Cost-combined life cycle assessment of ferronickel production

被引:26
|
作者
Ma, Xiaotian [1 ]
Yang, Donglu [1 ]
Zhai, Yijie [1 ]
Shen, Xiaoxu [1 ]
Zhang, Ruirui [1 ]
Hong, Jinglan [1 ]
机构
[1] Shandong Univ, Sch Environm Sci & Engn, Shandong Prov Key Lab Water Pollut Control & Reso, Qingdao 266237, Peoples R China
来源
基金
中国国家自然科学基金;
关键词
Electricity; Ferronickel; Lateritic ores; Life cycle costing; Life cycle impact assessment; GREENHOUSE-GAS EMISSIONS; NICKELIFEROUS LATERITE; ELECTRICITY-GENERATION; ENVIRONMENTAL IMPACTS; NATURAL-GAS; NICKEL; ENERGY; WASTE; REDUCTION; LEVEL;
D O I
10.1007/s11367-019-01600-2
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Purpose Ferronickel is irreplaceable in modern infrastructure construction because of its use in stainless steel production. This study explored the cost-combined environmental impacts of ferronickel production in China which is the largest producer and consumer of ferronickel in the world. Methods Life cycle impact assessment was combined with life cycle costing analysis to assess the environmental and economic performance of ferronickel production in China. Both internal cost (e.g., raw materials, energy, transport, infrastructure, tax, and labor) and external cost (i.e., human health, ecosystem quality, and environmental emission) were considered. Results and discussion The environmental burden of ferronickel production in this study was mainly attributed to the damage on resources and human health as endpoints caused by indirect processes, such as electricity supply, transportation, coke production, lateritic nickel ore acquisition, and coal mining. Carbon dioxide, mercury, particulates, methane, sulfur dioxide, nitrogen oxides, coal, and nickel ores were the substances pivotal for optimizing environmental performance. The total economic cost was 2734.8 $/t, of which 2333.3 $/t was internal cost and 401.5 $/t was external cost. Lateritic nickel ore, electricity, human health cost, and transport contributed 44.9%, 20.6%, 14.2%, and 4.8% to the total economic cost, respectively. The remaining economic burden was mainly divided to coke, coal, argon, labor, equipment, and tax. Conclusions Awin-win case for the environment and economy can be achieved by optimizing electricity and lateritic nickel ore quality, including its transport. Application of other power types (e.g., hydro, wind, and solar electricity) as a substitute for thermal power can also reduce environmental impacts considerably. Sites with high steel yield, low thermal power ratio, and high port proximity, such as Fujian Province, are the primary choices for ferronickel production. Finally, although the economic benefits of coke and coal are minimal, their efficiency in environmental improvement is crucial.
引用
收藏
页码:1840 / 1850
页数:11
相关论文
共 50 条
  • [31] Challenges within Life Cycle Cost (LCC) studies and Life Cycle Assessment (LCA)
    Linneberg, P.
    Solgaard, A. O. S.
    Eriksen, K.
    Jensen, J. S.
    BRIDGE MAINTENANCE, SAFETY, MANAGEMENT AND LIFE EXTENSION, 2014, : 1048 - 1055
  • [32] Life cycle assessment and life cycle cost analysis for airfield pavement: a review article
    Orabi, Joumana
    Shatila, Walid
    INNOVATIVE INFRASTRUCTURE SOLUTIONS, 2024, 9 (06)
  • [33] Review of methodology for life cycle assessment and life cycle cost analysis of asphalt pavements
    Suwarto, Fardzanela
    Parry, Tony
    Airey, Gordon
    ROAD MATERIALS AND PAVEMENT DESIGN, 2024, 25 (08) : 1631 - 1657
  • [34] Life cycle assessment and life cycle cost implication of residential buildings-A review
    Islam, Hamidul
    Jollands, Margaret
    Setunge, Sujeeva
    RENEWABLE & SUSTAINABLE ENERGY REVIEWS, 2015, 42 : 129 - 140
  • [35] ENVIRONMENTAL LIFE CYCLE ASSESSMENT AND COST ANALYSIS OF AGGREGATE PRODUCTION INDUSTRIES COMPARED WITH HYBRID SCENARIO
    Ghanbari, M.
    Abbasi, Monir A.
    Ravanshadnia, M.
    APPLIED ECOLOGY AND ENVIRONMENTAL RESEARCH, 2017, 15 (03): : 1577 - 1593
  • [36] Life cycle assessment of copper and nickel production
    Norgate, TE
    Rankin, WJ
    MINPREX 2000: INTERNATIONAL CONGRESS ON MINERAL PROCESSING AND EXTRACTIVE METALLURGY, 2000, 2000 (05): : 133 - 138
  • [37] Life cycle assessment of wafer biscuit production
    Ismayana, A.
    Ibrahim, O. A.
    Yani, M.
    INTERNATIONAL CONFERENCE ON INNOVATION IN TECHNOLOGY AND MANAGEMENT FOR SUSTAINABLE AGROINDUSTRY (ITAMSA 2019), 2020, 472
  • [38] Life cycle assessment of pasta production in Italy
    Bevilacqua, Maurizio
    Braglia, Marcello
    Carmignani, Gionata
    Zammori, Francesco Aldo
    JOURNAL OF FOOD QUALITY, 2007, 30 (06) : 932 - 952
  • [39] Life cycle assessment of bacterial cellulose production
    Forte, Ana
    Dourado, Fernando
    Mota, Andre
    Neto, Belmira
    Gama, Miguel
    Ferreira, Eugenio Campos
    INTERNATIONAL JOURNAL OF LIFE CYCLE ASSESSMENT, 2021, 26 (05): : 864 - 878
  • [40] Life cycle assessment of gold production in China
    Chen, Wei
    Geng, Yong
    Hong, Jinglan
    Dong, Huijuan
    Cui, Xiaowei
    Sun, Mingxing
    Zhang, Qiang
    JOURNAL OF CLEANER PRODUCTION, 2018, 179 : 143 - 150