With conventional undercutting sequence the infrastructure on the production level often has a short serviceable life before major rehabilitation is necessary and is characterised by high maintenance costs. The abutment stress zone is the main cause of this situation. The application of the pre-undercut caving method variant can increase the availability and utilisation of the production level When a pre-undercut is used development and construction are carried out underneath a previously undercut area, far away from the abutment stress zone, under more favourable stress conditions. This paper describes the design principles and the relevant results from the application of the pre-undercut variant over three years to the Esmeralda sector of El Teniente mine. The aspects described are the undercut-extraction, the undercut-development and construction distances, the geometry and drawbells opening, cave extraction rates, and the rate and height of undercutting.
机构:
CSIRO, Mineral Resources Flagship, 26 Dick Perry Ave, Kensington, WA 6151, AustraliaCSIRO, Mineral Resources Flagship, 26 Dick Perry Ave, Kensington, WA 6151, Australia