Feature Selection for Waiting Time Predictions in Semiconductor Wafer Fabs

被引:2
|
作者
Schelthoff, Kai [1 ]
Jacobi, Christoph [2 ]
Schlosser, Eva [2 ]
Plohmann, David [2 ]
Janus, Michel [1 ]
Furmans, Kai [2 ]
机构
[1] Robert Bosch GmbH, RtP1 MFD2 SCO Dept, D-72762 Reutlingen, Germany
[2] Karlsruhe Inst Technol, Inst Mat Handling & Logist, D-76131 Karlsruhe, Germany
关键词
Production; Queueing analysis; Predictive models; Semiconductor device modeling; Feature extraction; Analytical models; Task analysis; Semiconductor manufacturing; high product-mix low-volume; feature selection; waiting time prediction; random forest regression; machine learning; permutation feature importance; JOB CYCLE TIME; ENSEMBLE;
D O I
10.1109/TSM.2022.3182855
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Based on real operational data from the Robert Bosch GmbH, we investigate influencing features for waiting time estimation of operations in high product-mix / low-volume semiconductor manufacturing fabs. We define waiting time as the elapsed time between completing the previous operation and starting the next one. In addition to well-established features, we introduce novel features to capture the complexity of the manufacturing environment. To the best of our knowledge, we are the first to attempt waiting time estimation in a high product-mix / low-volume semiconductor fab. We present a framework for feature selection which is composed of three steps: First, random forest models are trained for each operation. Second, a permutation feature importance (PFI) for the full set of features for each operation is computed and the performance is statistically evaluated. The optimal subset of features is then chosen by a sequential backward search based on the PFI values. Third, the performance in terms of the coefficient of determination of each optimized model is evaluated by means of the initial performance. We apply the framework to real operational data from the production areas Lithography and Diffusion and conclude that the feature set can be reduced significantly, while the prediction performance remains equal. The novel features are found to be frequently used when estimating waiting times in the investigated use case.
引用
收藏
页码:546 / 555
页数:10
相关论文
共 50 条
  • [1] Ranking routes in semiconductor wafer fabs
    Gupta, Shreya
    Hasenbein, John J.
    Kim, Byeongdong
    SCIENTIFIC REPORTS, 2023, 13 (01)
  • [2] Ranking routes in semiconductor wafer fabs
    Shreya Gupta
    John J. Hasenbein
    Byeongdong Kim
    Scientific Reports, 13
  • [3] A Data Driven Cycle Time Prediction With Feature Selection in a Semiconductor Wafer Fabrication System
    Wang, Junliang
    Zhang, Jie
    Wang, Xiaoxi
    IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, 2018, 31 (01) : 173 - 182
  • [4] A tool portfolio planning methodology for semiconductor wafer fabs
    Kao, CE
    Chou, YC
    2000 SEMICONDUCTOR MANUFACTURING TECHNOLOGY WORKSHOP, 2000, : 84 - 90
  • [5] Performance evaluation system for scheduling semiconductor wafer fabs
    Xu, XH
    Qiao, F
    Li, L
    Fang, M
    PROCEEDINGS OF THE INTERNATIONAL CONFERENCE ON MECHANICAL ENGINEERING AND MECHANICS 2005, VOLS 1 AND 2, 2005, : 1604 - 1609
  • [6] AMHS FACTORS ENABLING SMALL WAFER LOT MANUFACTURING IN SEMICONDUCTOR WAFER FABS
    Jimenez, Jesus A.
    Wright, Robert
    Bell, Michael
    Grosser, Alexander
    Adikaram, Charitha
    Davila, Victoria
    PROCEEDINGS OF THE 2010 WINTER SIMULATION CONFERENCE, 2010, : 2575 - 2585
  • [7] Big data analytics for cycle time related feature selection in the semiconductor wafer fabrication system
    Wang, Junliang
    Zheng, Peng
    Zhang, Jie
    COMPUTERS & INDUSTRIAL ENGINEERING, 2020, 143
  • [8] Designing a Sustainable and Distributed Generation System for Semiconductor Wafer Fabs
    Villarreal, Saul
    Jimenez, Jesus A.
    Jin, Tongdan
    Cabrera-Rios, Mauricio
    IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, 2013, 10 (01) : 16 - 26
  • [9] CHALLENGES AND SOLUTION APPROACHES FOR THE ONLINE SIMULATION OF SEMICONDUCTOR WAFER FABS
    Noack, Daniel
    Mosinski, Marcin
    Rose, Oliver
    Lendermann, Peter
    Gan, Boon Ping
    Scholl, Wolfgang
    PROCEEDINGS OF THE 2011 WINTER SIMULATION CONFERENCE (WSC), 2011, : 1840 - 1851
  • [10] Scheduling of multiple in-line steppers for semiconductor wafer fabs
    Chiou, Chie-Wun
    Wu, Muh-Cherng
    INTERNATIONAL JOURNAL OF SYSTEMS SCIENCE, 2014, 45 (03) : 384 - 398