FLEXIBLE APPROACH FOR CONSTRUCTION PROCESS MANAGEMENT UNDER RISK AND UNCERTAINTY

被引:5
|
作者
Paslawski, Jerzy [1 ]
机构
[1] Inst Stuct Engn, 5 Piotrowo Str, PL-60965 Poznan, Poland
关键词
flexibility; options; flexibility enablers; risk; uncertainty; FLEXIBILITY; INFRASTRUCTURE; PERFORMANCE; NETWORKS; OPTIONS; DESIGN;
D O I
10.1016/j.proeng.2017.11.028
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This article presents the basic conditions for the application of a flexible approach to the management of construction processes, resulting primarily from high levels of risk and uncertainty. On the one hand, for simple projects whose implementation is not exposed to dynamically changing environments, the use of flexibility is not justified; on the other hand, in the case of complex, innovative projects implemented in a turbulently variable environment, flexibility gives the opportunity to continue processes despite difficulties. Flexibility can be successfully applied at different levels of management and at different phases of the life cycle of a building. Different flexibility options have been presented based on the approach to real options. A procedure for implementing flexibility in building management was proposed. The flexible approach is illustrated by examples of its use. (C) 2017 The Authors. Published by Elsevier Ltd.
引用
收藏
页码:114 / 124
页数:11
相关论文
共 50 条
  • [1] Game Theory Integration in Construction Management: A Comprehensive Approach to Cost, Risk, and Coordination under Uncertainty
    Shehadeh, Ali
    Alshboul, Odey
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2025, 151 (05)
  • [2] Flexible waste management under uncertainty
    Di Corato, Luca
    Montinari, Natalia
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2014, 234 (01) : 174 - 185
  • [3] Flexible project management under uncertainty
    Narimatsu, K
    1998 JAPAN-U.S.A. SYMPOSIUM ON FLEXIBLE AUTOMATION - PROCEEDINGS, VOLS I AND II, 1998, : 907 - 910
  • [4] A flexible risk assessment approach integrating subjective and objective weights under uncertainty
    Wen, Ta-Chun
    Chung, Hsiang-Yu
    Chang, Kuei-Hu
    Li, Zong-Sian
    ENGINEERING APPLICATIONS OF ARTIFICIAL INTELLIGENCE, 2021, 103
  • [5] An Optimization-Based Framework for Process Planning under Uncertainty with Risk Management
    Khor, Cheng Seong
    Giarola, Sara
    Chachuat, Benoit
    Shah, Nilay
    CHEMICAL PRODUCT AND PROCESS MODELING, 2011, 6 (02):
  • [6] NITRATE RISK MANAGEMENT UNDER UNCERTAINTY
    LEE, YW
    DAHAB, MF
    BOGARDI, I
    JOURNAL OF WATER RESOURCES PLANNING AND MANAGEMENT-ASCE, 1992, 118 (02): : 151 - 165
  • [7] A quantitative risk analysis approach to a process sequence under uncertainty - A case study
    Johnson, David B.
    Bogle, I. David L.
    COMPUTERS & CHEMICAL ENGINEERING, 2019, 126 : 1 - 21
  • [8] Horsetail matching: a flexible approach to optimization under uncertainty
    Cook, L. W.
    Jarrett, J. P.
    ENGINEERING OPTIMIZATION, 2018, 50 (04) : 549 - 567
  • [9] Risk management process in construction project
    Liu Renhui
    Tai Shuangliang
    Zhao Qingjie
    Proceedings of 2006 International Conference on Construction & Real Estate Management, Vols 1 and 2: COLLABORATION AND DEVELOPMENT IN CONSTRUCTION AND REAL ESTATE, 2006, : 843 - 846
  • [10] Uncertainty Reduction in Operational Risk Management Process
    Burstein, Guy
    Zuckerman, Inon
    RISKS, 2024, 12 (05)