Challenges and countermeasures for using pile-beam-arch approach to enlarge large-diameter shield tunnel to subway station

被引:19
|
作者
Xu, Xuezhao [1 ]
Li, Zhaoping [1 ]
Fang, Qian [1 ]
Zheng, Hao [2 ]
机构
[1] Beijing Jiaotong Univ, Sch Civil Engn, Beijing 100044, Peoples R China
[2] Beijing Municipal Engn Grp Co Ltd, Beijing 100045, Peoples R China
基金
中国国家自然科学基金;
关键词
Large diameter shield tunnel; Pile-beam-arch method; Subway station; Ground surface settlement; METRO STATION; PERFORMANCE; SETTLEMENT;
D O I
10.1016/j.tust.2020.103326
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The Jiangtai station (on Line 14 of the Beijing Subway) is the first station in China constructed by using the pilebeam-arch (PBA) method to enlarge a large-diameter shield tunnel. This study illustrates the construction method, layout, geological and hydrological conditions, and construction processes of the station. The challenges in station construction are analysed, and targeted countermeasures are presented. The field test results showed that in the test section, the asymmetrical removal of B-segments caused the middle wall to bear large eccentric loads. In the standard section, and after construction optimisation, the eccentric loads acting on the middle wall were effectively controlled. In addition, the ground surface settlements of the station were systematically monitored during construction. The monitoring results showed that the maximum ground surface settlement values of different monitoring sections were between 46.1 and 56.8 mm. The ground surface settlements were mainly caused by the shield tunnelling, side pilot tunnel construction, and middle pilot tunnel construction, accounting for approximately 11.2-14.1%, 45.4-48.1%, 30.1-32.5% of the total settlement, respectively. This investigation is intended to serve as a reference for similar projects.
引用
收藏
页数:9
相关论文
共 28 条
  • [1] Enlarging a large-diameter shield tunnel using the Pile-Beam-Arch method to create a metro station
    Liu, Jun
    Wang, Fang
    He, Shaohui
    Wang, Enzhi
    Zhou, Hong
    [J]. TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2015, 49 : 130 - 143
  • [2] Numerical Analysis of Metro Station Construction by Large-Diameter Shield and Pile-Beam-Arch Method
    Ding, Deyun
    Yang, Xiuren
    Lu, Weidong
    Liu, Weining
    Yan, Mei
    Li, Aimin
    [J]. ADVANCES IN CIVIL ENGINEERING AND ARCHITECTURE INNOVATION, PTS 1-6, 2012, 368-373 : 2711 - +
  • [3] Surface settlement of subway station construction using pile-beam-arch approach
    Yu, Lin
    Zhang, Dingli
    Fang, Qian
    Cao, Liqiang
    Xu, Tong
    Li, Qianqian
    [J]. TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2019, 90 : 340 - 356
  • [4] Research on Surface Settlement of Subway Station Construction Using Pile-Beam-Arch Approach
    Xu, Yushan
    Tang, Bo
    Duan, Yanwei
    [J]. 6TH INTERNATIONAL CONFERENCE ON ENVIRONMENTAL SCIENCE AND CIVIL ENGINEERING, 2020, 455
  • [5] Ground surface settlement response to subway station construction activities using pile-beam-arch method
    Guo, Xiangyu
    Wang, Zhengzheng
    Geng, Ping
    Chen, Changjian
    Zhang, Jing
    [J]. TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2021, 108
  • [6] INFLUENCE ANALYSIS ON THE SUBWAY TUNNEL CAUSED BY LARGE-DIAMETER PILE SETTLEMENT
    Li, Y. S.
    Zhang, Y. L.
    Meng, L. Q.
    [J]. ENVIRONMENTAL VIBRATIONS: PREDICTION, MONITORING, MITIGATION AND EVALUATION, VOLS I AND II, 2009, : 1615 - 1620
  • [7] Analysis of control standard for ground surface settlement in excavating metro station by shield tunnel combined with pile-beam-arch method
    Wang Fang
    He Shao-hui
    Liu Jun
    Cao Rui-lang
    [J]. ROCK AND SOIL MECHANICS, 2012, 33 : 289 - 296
  • [8] STRUCTURE DESIGN OF KEY SEGMENT FOR THE NEW TUNNEL BUILDING TECHNOLOGY ABOUT ENLARGING SUBWAY STATION WITH LARGE-DIAMETER SHIELD TUNNEL
    Peng, Zhiyong
    Liu, Weining
    Ding, Deyun
    Yang, Xiuren
    Yan, Mei
    Lu, Weidong
    [J]. NEW TECHNOLOGIES OF RAILWAY ENGINEERING, 2012, : 850 - +
  • [9] Analysis of control standard for ground surface settlement in excavating metro station by shield tunnel combined with pile-beam-arch method
    Wang, Fang
    He, Shao-Hui
    Liu, Jun
    Cao, Rui-Lang
    [J]. Yantu Lixue/Rock and Soil Mechanics, 2012, 33 (SUPPL. 2): : 289 - 296
  • [10] Characteristics and Countermeasures of Tunnel Heave due to Large-Diameter Shield Tunneling Underneath
    Gan, Xiaolu
    Yu, Jianlin
    Gong, Xiaonan
    Zhu, Min
    [J]. JOURNAL OF PERFORMANCE OF CONSTRUCTED FACILITIES, 2020, 34 (01)