Method Combining Probability Integration Model and a Small Baseline Subset for Time Series Monitoring of Mining Subsidence

被引:45
|
作者
Fan, Hongdong [1 ]
Lu, Lu [2 ]
Yao, Yahui [3 ]
机构
[1] China Univ Min & Technol, Key Lab Land Environm & Disaster Monitoring NASG, Xuzhou 221116, Jiangsu, Peoples R China
[2] China Univ Min & Technol, Sch Environm Sci & Spatial Informat, Xuzhou 221116, Jiangsu, Peoples R China
[3] CGS, Ctr Hydrogeol & Environm Geol Survey, Baoding 071051, Peoples R China
关键词
probability integration model; SBAS; mining subsidence; deformation monitoring; PERMANENT SCATTERERS; DINSAR TECHNIQUE; D-INSAR; DEFORMATION; ALGORITHM;
D O I
10.3390/rs10091444
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Time Series Interferometric Synthetic Aperture Radar (TS-InSAR) has high accuracy for monitoring slow surface subsidence. However, in the case of a large-scale mining subsidence areas, the monitoring capabilities of TS-InSAR are poor, owing to temporal and spatial decorrelation. To monitor mining subsidence effectively, a method known as Probability Integration Model Small Baseline Set (PIM-SBAS) was applied. In this method, mining subsidence with a large deformation gradient was simulated by a PIM. After simulated deformation was transformed into a wrapped phase, the residual wrapped phase was obtained by subtracting the simulated wrapped phase from the actual wrapped phase. SBAS was used to calculate the residual subsidence. Finally, the mining subsidence was determined by adding the simulated deformation to the residual subsidence. The time series subsidence of the Nantun mining area was derived from 10 TerraSAR-X (TSX) images for the period 25 December 2011 to 2 April 2012. The Zouji highway above the 9308 workface was the target for study. The calculated maximum mining subsidence was 860 mm. The maximum subsidence for the Zouji highway was about 145 mm. Compared with the SBAS method, PIM-SBAS alleviates the difficulty of phase unwrapping, and may be used to monitor large-scale mining subsidence.
引用
收藏
页数:18
相关论文
共 50 条
  • [31] Integrating the probability integral method for subsidence prediction and differential synthetic aperture radar interferometry for monitoring mining subsidence in Fengfeng, China
    Diao, Xinpeng
    Wu, Kan
    Zhou, Dawei
    Li, Liang
    JOURNAL OF APPLIED REMOTE SENSING, 2016, 10
  • [32] Integration of D-InSAR technology and PSO-SVR algorithm for time series monitoring and dynamic prediction of coal mining subsidence
    Chen, B. Q.
    Deng, K. Z.
    SURVEY REVIEW, 2014, 46 (339) : 392 - 400
  • [33] Mining Subsidence Monitoring With Modified Time-Series SAR Interferometry Method Based on the Multi-Level Processing Strategy
    He, Qian
    Zhang, Yonghong
    Wu, Hongan
    Luo, Yong
    IEEE ACCESS, 2021, 9 : 106039 - 106048
  • [34] Time-series unmanned aerial vehicle photogrammetry monitoring method without ground control points to measure mining subsidence
    Lian, Xugang
    Liu, Xiaoyu
    Ge, Linlin
    Hu, Haifeng
    Du, Zheyuan
    Wu, Yanru
    JOURNAL OF APPLIED REMOTE SENSING, 2021, 15 (02)
  • [35] A Novel Analytical Model of Mining Subsidence Considering Time Effect Based on the Probability Integral Theory
    Li, Peng
    Li, Yingchun
    Li, Qiang
    Cao, Zhiguo
    Wang, Lujun
    SUSTAINABILITY, 2022, 14 (21)
  • [36] Monitoring land subsidence and fault deformation using the small baseline subset InSAR technique: A case study in the Datong Basin, China
    Yang Cheng-sheng
    Zhang Qin
    Zhao Chao-ying
    Wang Qing-liang
    Ji Ling-yun
    JOURNAL OF GEODYNAMICS, 2014, 75 : 34 - 40
  • [37] Research on 3D Laser Scanning Monitoring Method for Mining Subsidence Based on the Auxiliary for Probability Integral Method
    Lei Wang
    Zhu Shangjun
    Jiang Chuang
    Li Jingyu
    Jiang Kegui
    Teng Chaoqun
    Wei Tao
    Guo Qing-biao
    KSCE Journal of Civil Engineering, 2021, 25 : 4403 - 4416
  • [38] Research on 3D Laser Scanning Monitoring Method for Mining Subsidence Based on the Auxiliary for Probability Integral Method
    Lei Wang
    Zhu Shangjun
    Jiang Chuang
    Li Jingyu
    Jiang Kegui
    Teng Chaoqun
    Wei Tao
    Guo Qing-biao
    KSCE JOURNAL OF CIVIL ENGINEERING, 2021, 25 (11) : 4403 - 4416
  • [39] Land subsidence monitoring and analysis in Qingdao, China using time series InSAR combining PS and DS
    Tao, Qiuxiang
    Li, Xuepeng
    Gao, Tengfei
    Chen, Yang
    Liu, Ruixiang
    Xiao, Yixin
    GEOMATICS NATURAL HAZARDS & RISK, 2025, 16 (01)
  • [40] A Baseline Time Series Data Mining Model for Forecasts in Port Logistics and Economics
    Halabi Echeverry, Ana Ximena
    Richards, Deborah
    Bilgin, Ayse
    2013 13TH INTERNATIONAL CONFERENCE ON INTELLIGENT SYSTEMS DESIGN AND APPLICATIONS (ISDA), 2013, : 313 - 318