共 50 条
- [31] Project life cycle benefits realized through dynamic process simulation [J]. 84TH ANNUAL MEETING, TECHNICAL SECTION, CPPA - PREPRINTS A, 1998, : A89 - A100
- [33] INTEGRATED PROJECT AND PROCESS MANAGEMENT [J]. JOURNAL OF THE CONSTRUCTION DIVISION-ASCE, 1982, 108 (03): : 361 - 374
- [34] Integrated life-cycle costs analysis and life-cycle assessment model for decision making of construction project [J]. 2009 IEEE 16TH INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS 1 AND 2, PROCEEDINGS, 2009, : 448 - +
- [37] An integrated simulation and verification environment in support of the system life cycle [J]. 2nd International Industrial Simulation Conference 2004, 2004, : 392 - 396
- [39] Product life cycle information and process analysis methodology: Integrated information and process analysis for product life cycle management [J]. CONCURRENT ENGINEERING-RESEARCH AND APPLICATIONS, 2012, 20 (04): : 257 - 274
- [40] Proactive Project Management as a Discrete Event System [J]. 2020 IEEE EUROPEAN TECHNOLOGY AND ENGINEERING MANAGEMENT SUMMIT (E-TEMS 2020), 2020,