Automated Crane Planning and Optimization for modular construction

被引:63
|
作者
Taghaddos, Hosein [1 ]
Hermann, Ulrich [2 ]
Abbasi, ArioBarzan [1 ]
机构
[1] Univ Tehran, Sch Civil Engn, Coll Engn, POB 11155-4563, Tehran, Iran
[2] PCL Ind Management Inc, Edmonton, AB T6E 3P4, Canada
基金
加拿大自然科学与工程研究理事会;
关键词
Modular construction; Industrial plant; Mobile cranes; Lift planning; Crane configuration; Optimum position; HEAVY LIFTS; PATH; SELECTION; ALGORITHM; LOCATION;
D O I
10.1016/j.autcon.2018.07.009
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The majority of industrial projects in Alberta's oil sands are constructed using modular construction. Modules are preassembled components built off-site and transported to the site to be lifted into place with mobile cranes. Heavy lifts include modules as well as major equipment that utilize expensive mobile cranes. Selecting the proper mobile cranes and configurations and finding the best crane position for each lift saves a significant amount of time and cost, while also improving safety. A heavy lift plan facilitates overall site management by reducing extra crane relocations and avoiding dangerous crane clashes. Performing such intensive analysis manually for several hundred lifts and various crane options is a tedious, prolonged exercise. However, no application that carries out such intensive analysis for a number of lifts in modular construction has yet been developed. This paper presents a system, called Automated Crane Planning and Optimization, to automate the above-mentioned analysis for a large-scale project. This system is validated on actual modular projects.
引用
收藏
页码:219 / 232
页数:14
相关论文
共 50 条
  • [31] Evolution of the crane selection and on-site utilization process for modular construction multilifts
    Olearczyk, Jacek
    Al-Hussein, Mohamed
    Bouferguene, Ahmed
    [J]. AUTOMATION IN CONSTRUCTION, 2014, 43 : 59 - 72
  • [32] Automated path planning of cooperative crane lifts using heuristic search
    Sivakumar, P
    Varghese, K
    Babu, NR
    [J]. JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 2003, 17 (03) : 197 - 207
  • [33] Developing a fast and accurate collision detection strategy for crane-lift path planning in high-rise modular integrated construction
    Zhu, Aimin
    Zhang, Zhiqian
    Pan, Wei
    [J]. ADVANCED ENGINEERING INFORMATICS, 2024, 61
  • [34] Integrating BIM and Optimization Techniques for Enhanced Tower Crane Planning
    Ji, Yuanshen
    Sankaran, Bharathwaj
    Choi, Jiyong
    Leite, Fernanda
    [J]. COMPUTING IN CIVIL ENGINEERING 2017: INFORMATION MODELLING AND DATA ANALYTICS, 2017, : 67 - 74
  • [35] Optimization of Prefabricated Components in Housing Modular Construction
    Nam, Sunghoon
    Yoon, Jongsik
    Kim, Kyungrai
    Choi, Byungjoo
    [J]. SUSTAINABILITY, 2020, 12 (24) : 1 - 22
  • [36] THE CONSTRUCTION AND OPTIMIZATION OF MODULAR PYRAMID CONVOLUTION SCHEMES
    TARASENKO, VP
    CONEV, VK
    [J]. AVTOMATIKA I VYCHISLITELNAYA TEKHNIKA, 1983, (06): : 41 - 47
  • [37] Enhanced crane operations in construction using service request optimization
    Zavichi, Arnir
    Madani, Kaveh
    Xanthopoulos, Petros
    Oloufa, Amr A.
    [J]. AUTOMATION IN CONSTRUCTION, 2014, 47 : 69 - 77
  • [38] Safety Aspects in Planning and Construction of Modular Production Plants
    Fleischer, Christoph
    Wittmann, Juri
    Kockmann, Norbert
    Bieringer, Thomas
    Bramsiepe, Christian
    [J]. CHEMIE INGENIEUR TECHNIK, 2015, 87 (09) : 1258 - 1269
  • [39] Enhanced crane operations in construction using service request optimization
    Zavichi, Amir
    Madani, Kaveh
    Xanthopoulos, Petros
    Oloufa, Amr A.
    [J]. Automation in Construction, 2014, 47 : 69 - 77
  • [40] Planning of Mobile Crane Walking Operations in Congested Industrial Construction Sites
    Aghajamali, Kamyab
    Tak, Ala Nekouvaght
    Taghaddos, Hosein
    Mousaei, Ali
    Behzadipour, Saeed
    Hermann, Ulrich
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2023, 149 (07)