Cost-combined life cycle assessment of ferronickel production

被引:26
|
作者
Ma, Xiaotian [1 ]
Yang, Donglu [1 ]
Zhai, Yijie [1 ]
Shen, Xiaoxu [1 ]
Zhang, Ruirui [1 ]
Hong, Jinglan [1 ]
机构
[1] Shandong Univ, Sch Environm Sci & Engn, Shandong Prov Key Lab Water Pollut Control & Reso, Qingdao 266237, Peoples R China
来源
基金
中国国家自然科学基金;
关键词
Electricity; Ferronickel; Lateritic ores; Life cycle costing; Life cycle impact assessment; GREENHOUSE-GAS EMISSIONS; NICKELIFEROUS LATERITE; ELECTRICITY-GENERATION; ENVIRONMENTAL IMPACTS; NATURAL-GAS; NICKEL; ENERGY; WASTE; REDUCTION; LEVEL;
D O I
10.1007/s11367-019-01600-2
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Purpose Ferronickel is irreplaceable in modern infrastructure construction because of its use in stainless steel production. This study explored the cost-combined environmental impacts of ferronickel production in China which is the largest producer and consumer of ferronickel in the world. Methods Life cycle impact assessment was combined with life cycle costing analysis to assess the environmental and economic performance of ferronickel production in China. Both internal cost (e.g., raw materials, energy, transport, infrastructure, tax, and labor) and external cost (i.e., human health, ecosystem quality, and environmental emission) were considered. Results and discussion The environmental burden of ferronickel production in this study was mainly attributed to the damage on resources and human health as endpoints caused by indirect processes, such as electricity supply, transportation, coke production, lateritic nickel ore acquisition, and coal mining. Carbon dioxide, mercury, particulates, methane, sulfur dioxide, nitrogen oxides, coal, and nickel ores were the substances pivotal for optimizing environmental performance. The total economic cost was 2734.8 $/t, of which 2333.3 $/t was internal cost and 401.5 $/t was external cost. Lateritic nickel ore, electricity, human health cost, and transport contributed 44.9%, 20.6%, 14.2%, and 4.8% to the total economic cost, respectively. The remaining economic burden was mainly divided to coke, coal, argon, labor, equipment, and tax. Conclusions Awin-win case for the environment and economy can be achieved by optimizing electricity and lateritic nickel ore quality, including its transport. Application of other power types (e.g., hydro, wind, and solar electricity) as a substitute for thermal power can also reduce environmental impacts considerably. Sites with high steel yield, low thermal power ratio, and high port proximity, such as Fujian Province, are the primary choices for ferronickel production. Finally, although the economic benefits of coke and coal are minimal, their efficiency in environmental improvement is crucial.
引用
收藏
页码:1840 / 1850
页数:11
相关论文
共 50 条
  • [1] Cost-combined life cycle assessment of ferronickel production
    Xiaotian Ma
    Donglu Yang
    Yijie Zhai
    Xiaoxu Shen
    Ruirui Zhang
    Jinglan Hong
    The International Journal of Life Cycle Assessment, 2019, 24 : 1840 - 1850
  • [2] Life cycle assessment of ferronickel production in Greece
    Bartzas, Georgios
    Komnitsas, Kostas
    RESOURCES CONSERVATION AND RECYCLING, 2015, 105 : 113 - 122
  • [3] Life cycle assessment and life cycle cost analysis of Jatropha biodiesel production in China
    Liu, Yanbing
    Zhu, Zongyuan
    Zhang, Rui
    Zhao, Xubo
    BIOMASS CONVERSION AND BIOREFINERY, 2022, 14 (22) : 28635 - 28660
  • [4] Life Cycle Assessment and Life Cycle Cost Analysis of Magnesia Spinel Brick Production
    Ozkan, Aysun
    Gunkaya, Zerrin
    Tok, Gulden
    Karacasulu, Levent
    Metesoy, Melike
    Banar, Mufide
    Kara, Alpagut
    SUSTAINABILITY, 2016, 8 (07):
  • [5] Assessing the impact of climate change and water scarcity of ferronickel production in Indonesia: A life cycle assessment approach
    Wahyono, Yoyon
    Sasongko, Nugroho Adi
    Trench, Allan
    Anda, Martin
    Hadiyanto, Hadiyanto
    Aisyah, Nyayu
    Ariyanti, Dita
    SUSTAINABLE ENERGY TECHNOLOGIES AND ASSESSMENTS, 2024, 67
  • [6] Life cycle assessment and life cycle cost analysis of compound microbial fertilizer production in China
    Zhou, Yan
    Xiao, Chunqiao
    Yang, Sheng
    Yin, Huaqun
    Yang, Zhaoyue
    Chi, Ruan
    SUSTAINABLE PRODUCTION AND CONSUMPTION, 2021, 28 : 1622 - 1634
  • [7] Life cycle assessment and life cycle cost of tofu production and its extended recycling scenario
    Hartini, S.
    Fatliana, A. N.
    Handayani, N. U.
    Wicaksono, P. A.
    Ramadan, B. S.
    Matsumoto, T.
    GLOBAL JOURNAL OF ENVIRONMENTAL SCIENCE AND MANAGEMENT-GJESM, 2024, 10 (02): : 487 - 502
  • [8] Life Cycle Assessment of Electricity Production from Natural Gas Combined Cycle
    Banar, Mufide
    Cokaygil, Zerrin
    PRES 2010: 13TH INTERNATIONAL CONFERENCE ON PROCESS INTEGRATION, MODELLING AND OPTIMISATION FOR ENERGY SAVING AND POLLUTION REDUCTION, 2010, 21 : 157 - 162
  • [9] Environmental life cycle assessment of combined process for biodiesel and hydrogen production
    Faleh, Nahla
    Ben Hnich, Khaoula
    Khila, Zouhour
    Hajjaji, Noureddine
    JOURNAL OF MATERIAL CYCLES AND WASTE MANAGEMENT, 2025,
  • [10] Cost combined life cycle assessment of lignite-based electricity generation
    Zhao, Jian
    Hong, Jinglan
    Song, Zhanlong
    Wang, Qingsong
    Zhao, Xiqiang
    Ma, Chunyuan
    FUEL, 2015, 159 : 666 - 674