Development and application of an integrated optimization-simulation model for major irrigation projects

被引:11
|
作者
Mishra, A [1 ]
Singh, R
Raghuwanshi, NS
机构
[1] Water Technol Ctr Eastern Reg, Bhubaneswar 751023, Orissa, India
[2] Indian Inst Technol, Dept Agr & Food Engn, Kharagpur 721302, W Bengal, India
关键词
D O I
10.1061/(ASCE)0733-9437(2005)131:6(504)
中图分类号
S2 [农业工程];
学科分类号
0828 ;
摘要
A nonlinear, constrained multivatiable optimization routine is developed for deciding, the optimal canal water release and linked to a canal hydraulic module (MIKE 11) and command hydrological module (MIKE SHE), The optimization routine is solved using the sequential quadratic programming (SQP) technique. The hydraulic and the hydrological modules are calibrated and validated independently, and the results are found to be satisfactory. The integrated optimization-simulation model is applied to the Right Bank Main Canal System of Kangsabati Irrigation Project, West Bengal, India. An improved rotational delivery schedule based on long-term field data analysis is also developed. Three simulation scenarios are considered, These are (1) MIKE 11 and MIKE SHE Simulation, (3) integrated optimization simulation. and (3) integrated optimization-simulation with improved schedule. Simulations were performed for Kharif (rainy) irrigation periods for 3 different years (1995-1997). The intercomparison of the three simulation scenarios showed that the application of the integrated optimization-simulation model reduced the gap between irrigation water supply and crop water demand and improved the spatial distribution of supply, thereby, minimizing the tail-end deprivation.
引用
收藏
页码:504 / 513
页数:10
相关论文
共 50 条
  • [1] Reservoir Optimization-Simulation with a Sediment Evacuation Model to Minimize Irrigation Deficits
    Noor M. Khan
    Mukand S. Babel
    Tawatchai Tingsanchali
    Roberto S. Clemente
    Huynh T. Luong
    [J]. Water Resources Management, 2012, 26 : 3173 - 3193
  • [2] Reservoir Optimization-Simulation with a Sediment Evacuation Model to Minimize Irrigation Deficits
    Khan, Noor M.
    Babel, Mukand S.
    Tingsanchali, Tawatchai
    Clemente, Roberto S.
    Luong, Huynh T.
    [J]. WATER RESOURCES MANAGEMENT, 2012, 26 (11) : 3173 - 3193
  • [3] Development of Reservoir Operation Policies Using Integrated Optimization-Simulation Approach
    Zahraie, B.
    Hosseini, S. M.
    [J]. JOURNAL OF AGRICULTURAL SCIENCE AND TECHNOLOGY, 2010, 12 (04): : 433 - 446
  • [4] An optimization-simulation model for a simple LNG process
    Aspelund, A.
    Gundersen, T.
    Myklebust, J.
    Nowak, M. P.
    Tomasgard, A.
    [J]. COMPUTERS & CHEMICAL ENGINEERING, 2010, 34 (10) : 1606 - 1617
  • [5] TIMBER HARVEST PLANNING - A COMBINED OPTIMIZATION-SIMULATION MODEL
    ARTHUR, JL
    DYKSTRA, DP
    [J]. ENVIRONMENTAL MANAGEMENT, 1980, 4 (06) : 491 - 498
  • [6] COUPLED OPTIMIZATION-SIMULATION WATER-QUALITY MODEL
    BISHOP, AB
    GRENNEY, WJ
    [J]. JOURNAL OF THE ENVIRONMENTAL ENGINEERING DIVISION-ASCE, 1976, 102 (05): : 1071 - 1086
  • [7] System performances analysis of reservoir optimization-simulation model in application of artificial bee colony algorithm
    Hossain, M. S.
    El-Shafie, A.
    Mahzabin, M. S.
    Zawawi, M. H.
    [J]. NEURAL COMPUTING & APPLICATIONS, 2018, 30 (07): : 2101 - 2112
  • [8] Hybrid optimization-simulation for integrated planning of bioenergy and biofuel supply chains
    Akhtari, Shaghaygh
    Sowlati, Taraneh
    [J]. APPLIED ENERGY, 2020, 259
  • [9] AN OPTIMIZATION-SIMULATION MODEL OF A RURAL HEALTH-CENTER IN NIGERIA
    LAMBO, E
    [J]. INTERFACES, 1983, 13 (03) : 29 - 35
  • [10] A joint optimization-simulation model to minimize the makespan on a repairable machine
    el Cadi, Abdessamad Ait
    Benmansour, Rachid
    Serraj, Faiza
    Artiba, Abdelhakim
    [J]. 2015 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND SYSTEMS MANAGEMENT (IESM), 2015, : 489 - 495