Construction of an undersea shield driven tunnel under high water pressure from a marine launching base

被引:0
|
作者
Funazaki, T [1 ]
Matsumoto, R [1 ]
机构
[1] Trans Tokyo Bay Highway Corp, Tokyo, Japan
关键词
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The Trans-Tokyo Bay Highway is an approximately 15km long automotive highway which has been under construction across Tokyo Bay to connect Kawasaki City in Kanagawa Prefecture on the west side and Kisarazu City in Chiba Prefecture on the east side. The mid-bay section, where the volume of marine traffic is large, is designed as a tunnel structure approximately 10km in length with the Kawasaki Man-Made Island located at its midpoint. This unprecedented project to construct extra-large diameter tunnels by shield driving method under high water pressure involved various difficult problems, the principal ones being measures to avoid the danger of high pressure blowout during shield machine launching, removal of the temporary wall at the launching opening which had a strength of 100N/mm(2) and therefore could not be removed by the conventional method, and high precision connection of the shield driven tunnels within the ground of the bay floor. The connections at all four tunnels were safely completed in May 1997 and the highway was scheduled to be opened to traffic in December 1997. This paper describes the achievements attained in the construction of these tunnels, centered on the Kawasaki Tunnel Kawajin North Contract Section.
引用
收藏
页码:781 / 786
页数:6
相关论文
共 50 条
  • [21] Application of mechanical shield docking method under high ground water pressure
    Kawaguchi, H
    Suzuki, S
    TUNNELS AND METROPOLISES, VOLS 1 AND 2, 1998, : 677 - 683
  • [22] Study on the Applicability of Load Calculation Method for Large-Diameter Shield Tunnel in Argillaceous Sandstone Stratum under High Water Pressure
    Yinjun Tan
    Qianshen Wang
    KSCE Journal of Civil Engineering, 2023, 27 : 5401 - 5416
  • [23] Study on the Applicability of Load Calculation Method for Large-Diameter Shield Tunnel in Argillaceous Sandstone Stratum under High Water Pressure
    Tan, Yinjun
    Wang, Qianshen
    KSCE JOURNAL OF CIVIL ENGINEERING, 2023, 27 (12) : 5401 - 5416
  • [24] Research on the Prediction Model of Water Pressure on Tunnel Lining under High Hydraulic Pressure
    Yuan, Jinxiu
    Liu, Binghua
    Gao, Xinqiang
    Hui, Yunjie
    Huang, Qiyan
    Cao, Yubin
    Wang, Daoyuan
    Journal of Railway Engineering Society, 2021, 38 (07) : 48 - 53
  • [25] Study and Application of Forecasting System for Water Inrush under High Pressure in Xiamen Submarine Tunnel Construction Based on GIS
    Li, Xueping
    Li, Yunan
    Zhou, Shunping
    2011 3RD INTERNATIONAL CONFERENCE ON ENVIRONMENTAL SCIENCE AND INFORMATION APPLICATION TECHNOLOGY ESIAT 2011, VOL 10, PT B, 2011, 10 : 999 - 1005
  • [26] Gushing Water of a Deep Buried Long Tunnel under High Water Pressure and High Ground Stress
    Deng, Yinger
    Yuan, Ting
    Huang, Runqiu
    Hu, Xiaonong
    Peng, Xin
    ADVANCES IN CIVIL AND INDUSTRIAL ENGINEERING, PTS 1-4, 2013, 353-356 : 1211 - +
  • [27] Study on Mechanical Characteristics of Segmental Joints of a Large-Diameter Shield Tunnel under Ultrahigh Water Pressure
    Kou, Lei
    Xiong, Zhihui
    Cui, Hao
    Zhao, Jinjie
    SENSORS, 2021, 21 (24)
  • [28] Prototype test on failure mechanism of shield tunnel with reinforced concrete inner lining under internal water pressure
    Zhang D.
    Bu X.
    Zhou W.
    Jiang Y.
    Jia K.
    Yang G.
    Tumu Gongcheng Xuebao/China Civil Engineering Journal, 2023, 56 (06): : 126 - 135
  • [29] Failure process and tensile stiffness of shield tunnel with reinforced concrete inner lining under internal water pressure
    Bu, Xiang-Hong
    Zhang, Dong-Mei
    Zhou, Wen-Ding
    Jiang, Yan
    Jia, Kai
    Yang, Guang-Hua
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2023, 138
  • [30] Experimental investigation of the dynamic sealing of shield tail grease under high water pressure
    Shen, Xiang
    Yuan, Dajun
    Cao, Liqiang
    Fu, Yanbin
    Jin, Dalong
    Gao, Zhenfeng
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2022, 121