Minimal utilization rate for railway maintenance windows: a cost-benefit approach

被引:2
|
作者
Ait-Ali, Abderrahman [1 ,2 ]
Liden, Tomas [1 ,2 ]
机构
[1] Swedish Natl Rd & Transport Res Inst VTI, Malvinas Vag 6, S-11428 Stockholm, Sweden
[2] Linkoping Univ, Dept Sci & Technol, Norrkoping, Sweden
来源
EUROPEAN JOURNAL OF TRANSPORT AND INFRASTRUCTURE RESEARCH | 2022年 / 22卷 / 02期
关键词
maintenance windows; rail infrastructure; cost-benefit analysis; RENEWAL COSTS; INFRASTRUCTURE;
D O I
10.18757/ejtir.2022.22.2.6130
中图分类号
U [交通运输];
学科分类号
08 ; 0823 ;
摘要
Methods for economic assessment are often used in the rail sector to evaluate large infrastructure investments such as new high-speed lines. With larger networks and ageing infrastructure, these methods can also be used for planning maintenance. In this paper, we focus on the newly introduced concept of maintenance windows in Sweden. These are pre-allocated slots in the train timetable dedicated to performing, among others, periodic/frequent maintenance activities. To justify the pre-allocation of such windows, this study presents a method to find minimal utilization rates depending on window designs and traffic situations. Using a cost-benefit approach, the windows are assessed using a total social cost including work costs, loss in traffic production and reliability gains in future traffic. Based on a case study from the Southern main line in Sweden, we study the minimal utilization rate in different test scenarios, i.e., night or day shifts, asset degradation functions and designs of maintenance windows. The results show that lower utilization rates (4-42%) can be accepted during low-volume traffic or for partial closures, while higher utilization rates (47-83%) are required for full closures during high-volume traffic. Whether the rates are measured as the share of used window time or the share of utilized windows is less important, especially when higher utilization is required. Sensitivity analyses of asset knowledge indicate that parameters such as asset degradation function and minimum asset quality (and to a lesser extent traffic volume, discount rate and failure likelihood) can have a substantial effect on the minimum required utilization rates.
引用
收藏
页码:108 / 131
页数:24
相关论文
共 50 条
  • [21] Built-for-future railway project: cost-benefit analysis
    Lu, Gang
    Rail International, 1995, (12): : 6 - 13
  • [22] UTILIZATION OF COST-BENEFIT ANALYSIS IN PLANNING PREVENTION PROGRAMS
    SENCER, DJ
    AXNICK, NW
    ACTA MEDICA SCANDINAVICA, 1975, : 123 - 128
  • [23] Cost-Benefit Approach to Degradation of Electrolytic Capacitors
    Kirisken, Barbaros
    Ugurdag, H. Fatih
    2014 60TH ANNUAL RELIABILITY AND MAINTAINABILITY SYMPOSIUM (RAMS), 2014,
  • [24] LAN DEVELOPMENT - A COST-BENEFIT ANALYSIS APPROACH
    DOORLAY, R
    LIBRARY SOFTWARE REVIEW, 1989, 8 (05): : 279 - 280
  • [25] A new approach in GIS cost-benefit analysis
    Azpiazu, L
    Roldos, JA
    CONFERENCE XXI - AM/FM INTERNATIONAL, PROCEEDINGS, 1998, : 571 - 575
  • [26] SCOLIOSIS SCREENING - AN APPROACH TO COST-BENEFIT ANALYSIS
    ASHWORTH, MA
    HANCOCK, JA
    ASHWORTH, L
    TESSIER, KA
    SPINE, 1988, 13 (10) : 1187 - 1188
  • [27] COST-BENEFIT APPROACH TO MARKET-SEGMENTATION
    WINTER, FW
    JOURNAL OF MARKETING, 1979, 43 (04) : 103 - 111
  • [28] A Cost-Benefit Approach for Prioritizing Invasive Species
    Courtois, Pierre
    Figuieres, Charles
    Mulier, Chloe
    Weill, Joakim
    ECOLOGICAL ECONOMICS, 2018, 146 : 607 - 620
  • [29] SUGGESTED BEHAVIORAL APPROACH TO COST-BENEFIT ANALYSIS
    SPIER, L
    MANAGEMENT SCIENCE SERIES B-APPLICATION, 1971, 17 (10): : B672 - B693
  • [30] Ethical equitation: Applying a cost-benefit approach
    Jones, Bidda
    McGreevy, Paul D.
    JOURNAL OF VETERINARY BEHAVIOR-CLINICAL APPLICATIONS AND RESEARCH, 2010, 5 (04) : 196 - 202