Long-run marginal cost pricing for reactive power in distribution networks

被引:0
|
作者
Li, F. [1 ]
Wang, J. [1 ]
机构
[1] Univ Bath, Dept Elect & Elect Engn, Bath BA2 7AY, Avon, England
关键词
network charging methodologies; distribution network charges; yardstick marginal cost;
D O I
暂无
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
Embedded generators are expected to play an increasingly important role in future energy supply. They could potentially benefit networks from loss reduction and deferred or delayed investment. Equally, they can increase network investment through inappropriate siting, potentially leading to expensive network upgrading and expansion. This cost/benefit of embedded generator is not reflected by any of the existing distribution network charging model. The aim of this paper is to develop a long-run marginal cost pricing (LRMC) model for distribution network that can price both real and reactive power and reflect the long-term cost/benefit to a network from a network user. The developed model is adopted from Investment Cost Related Pricing (ICRP) that is used by the UK's transmission network operator, reflecting the marginal cost to a network from a nodal generation/demand increment. The ICRP model for the UK's transmission networks only prices real power as it is based on DC power flow. In this paper, the paper extended the ICRP charging principle to pricing reactive power. The economic efficiency of the proposed charging model is demonstrated on a subset of a practical distribution system and validated through the comparison with the two charging models: 1) current yardstick distribution charging model; 2) ICRP model based on the DC power flow. This paper results from work undertaken in a project on distribution charging methodologies for Western Power Distribution (WPD). The views in the paper expressed are not those of WPD.
引用
收藏
页码:3198 / 3202
页数:5
相关论文
共 50 条
  • [21] THE FALLACY OF USING LONG-RUN COST FOR PEAK-LOAD PRICING
    VICKREY, W
    QUARTERLY JOURNAL OF ECONOMICS, 1985, 100 (04): : 1331 - 1334
  • [22] Charging for Network Security Based on Long-Run Incremental Cost Pricing
    Heng, Hui Yi
    Li, Furong
    Wang, Xifan
    IEEE TRANSACTIONS ON POWER SYSTEMS, 2009, 24 (04) : 1686 - 1693
  • [23] THE LONG-RUN EFFICIENCY OF IPO PRICING
    COTTER, JF
    JOURNAL OF FINANCE, 1994, 49 (03): : 1064 - 1065
  • [24] Is capacity cost allocation according to long-run marginal costing principles correct?
    Dingley, C
    AFRICON '96 - 1996 IEEE AFRICON : 4TH AFRICON CONFERENCE IN AFRICA, VOLS I & II: ELECTRICAL ENERGY TECHNOLOGY; COMMUNICATION SYSTEMS; HUMAN RESOURCES, 1996, : 988 - 992
  • [26] Long-run Incremental Cost Pricing Based on Nodal Voltage Spare Capacity
    Li, Furong
    Matlotse, E.
    2008 IEEE POWER & ENERGY SOCIETY GENERAL MEETING, VOLS 1-11, 2008, : 4576 - 4580
  • [27] Long-run Incremental Cost Pricing Considering Uncertain Future Load Growth
    Gu, Chenhong
    Li, Furong
    2009 IEEE POWER & ENERGY SOCIETY GENERAL MEETING, VOLS 1-8, 2009, : 5071 - 5075
  • [28] Reliability Pricing Method Based on Improved Long-run Incremental Cost Method
    Li P.
    Xiang T.
    Wang Z.
    Fan X.
    Wang N.
    Wen M.
    Dianli Xitong Zidonghua/Automation of Electric Power Systems, 2023, 47 (05): : 114 - 122
  • [29] Pricing for Integrated Flectricity and Gas Systems Based on Long-run Incremental Cost
    Yan, Xiaohe
    Yang, Xinhe
    Wang, Hantao
    Gu, Chenhong
    Li, Furong
    2017 IEEE POWER & ENERGY SOCIETY GENERAL MEETING, 2017,
  • [30] Enhanced Long-Run Incremental Cost Pricing Considering the Impact of Network Contingencies
    Gu, Chenghong
    Li, Furong
    He, Yongxiu
    IEEE TRANSACTIONS ON POWER SYSTEMS, 2012, 27 (01) : 344 - 352