Tunnelling undercrossing existing live MRT tunnels

被引:21
|
作者
Sheng, Esen Sze Yu [1 ]
Chuan, Jim Yee Tung [2 ]
Ikhyung, Henry Kim [3 ]
Osborne, Nick H. [4 ]
Boon, Chang Kin [1 ]
Siew, Richard [2 ]
机构
[1] Land Transport Author, Singapore, Singapore
[2] CDM Smith Inc, Singapore, Singapore
[3] GS Engn & Construct, Singapore, Singapore
[4] Mott Macdonald, Singapore, Singapore
关键词
Tunnelling; Undercrossing; Stakeholders; MRT;
D O I
10.1016/j.tust.2016.02.013
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
In conjunction with the government of Singapore's vision to have efficient and extensive Mass Rapid Transit (MRT) system across Singapore Island, more and more rail tunnels are planned to be constructed in close proximity to sensitive buildings and infrastructures in recent years. This being a particular challenge for major infrastructure works in the urban environment. In contract C937 of Downtown Line Stage 3 (DTL3), twin bored tunnels connect Fort Canning station to Bencoolen Station, under Fort Canning Hill, with the alignment overcrossing the existing North East Line (NEL) rail tunnel, undercrossing North South Line (NSL) and Circle Line (CCL) with clear distance of less than one bored tunnel diameter. This inevitably poses great challenges to tunnelling over and under existing live tunnels without disruption to daily operation of MRT. Further compounding the challenge is the ground condition comprising of Jurong Formation steeply variable sedimentary deposits transitioning into Fort Canning Boulder Bed a colluvial deposit of quartzite boulders in a stiff clay matrix. To successfully negotiate this challenge, requires all involved parties to make contributions in their areas of expertise and work as team together to ensure that the works progress smoothly and as planned. The designer provides an overall approach demonstrating that the work can be safely carried out and provides key parameters for the contractor who carries out the tunnelling with construction control, which in turn is supervised by the supervision engineers ensuring work is carried out safely. The client, who provides the vision in the first place, has overall responsibility for the work providing continuity and ensuring that the component parts of the job are co-ordinated and carried out successfully. In addition, different monitoring levels were also established to reduce the train speed if necessary and also bus bridging service as a contingency measure. This paper summarizes the approach to the tunnelling, key tunnelling parameters during undercrossing of existing live MRT tunnels, instrumentation monitoring as well as measured railway track and structure movements due to proximity tunnelling. It reflects upon the on crucial contributory factors that ensure success within the project and serves as a reference as to how engineering boundaries can be challenged underground. (C) 2016 Elsevier Ltd. All rights reserved.
引用
收藏
页码:241 / 256
页数:16
相关论文
共 50 条
  • [31] Influences of newly-built tunnelling on adjacent existing tunnels in Beijing urban underground roads
    Zhang, Chengping (zcpbjtu@gmail.com), 1600, E-Journal of Geotechnical Engineering (19):
  • [32] Effect of adjacent excavation on MRT tunnels
    Sharma, JS
    Zhao, J
    Chen, CW
    TUNNELS AND UNDERGROUND STRUCTURES, 2000, : 501 - 506
  • [33] Machine Learning-Based Measurement and Prediction of Ground Settlement Induced by Shield Tunneling Undercrossing Existing Tunnels in Composite Strata
    Dong, Mei
    Guan, Mingzhe
    Wang, Kuihua
    Wu, Yeyao
    Fu, Yuhan
    SENSORS, 2025, 25 (05)
  • [34] Use of underpinning, horizontal jet grouting and ground freezing for ground stabilization to control settlement of existing MRT tunnels during construction of a link-way and railway tunnels for a new MRT line in Singapore
    Hashida, Kaoru
    Hashimoto, Tadashi
    Yew, Yong Kwet
    Nair, Ramesh
    Busbridge, John
    GEOTECHNICAL ASPECTS OF UNDERGROUND CONSTRUCTION IN SOFT GROUND, 2021, : 554 - 562
  • [35] Status of tunnels and tunnelling in Japan
    Koyama, Y
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2003, 18 (2-3) : 113 - 114
  • [36] Shield tunnelling of the Chungho Line of Taipei MRT
    Lin, LS
    Chang, JL
    Chu, DCP
    COMPUTER METHODS AND ADVANCES IN GEOMECHANICS, VOL 2, 1997, : 1337 - 1342
  • [37] Influence of short-distance multi-line overlapped shield tunnelling on deformation of existing tunnels
    Li, Lei
    Zhang, Meng-Xi
    Wu, Hui-Ming
    Wang, Yong-Jia
    Yantu Gongcheng Xuebao/Chinese Journal of Geotechnical Engineering, 2014, 36 (06): : 1036 - 1043
  • [38] Research on Shallow Buried and Large-Span Tunnelling Undercrossing a Highway
    Liu, Chunyang
    Li, Jian
    Tan, Zhongsheng
    ADVANCES IN CIVIL ENGINEERING, PTS 1-4, 2011, 90-93 : 1748 - 1756
  • [39] Impact of new undercrossing tunnel excavation on the stability of the existing tunnel
    Zhu, Qingli
    Ding, Yanping
    FRONTIERS IN EARTH SCIENCE, 2022, 10
  • [40] TUNNELS AND TUNNELLING PRACTICE - SHARING BURDEN
    HARRIES, D
    WATER SERVICES, 1976, 80 (969): : 676 - 676