An integrated model for planning development projects using ACO and construction simulation

被引:7
|
作者
Lee, Hsin-Yun [1 ]
机构
[1] Natl Ilan Univ, Dept Civil Engn, I Lan City, Taiwan
关键词
residence planning; portfolio management; simulation; ant colony optimisation; ANT COLONY OPTIMIZATION; DECISION-SUPPORT; MANAGEMENT; ALGORITHM; TIME;
D O I
10.1080/10286608.2011.604415
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
In development projects, especially in a residential development project, the level and the number of facilities and the schedule must be carefully planned to ensure long-term operation and financial stability of the project. This paper proposes an integrated model that estimates the performance of a development project through simulation and searches for a near-optimal plan with the maximum net present value (NPV) using ant colony optimisation. A development project of coastal vacation residences is employed as the case study to evaluate the feasibility of the proposed model. The proposed model provides a solution featuring a near-largest NPV. The complicated and time-consuming calculations of the resource flows between activities can be accomplished through simulation, and the near-optimal development level and schedule of the facilities are assumed. With the support of the proposed model, the decision-making process is made substantially easier for the planner.
引用
收藏
页码:285 / 300
页数:16
相关论文
共 50 条
  • [1] A Safety Model for Construction Site Layout Planning Using an ACO Algorithm
    Ning, Xin
    Liu, Wenhan
    [J]. ICCREM 2015: ENVIRONMENT AND THE SUSTAINABLE BUILDING, 2015, : 28 - 32
  • [2] MATERIAL AND FACILITY LAYOUT PLANNING IN CONSTRUCTION PROJECTS USING SIMULATION
    Alanjari, Pejman
    RazaviAlavi, SeyedReza
    AbouRizk, Simaan
    [J]. PROCEEDINGS OF THE 2014 WINTER SIMULATION CONFERENCE (WSC), 2014, : 3388 - 3398
  • [3] A hybrid simulation model for modules installation in modular integrated construction projects
    Abdelmageed, Sherif
    Abdelkhalek, Sherif
    Hussien, Mohamed
    Zayed, Tarek
    [J]. INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2024, 24 (13) : 1407 - 1418
  • [4] Construction projects planning using network model with the fuzzy decision node
    N. Ibadov
    J. Kulejewski
    [J]. International Journal of Environmental Science and Technology, 2019, 16 : 4347 - 4354
  • [5] Construction projects planning using network model with the fuzzy decision node
    Ibadov, N.
    Kulejewski, J.
    [J]. INTERNATIONAL JOURNAL OF ENVIRONMENTAL SCIENCE AND TECHNOLOGY, 2019, 16 (08) : 4347 - 4354
  • [6] Development of BIM-integrated construction robot task planning and simulation system
    Kim, Sungjin
    Peavy, Matthew
    Huang, Pei-Chi
    Kim, Kyungki
    [J]. AUTOMATION IN CONSTRUCTION, 2021, 127
  • [7] An Integrated Risk Management Model for Construction Projects
    Zhao, Zhen-Yu
    Duan, Lin-Ling
    [J]. 2008 PORTLAND INTERNATIONAL CONFERENCE ON MANAGEMENT OF ENGINEERING & TECHNOLOGY, VOLS 1-5, 2008, : 1389 - 1394
  • [8] Developing an integrated model for planning the delivery of construction materials to post-disaster reconstruction projects
    Gharib, Zahra
    Yazdani, Maziar
    Bozorgi-Amiri, Ali
    Tavakkoli-Moghaddam, Reza
    Taghipourian, Mohammad Javad
    [J]. JOURNAL OF COMPUTATIONAL DESIGN AND ENGINEERING, 2022, 9 (03) : 1135 - 1156
  • [9] Understanding laborers' behavioral diversities in multinational construction projects using integrated simulation approach
    Wu, Chengke
    Chen, Chunjiang
    Jiang, Rui
    Wu, Peng
    Xu, Bo
    Wang, Jun
    [J]. ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2019, 26 (09) : 2120 - 2146
  • [10] Development and application of an integrated optimization-simulation model for major irrigation projects
    Mishra, A
    Singh, R
    Raghuwanshi, NS
    [J]. JOURNAL OF IRRIGATION AND DRAINAGE ENGINEERING, 2005, 131 (06) : 504 - 513