Two-stage optimal scheduling of virtual power plant with wind-photovoltaic-hydro-storage considering flexible load reserve

被引:4
|
作者
Chen, Yuge [1 ]
Du, Qianyun [2 ]
Wu, Mengkai [2 ]
Yang, Li [3 ]
Wang, Huifang [3 ]
Lin, Zhenzhi [3 ]
机构
[1] Zhejiang Univ, Polytech Inst, Hangzhou 310015, Peoples R China
[2] State Grid Lishui Power Supply Co, Lishui 323020, Peoples R China
[3] Zhejiang Univ, Coll Elect Engn, Hangzhou 310027, Peoples R China
关键词
Virtual power plant (VPP); Flexible load reserve (FLR); Two-stage; Rolling optimization; Renewable energy consumption; SYSTEM; OPERATION; STRATEGY; CVAR;
D O I
10.1016/j.egyr.2022.05.268
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
In view of the current situation of China's power system to make regulation for power generation and load side balance mainly by power plants that are subject to unified scheduling, the existing non-uniformly scheduled small hydropower resources of China can be integrated and utilized effectively when considering the aggregation and control of virtual power plant (VPP) towards distributed resources. Meanwhile, the economic operation of VPP under different seasons of rivers can be achieved, and the consumption of renewable energy such as wind power and photovoltaic (PV) can be promoted. In addition, a certain flexible load reserve (FLR) capacity can be obtained by signing medium and long-term contracts. In this context, a day-ahead and real-time two-stage rolling optimal scheduling strategy for VPP including distributed wind power, PV, and small hydropower is proposed. In the day-ahead stage, aiming at the minimization of operation cost and adopting the multi-scenarios analysis method, the day-ahead scheduling and FLR plan of VPP is formulated. In the real-time stage, with preciser wind and PV prediction, the economic scheduling considering deviation penalty cost can be achieved. The case study of VPP in Jingning County, Lishui City, Zhejiang Province of China verifies the effectiveness and practicability of the proposed method. (C) 2022 The Author(s). Published by Elsevier Ltd.
引用
收藏
页码:848 / 856
页数:9
相关论文
共 50 条
  • [41] Source-load-storage Coordinated Optimal Scheduling of Virtual Power Plant Participating Demand Response
    Wang, Zhengtao
    Kong, Xiangyu
    Zhang, Siqiong
    Chen, Ke
    Chen, Songsong
    Li, Dezhi
    [J]. 2020 23RD INTERNATIONAL CONFERENCE ON ELECTRICAL MACHINES AND SYSTEMS (ICEMS), 2020, : 472 - 477
  • [42] Optimal Scheduling Strategy of Building Integrated Photovoltaic Microgrid Considering Virtual Energy Storage
    Cheng, Zhiping
    Li, Xiang
    Li, Zhongwen
    Si, Jikai
    Xu, Shuai
    Nie, Rui
    [J]. APPLIED SCIENCES-BASEL, 2020, 10 (18):
  • [43] Two-stage AC/DC optimal power flow with VSC-MTDC considering uncertainty of wind power
    Yang, Zhelin
    Wang, Keyou
    Li, Guojie
    [J]. Dianli Xitong Baohu yu Kongzhi/Power System Protection and Control, 2020, 48 (14): : 25 - 34
  • [44] Dynamic Scheduling Optimization Model for Virtual Power Plant Connecting With Wind-Photovoltaic-Energy Storage System
    Wang Yao
    Shi Zheng
    Wang Zheng
    Wang Jiawei
    Li Xuxia
    Zheng Yuming
    Wang Peng
    Hu Yingying
    Deng Jiaojiao
    [J]. 2017 IEEE CONFERENCE ON ENERGY INTERNET AND ENERGY SYSTEM INTEGRATION (EI2), 2017, : 36 - 41
  • [45] Two-Stage Optimal Scheduling of Large-Scale Renewable Energy System Considering the Uncertainty of Generation and Load
    Kong, Xiangyu
    Quan, Shuping
    Sun, Fangyuan
    Chen, Zhengguang
    Wang, Xingguo
    Zhou, Zexin
    [J]. APPLIED SCIENCES-BASEL, 2020, 10 (03):
  • [46] TWO-STAGE OPTIMAL SCHEDULING CONSIDERING CCGP AND LOW-CARBON NATURE OF SOURCE SIDE AND LOAD SIDE
    Zhang, Panzhao
    Xie, Lirong
    Yang, Jianbin
    Ma, Ruizhen
    Ma, Wei
    [J]. Taiyangneng Xuebao/Acta Energiae Solaris Sinica, 2023, 44 (05): : 336 - 341
  • [47] Virtual Power Plant's Optimal Scheduling Strategy in Day-Ahead and Balancing Markets Considering Reserve Provision Model of Energy Storage System
    Hong, Nhung Nguyen
    Duc, Huy Nguyen
    [J]. APPLIED SCIENCES-BASEL, 2024, 14 (05):
  • [48] Multi-time Scale Simulation of Optimal Scheduling Strategy for Virtual Power Plant Considering Load Response
    Chao, Huang
    Quan, Ding
    Yang, Tong
    [J]. 2018 INTERNATIONAL CONFERENCE ON POWER SYSTEM TECHNOLOGY (POWERCON), 2018, : 2142 - 2148
  • [49] Two-stage chance-constrained unit commitment based on optimal wind power consumption point considering battery energy storage
    Chen, Zhe
    Li, Zhengshuo
    Guo, Chuangxin
    Ding, Yi
    He, Yubin
    [J]. IET GENERATION TRANSMISSION & DISTRIBUTION, 2020, 14 (18) : 3738 - 3749
  • [50] Two-stage optimal scheduling of air conditioning resources with high photovoltaic penetrations
    Wang, Dongxiao
    Wu, Runji
    Li, Xuecong
    Lai, Chun Sing
    Wu, Xueqing
    Wei, Jinxiao
    Xu, Yi
    Wu, Wanli
    Lai, Loi Lei
    [J]. JOURNAL OF CLEANER PRODUCTION, 2019, 241