The pre-undercut caving method at the El Teniente mine, Codelco Chile

被引:0
|
作者
Rojas, E [1 ]
Molina, R [1 ]
Bonani, A [1 ]
Constanzo, H [1 ]
机构
[1] Codelco Chile, Rancagua, Chile
来源
MASSMIN 2000, PROCEEDINGS | 2000年 / 2000卷 / 07期
关键词
D O I
暂无
中图分类号
TD [矿业工程];
学科分类号
0819 ;
摘要
With conventional undercutting sequence the infrastructure on the production level often has a short serviceable life before major rehabilitation is necessary and is characterised by high maintenance costs. The abutment stress zone is the main cause of this situation. The application of the pre-undercut caving method variant can increase the availability and utilisation of the production level When a pre-undercut is used development and construction are carried out underneath a previously undercut area, far away from the abutment stress zone, under more favourable stress conditions. This paper describes the design principles and the relevant results from the application of the pre-undercut variant over three years to the Esmeralda sector of El Teniente mine. The aspects described are the undercut-extraction, the undercut-development and construction distances, the geometry and drawbells opening, cave extraction rates, and the rate and height of undercutting.
引用
收藏
页码:261 / 266
页数:6
相关论文
共 44 条