Two-stage optimal scheduling of virtual power plant with wind-photovoltaic-hydro-storage considering flexible load reserve

被引:4
|
作者
Chen, Yuge [1 ]
Du, Qianyun [2 ]
Wu, Mengkai [2 ]
Yang, Li [3 ]
Wang, Huifang [3 ]
Lin, Zhenzhi [3 ]
机构
[1] Zhejiang Univ, Polytech Inst, Hangzhou 310015, Peoples R China
[2] State Grid Lishui Power Supply Co, Lishui 323020, Peoples R China
[3] Zhejiang Univ, Coll Elect Engn, Hangzhou 310027, Peoples R China
关键词
Virtual power plant (VPP); Flexible load reserve (FLR); Two-stage; Rolling optimization; Renewable energy consumption; SYSTEM; OPERATION; STRATEGY; CVAR;
D O I
10.1016/j.egyr.2022.05.268
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
In view of the current situation of China's power system to make regulation for power generation and load side balance mainly by power plants that are subject to unified scheduling, the existing non-uniformly scheduled small hydropower resources of China can be integrated and utilized effectively when considering the aggregation and control of virtual power plant (VPP) towards distributed resources. Meanwhile, the economic operation of VPP under different seasons of rivers can be achieved, and the consumption of renewable energy such as wind power and photovoltaic (PV) can be promoted. In addition, a certain flexible load reserve (FLR) capacity can be obtained by signing medium and long-term contracts. In this context, a day-ahead and real-time two-stage rolling optimal scheduling strategy for VPP including distributed wind power, PV, and small hydropower is proposed. In the day-ahead stage, aiming at the minimization of operation cost and adopting the multi-scenarios analysis method, the day-ahead scheduling and FLR plan of VPP is formulated. In the real-time stage, with preciser wind and PV prediction, the economic scheduling considering deviation penalty cost can be achieved. The case study of VPP in Jingning County, Lishui City, Zhejiang Province of China verifies the effectiveness and practicability of the proposed method. (C) 2022 The Author(s). Published by Elsevier Ltd.
引用
收藏
页码:848 / 856
页数:9
相关论文
共 50 条
  • [1] Two-stage stochastic robust optimal scheduling of virtual power plant considering source load uncertainty
    Zhang, Xiaohui
    Liu, Yufei
    [J]. ENGINEERING REPORTS, 2024,
  • [2] Two-stage Optimal Scheduling of Virtual Power Plant with Wind-Photovoltaic-Storage-Electric Vehicles in the Day-ahead Market
    Nhung Nguyen Hong
    Quan Dang Minh
    Phuc Vu Minh
    [J]. 2023 ASIA MEETING ON ENVIRONMENT AND ELECTRICAL ENGINEERING, EEE-AM, 2023,
  • [3] Two-Stage Congestion Management Considering Virtual Power Plant With Cascade Hydro-Photovoltaic-Pumped Storage Hybrid Generation
    Lou, Nan
    Zhang, Yong
    Wang, Yuqin
    Liu, Qixing
    Li, Huiyong
    Sun, Yu
    Guo, Zongtian
    [J]. IEEE ACCESS, 2020, 8 : 186335 - 186347
  • [4] Two-stage robust optimal scheduling of wind power-photovoltaic-thermal power-pumped storage combined system
    Luo, Yuanxiang
    Wang, Yuhang
    Liu, Cheng
    Fan, Lidong
    [J]. IET RENEWABLE POWER GENERATION, 2022, 16 (13) : 2881 - 2891
  • [5] Two-stage Robust Optimal Dispatch Method Considering Wind Power and Load Correlation
    Liu, Xinyuan
    Zhang, Zhi
    Wang, Weiru
    Zheng, Huiping
    Hao, Jie
    Chen, Yanbo
    [J]. 2018 2ND IEEE CONFERENCE ON ENERGY INTERNET AND ENERGY SYSTEM INTEGRATION (EI2), 2018,
  • [6] Optimal Reserve and Energy Scheduling for a Virtual Power Plant Considering Reserve Activation Probability
    Huy Nguyen Duc
    Nhung Nguyen Hong
    [J]. APPLIED SCIENCES-BASEL, 2021, 11 (20):
  • [7] Two-stage robust optimal scheduling of virtual power plant based on energy blockchain
    Ren, Jianwen
    Zhang, Qingqing
    [J]. Dianli Zidonghua Shebei/Electric Power Automation Equipment, 2020, 40 (08): : 23 - 30
  • [8] Two-stage stochastic scheduling model of wind-photovoltaic-storage providing flexible ramp capacity
    Huang, Ruanming
    He, Xinqin
    Zhao, Jingjing
    Fei, Fei
    Guo, Mingxing
    [J]. FOURTH INTERNATIONAL CONFERENCE ON ENERGY ENGINEERING AND ENVIRONMENTAL PROTECTION, 2020, 467
  • [9] Two-stage Optimization of Load Restoration Considering Integration of Wind Power
    Qiu, Chenguang
    Cheng, Jinmin
    Liu, Zhihang
    Gao, Yunbo
    Zang, Haixiang
    [J]. PROCEEDINGS OF THE 2018 13TH IEEE CONFERENCE ON INDUSTRIAL ELECTRONICS AND APPLICATIONS (ICIEA 2018), 2018, : 2642 - 2647
  • [10] Two-stage optimal scheduling of a wind, photovoltaic, gas turbine, fuel cell and storage energy microgrid considering demand-side management
    Zhang, Cheng
    Kuang, Yu
    Liu, Jiajing
    Lin, Guqing
    Jin, Tao
    [J]. Dianli Xitong Baohu yu Kongzhi/Power System Protection and Control, 2022, 50 (24): : 13 - 22