Risk assessment-based long-term transmission system hardening under prior probabilistic information

被引:7
|
作者
Ding, Tao [1 ,2 ]
Li, Cheng [1 ]
Chen, Chen [3 ]
Chen, Bo [3 ]
Yang, Yongheng [4 ]
机构
[1] Xi An Jiao Tong Univ, Elect Engn, Xian 710049, Peoples R China
[2] Tsinghua Univ, Elect Engn, Beijing 100084, Peoples R China
[3] Argonne Natl Lab, Dept Elect Engn, 9700 S Cass Ave, Argonne, IL 60439 USA
[4] Aalborg Univ, Energy Technol, DK-9229 Aalborg, Denmark
基金
中国博士后科学基金; 中国国家自然科学基金;
关键词
power system security; risk analysis; optimisation; power transmission planning; probability; integer programming; risk management; power system reliability; power generation reliability; prior probabilistic information; tri-level optimisation model; two-stage robust optimisation model; nonlinear terms; standard IEEE RTS-96 system; risk assessment-based long-term transmission system hardening; transmission infrastructure; load loss risk; power systems; OPTIMIZATION MODEL; POWER; STRATEGY; ELECTRICITY; RESILIENCE;
D O I
10.1049/iet-gtd.2018.6278
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
In the long-term transmission system hardening, critical components in transmission infrastructure should be identified and hardened to reduce the load loss risk in the presence of scheduled and unscheduled outages. Generally, the probabilistic information of assets in power systems can be evaluated via historical statistics. On the basis of the prior probabilistic information, this study proposed a tri-level optimisation model to deal with the problem of long-term transmission system hardening, in which the risk assessment is taken into account in the objective function. Furthermore, the problem is formulated as a two-stage robust optimisation model. To address the non-linear problem in the inner model, logarithmic transformation and piecewise linearisation are utilised to exactly linearise the non-linear terms in the model. Finally, the standard column-and-constraints generation algorithm is employed to solve the proposed model with a master-sub-problem framework. The test results on a standard IEEE RTS-96 system show the effectiveness of the proposed model.
引用
收藏
页码:108 / 115
页数:8
相关论文
共 50 条
  • [31] An assessment of long-term overtopping risk and optimal termination time of dam under climate change
    Lee, Bau-Shian
    You, Gene Jiing-Yun
    JOURNAL OF ENVIRONMENTAL MANAGEMENT, 2013, 121 : 57 - 71
  • [32] BET_VH: a probabilistic tool for long-term volcanic hazard assessment
    Marzocchi, Warner
    Sandri, Laura
    Selva, Jacopo
    BULLETIN OF VOLCANOLOGY, 2010, 72 (06) : 705 - 716
  • [33] Morsleben nuclear waste repository probabilistic safety assessment of the long-term safety
    Resele, G
    Niemeyer, M
    Jaquet, O
    Wollrath, J
    PROBABILISTIC SAFETY ASSESSMENT AND MANAGEMENT, VOL 1- 6, 2004, : 3116 - 3122
  • [34] BET_VH: a probabilistic tool for long-term volcanic hazard assessment
    Warner Marzocchi
    Laura Sandri
    Jacopo Selva
    Bulletin of Volcanology, 2010, 72 : 705 - 716
  • [35] Probabilistic assessment of the influence of lake properties in long-term radiation doses to humans
    Pohjola, Jari
    Turunen, Jari
    Lipping, Tarmo
    Ikonen, Ari T. K.
    JOURNAL OF ENVIRONMENTAL RADIOACTIVITY, 2016, 164 : 258 - 267
  • [36] The long-term transmission & substation plan in Korea power system
    Oh, Hyeon-jin
    Won, Young-jin
    Hwang, Jong-young
    T& D ASIA: 2009 TRANSMISSION & DISTRIBUTION CONFERENCE & EXPOSITION: ASIA AND PACIFIC, 2009, : 599 - 603
  • [37] Probabilistic corrosion fatigue life assessment of a suspension bridge instrumented with long-term structural health monitoring system
    Ye, X. W.
    Liu, T.
    Ni, Y. Q.
    ADVANCES IN STRUCTURAL ENGINEERING, 2017, 20 (05) : 674 - 681
  • [38] LONG-TERM IMPACT OF THE ENDOCKSCOPE SYSTEM: A GLOBAL ASSESSMENT
    Afyouni, Andrew
    O'Leary, Mitchell
    Okhunov, Zhamshid
    Peta, Akhil
    Brevik, Andrew
    Ayad, Maged
    Yoon, Renai
    Patel, Roshan
    Dolan, Benjamin
    Landman, Jaime
    Clayman, Ralph
    JOURNAL OF UROLOGY, 2021, 206 : E515 - E516
  • [39] Performance assessment of a long-term photochemical modelling system
    Gabusi, V
    Finzi, G
    Pertot, C
    INTERNATIONAL JOURNAL OF ENVIRONMENT AND POLLUTION, 2003, 20 (1-6) : 64 - 74
  • [40] Novel Long-term Information based Language Identification
    Xu, Jiaxin
    Wei, Yan
    Qiu, Feng
    Sun, Bo
    ENGINEERING SOLUTIONS FOR MANUFACTURING PROCESSES, PTS 1-3, 2013, 655-657 : 1805 - 1808