Diagnostic and timing supports for top-up injection operation for the TLS

被引:0
|
作者
Hu, K. H. [1 ]
Lee, Demi [1 ]
Wu, C. Y. [1 ]
Hsu, S. Y. [1 ]
Chen, Jenny [1 ]
Kuo, C. H. [1 ]
Wang, C. J. [1 ]
Chiu, P. C. [1 ]
Hsu, K. T. [1 ]
机构
[1] Natl Synchrotron Radiat Res Ctr, Hsinchu 30076, Taiwan
关键词
D O I
暂无
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
Routine top-up operation of Taiwan Light Source (TLS) was to commence from October 2005 after high efficiency multi-bunch instabilities suppression system put into service. Long-term 360 mA top-up operation has been tested and proven its successful and steady performance. Short-term 400 mA top-up run is also demonstrated. The TLS is current operated at 300 mA top-up mode to compromise various requirements of users at this moment. Higher current is possible in future. To support the top-up operation, various diagnostics and timing control are needed. These include diagnostics for injection efficiency, filling pattern of the storage ring, tune, instability, loss pattern measurement. Timing control of the injection process is also necessary. Further possible improvement will be also discussed.
引用
收藏
页码:247 / 249
页数:3
相关论文
共 50 条
  • [1] Full Energy Injection and Top-up Operation at UVSOR-II
    Katoh, Masahiro
    Adachi, Masahiro
    Zen, Heishun
    Yamazaki, Jun-ichiro
    Hayashi, Kenji
    Mochihashi, Akira
    Shimada, Miho
    Hosaka, Masahito
    [J]. SRI 2009: THE 10TH INTERNATIONAL CONFERENCE ON SYNCHROTRON RADIATION INSTRUMENTATION, 2010, 1234 : 531 - 534
  • [2] Tracking studies of top-up injection for a safe operation of the ESRF-EBS
    Liuzzo, S. M.
    Berkvens, P.
    Carmignani, N.
    Chavanne, J.
    Farvacque, L.
    Versteegen, R.
    [J]. NUCLEAR INSTRUMENTS & METHODS IN PHYSICS RESEARCH SECTION A-ACCELERATORS SPECTROMETERS DETECTORS AND ASSOCIATED EQUIPMENT, 2021, 991
  • [3] Radiation safety impact for top-up operation at the NSRRC
    Sheu, RJ
    Wang, JP
    Liu, J
    Chen, CR
    Chang, FD
    Jiang, SH
    [J]. RADIATION PROTECTION DOSIMETRY, 2005, 116 (1-4) : 239 - 244
  • [4] Top-up fees - Not allowing top-up fees is unethical
    Lees, Christoph C.
    [J]. BMJ-BRITISH MEDICAL JOURNAL, 2008, 336 (7655): : 1205 - 1205
  • [5] Top-up fees - Top-up fairly according to means
    Lake, Alfred P. J.
    [J]. BMJ-BRITISH MEDICAL JOURNAL, 2008, 336 (7655): : 1205 - 1205
  • [6] Preparing the BESSY APPLE undulators for top-up operation
    Bahrdt, J.
    Frentrup, W.
    Gaupp, A.
    Scheer, M.
    [J]. SYNCHROTRON RADIATION INSTRUMENTATION, PTS 1 AND 2, 2007, 879 : 315 - +
  • [7] Stable top-up operation at SPring-8
    Tanaka, Hitoshi
    Adachi, Masatoshi
    Aoki, Tsuyoshi
    Asaka, Takao
    Baron, Alfred
    Date, Shin
    Fukami, Kenji
    Furukawa, Yukito
    Hanaki, Hirofumi
    Hosoda, Naoyasu
    Ishikawa, Tetsuya
    Kimura, Hiroaki
    Kobayashi, Kazuo
    Kobayashi, Toshiaki
    Kohara, Shinji
    Kumagai, Noritaka
    Masaki, Mitsuhiro
    Masuda, Takemasa
    Matsui, Sakuo
    Mizuno, Akihiko
    Nakamura, Takeshi
    Nakatani, Takeshi
    Noda, Takashi
    Ohata, Toru
    Ohkuma, Haruo
    Ohshima, Takashi
    Oishi, Masaya
    Sasaki, Sigeki
    Schimizu, Jun
    Shoji, Masazumi
    Soutome, Kouichi
    Suzuki, Motohiro
    Suzuki, Shinsuke
    Suzuki, Yoshio
    Takano, Shirou
    Takao, Masaru
    Takashima, Takeo
    Takebe, Hideki
    Takeuchi, Akihisa
    Tamura, Kazuhiro
    Tanaka, Ryotaro
    Tanaka, Yoshihito
    Taniuchi, Tsutomu
    Taniuchi, Yukiko
    Tsumaki, Kouji
    Yamashita, Akihiro
    Yanagida, Kenichi
    Yoda, Yoshitaka
    Yonehara, Hiroto
    Yorita, Tetsuhiko
    [J]. JOURNAL OF SYNCHROTRON RADIATION, 2006, 13 : 378 - 391
  • [8] Overview of top-up injection at Taiwan light source
    Luo, G. H.
    Chang, H. P.
    Chang, J. C.
    Chen, C. T.
    Chen, Jenny
    Chen, J. R.
    Fann, C. S.
    Hsu, K. T.
    Hwang, C. S.
    Kuo, C. C.
    Liu, K. B.
    Liu, Y. C.
    Sheu, R. J.
    Ueng, T. S.
    Wang, D. J.
    Wang, M. H.
    [J]. SYNCHROTRON RADIATION INSTRUMENTATION, PTS 1 AND 2, 2007, 879 : 13 - +
  • [9] Performance of the TLS vacuum systems operated at 300 mA of top-up mode
    Hsiung, G. Y.
    Chan, C. K.
    Hsueh, H. P.
    Yang, T. L.
    Chang, C. C.
    Hsu, S. N.
    Yang, C. Y.
    Chen, C. L.
    Chen, J. R.
    [J]. SYNCHROTRON RADIATION INSTRUMENTATION, PTS 1 AND 2, 2007, 879 : 67 - +
  • [10] Safety upgrades for NSRRC beamlines in the upcoming top-up operation
    Liu, Joseph C.
    Sheu, Rong-Jiun
    Wang, Jau-Ping
    Chen, Chien-Rong
    Chang, Fu-Dong
    Kao, Sheau-Ping
    [J]. RADIATION MEASUREMENTS, 2006, 41 : S242 - S246