionary algorithm approach to bi-objective unrelated parallel machine scheduling problems
    Chiuh-Cheng Chyu
    Wei-Shung Chang
    [J]. The International Journal of Advanced Manufacturing Technology, 2010, 49 : 697 - 708
  • [4] Infeasibility Driven Approach for Bi-objective Evolutionary Optimization
    Sharma, Deepak
    Soren, Prem
    [J]. 2013 IEEE CONGRESS ON EVOLUTIONARY COMPUTATION (CEC), 2013, : 868 - 875
  • [5] Bi-objective robust optimisation
    Kuhn, K.
    Raith, A.
    Schmidt, M.
    Schoebel, A.
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2016, 252 (02) : 418 - 431
  • [6] Stable maintenance tasks scheduling: A bi-objective robust optimization model
    Golpira, Heris
    Tirkolaee, Erfan Babaee
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2019, 137
  • [7] A bi-objective robust model for berth allocation scheduling under uncertainty
    Xiang Xi
    Liu Changchun
    Miao Lixin
    [J]. TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW, 2017, 106 : 294 - 319
  • [8] A bi-objective model for robust yard allocation scheduling for outbound containers
    Liu, Changchun
    Zhang, Canrong
    Zheng, Li
    [J]. ENGINEERING OPTIMIZATION, 2017, 49 (01) : 113 - 135
  • [9] A bi-objective model for robust resource-constrained project scheduling
    Al-Fawzan, MA
    Haouari, M
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2005, 96 (02) : 175 - 187
  • [10] A Comparative Analysis of Accurate and Robust Bi-objective Scheduling Heuristics for Datacenters
    Nesmachnow, Sergio
    Dorronsoro, Bernabe
    [J]. INFORMATION PROCESSING AND MANAGEMENT OF UNCERTAINTY IN KNOWLEDGE-BASED SYSTEMS: APPLICATIONS, IPMU 2018, PT III, 2018, 855 : 223 - 235