A large number of process synthesis, design and control problems in chemical engineering can be formulated as a mixed integer nonlinear programming (MINLP) model, involving continuous variables and integer decisions. In this paper, we present an MINLP formulation for production scheduling of multi-product batch plants. The binary (0/1) integer variables of the non-convex MINLP problem make it impossible to use the general purpose algorithms for solution. In order to overcome this difficulty, a semi-heuristic algorithm for production scheduling was developed. Using this approach, the non-convex MINLP problem is first considered as an MILP problem without dividing the orders. Thus, the order that causes prolonged delivery time can be identified. Constraints for this order are then relaxed and MILP problem is re-solved using the new constraints. Having reached the new schedule, the quantitative distribution of the specific order to different units can be determined by solving the LP problem that does not contain integer variables since allocation of the orders to the units and processing order are known. The results obtained with some example problems indicate improvements over previous schedules and therefore, give promise that the suggested strategy might be used in moderately-sized industrial applications.
引用
收藏
页码:335 / 340
页数:6
相关论文
共 50 条
  • [21] HEURISTIC ALGORITHM FOR FLOWSHOP SCHEDULING PROBLEM
    GUPTA, JND
    REVUE FRANCAISE D AUTOMATIQUE INFORMATIQUE RECHERCHE OPERATIONNELLE, 1976, 10 (06): : 63 - 73
  • [22] Heuristic algorithm for scheduling batch and semi-continuous plants with production deadlines. Intermediate storage limitations and equipment changeover costs
    Kudva, G.
    Elkamel, A.
    Pekny, J.F.
    Reklaitis, G.V.
    Computers and Chemical Engineering, 1994, 18 (09): : 859 - 875
  • [23] Scheduling Method for Steelmaking and Continuous Casting Production Based on Heuristic Algorithm and Variable Neighborhood Search Algorithm
    Yu, Shengping
    Tang, Ying
    Chai, Tianyou
    Liu, Qiang
    Liu, Yefeng
    2018 IEEE CONFERENCE ON DECISION AND CONTROL (CDC), 2018, : 7164 - 7169
  • [24] MODELING OF SUPERSCALAR INSTRUCTION SCHEDULING AND ANALYSIS OF A HEURISTIC SCHEDULING ALGORITHM
    CHOU, HC
    CHUNG, CP
    BIT, 1993, 33 (03): : 354 - 371
  • [25] An heuristic algorithm for a multi-product, single machine capacitated production scheduling problem
    Bankston, JB
    Harnett, RM
    COMPUTERS & OPERATIONS RESEARCH, 2000, 27 (01) : 77 - 92
  • [26] Task Scheduling Based on a Hybrid Heuristic Algorithm for Smart Production Line with Fog Computing
    Wang, Juan
    Li, Di
    SENSORS, 2019, 19 (05)
  • [27] A new hybrid heuristic algorithm for the Precedence Constrained Production Scheduling Problem: A mining application
    Jelvez, Enrique
    Morales, Nelson
    Nancel-Penard, Pierre
    Cornillier, Fabien
    OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2020, 94 (94):
  • [29] A Hyper Heuristic Algorithm for Scheduling of Fog Networks
    Kabirzadeh, Sabihe
    Rahbari, Dadmehr
    Nickray, Mohsen
    PROCEEDINGS OF THE 2017 21ST CONFERENCE OF OPEN INNOVATIONS ASSOCIATION (FRUCT), 2017, : 148 - 155
  • [30] Heuristic algorithm for project scheduling with splitting allowed
    Valls, Vicente
    Marti, Rafael
    Lino, Pilar
    Journal of Heuristics, 1996, 2 (01) : 87 - 104