A Study of Control Chart for Monitoring Exponentially Distributed Characteristics Based On Type-II Censored Samples

被引:20
|
作者
Huang, Shuo [1 ,2 ]
Yang, Jun [1 ]
Xie, Min [2 ]
机构
[1] Beihang Univ, Sch Reliabil & Syst Engn, Beijing, Peoples R China
[2] City Univ Hong Kong, Shenzhen Res Inst, Shenzhen, Peoples R China
关键词
type-II censoring; exponential distribution; average time to signal (ATS); ATS-unbiased design; sequential sampling; WEIBULL SHAPE PARAMETER; AVERAGE TIME; DESIGN; SCHEME; PERFORMANCE; CUSUM; INTERVALS; EVENTS; SIGNAL; LIMITS;
D O I
10.1002/qre.2122
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In this paper, control charts for monitoring the exponential type-II censoring samples are investigated. Such data are very common in many practical inspection scenarios in reliability context when items are replaced in groups after a period of time. The average time to signal, which involves both the number and the time of samples inspected until a signal occurs, is a good criterion to evaluate the performance of control charts. We propose an average time to signal-unbiased control chart with known parameter and compare the proposed method with the traditional ones. The results indicate the proposed control chart is more sensitive to system deterioration. Then the effects of parameter estimation on the proposed control charts are evaluated. Because the control limits with estimated parameters result in more false alarms, an adjusted control chart with estimated parameters is proposed and the self-starting control chart based on a sequential sampling scheme is adopted to solve the phase I problem. Finally, two examples are given to illustrate the implementation of the proposed approach. Copyright (c) 2017 John Wiley & Sons, Ltd.
引用
下载
收藏
页码:1513 / 1526
页数:14
相关论文
共 50 条