Optimally routing and scheduling tow trains for JIT-supply of mixed-model assembly lines

被引:88
|
作者
Emde, Simon [1 ]
Boysen, Nils [1 ]
机构
[1] Univ Jena, Lehrstuhl Operat Management, D-07743 Jena, Germany
关键词
Mixed-model assembly lines; Just-in-Time; Material supply; Tow trains; ENVIRONMENT; SYSTEM;
D O I
10.1016/j.ejor.2011.09.013
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
In recent years, more and more automobile producers adopted the supermarket-concept to enable a flexible and reliable Just-in-Time (JIT) part supply of their mixed-model assembly lines. Within this concept, a supermarket is a decentralized in-house logistics area where parts are intermediately stored and then loaded on small tow trains. These tow trains travel across the shop floor on specific routes to make frequent small-lot deliveries which are needed by the stations of the line. To enable a reliable part supply in line with the JIT-principle, the interdependent problems of routing, that is, partitioning stations to be supplied among tow trains, and scheduling, i.e., deciding on the start times of each tow train's tours through its assigned stations, need to be solved. This paper introduces an exact solution procedure which solves both problems simultaneously in polynomial runtime. Additionally, management implications regarding the trade-off between number and capacity of tow trains and in-process inventory near the line are investigated within a comprehensive computational study. (C) 2011 Elsevier B.V. All rights reserved.
引用
下载
收藏
页码:287 / 299
页数:13
相关论文
共 50 条
  • [21] Produktionsprogrammplanung bei VariantenfließfertigungMaster scheduling in mixed-model assembly lines
    Nils Boysen
    Zeitschrift für Planung & Unternehmenssteuerung, 2005, 16 (1): : 53 - 72
  • [22] Level scheduling of mixed-model assembly lines under storage constraints
    Boysen, Nils
    Fliedner, Malte
    Scholl, Armin
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2009, 47 (10) : 2669 - 2684
  • [23] Scheduling Mixed-Model Assembly Lines with Cost Objectives by a Hybrid Algorithm
    Wang, Binggang
    Rao, Yunqing
    Shao, Xinyu
    Wang, Mengchang
    INTELLIGENT ROBOTICS AND APPLICATIONS, PT II, PROCEEDINGS, 2008, 5315 : 378 - 387
  • [24] A dynamic part supply method for automated mixed-model assembly lines
    Dong, Jietao
    Zhang, Linxuan
    Xiao, Tianyuan
    Li, Hui
    PROCEEDINGS OF THE 2015 IEEE 19TH INTERNATIONAL CONFERENCE ON COMPUTER SUPPORTED COOPERATIVE WORK IN DESIGN (CSCWD), 2015, : 523 - 527
  • [25] Part Supply Method for Mixed-Model Assembly Lines with Decentralized Supermarkets
    Jietao Dong
    Linxuan Zhang
    Tianyuan Xiao
    Tsinghua Science and Technology, 2016, 21 (04) : 426 - 434
  • [26] Part Supply Method for Mixed-Model Assembly Lines with Decentralized Supermarkets
    Dong, Jietao
    Zhang, Linxuan
    Xiao, Tianyuan
    TSINGHUA SCIENCE AND TECHNOLOGY, 2016, 21 (04) : 426 - 434
  • [27] A simulation analysis for two-level sequence-scheduling for just-in-time (JIT) mixed-model assembly lines
    Aigbedo, H
    Monden, Y
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1996, 34 (11) : 3107 - 3124
  • [28] Master production scheduling and sequencing at mixed-model assembly lines in the automotive industry
    Jan Dörmer
    Hans-Otto Günther
    Rico Gujjula
    Flexible Services and Manufacturing Journal, 2015, 27 : 1 - 29
  • [29] Master production scheduling and sequencing at mixed-model assembly lines in the automotive industry
    Doermer, Jan
    Guenther, Hans-Otto
    Gujjula, Rico
    FLEXIBLE SERVICES AND MANUFACTURING JOURNAL, 2015, 27 (01) : 1 - 29
  • [30] ALGORITHMS FOR REAL-TIME SCHEDULING OF JOBS ON MIXED-MODEL ASSEMBLY LINES
    BOLAT, A
    SAVSAR, M
    ALFAWZAN, MA
    COMPUTERS & OPERATIONS RESEARCH, 1994, 21 (05) : 487 - 498