Failure Probability and Inspection Interval of Pressure Safety Valves: Case Study of a Gas Processing Plant

被引:0
|
作者
Tahmid, Mohammed [1 ]
Islam, Tarikul [1 ]
Rakib, Md. Ahosan Habib [1 ]
Amin, C. M. Touhid [2 ,3 ]
Syeda, Sultana Razia [1 ]
机构
[1] Bangladesh Univ Engn & Technol, Dept Chem Engn, Dhaka 1000, Bangladesh
[2] KrisEnergy Ltd, Dhaka 1212, Bangladesh
[3] Enbridge Gas Distribut, Brockville, ON, Canada
关键词
pressure safety valve; probability of failure; consequence of failure; inspection interval; gas processing facility;
D O I
10.1021/acs.chas.2c00042
中图分类号
R1 [预防医学、卫生学];
学科分类号
1004 ; 120402 ;
摘要
Inspection of pressure safety valves (PSVs) is critical for the safety of process plants which also involves cost. API proposes a Risk-Based Inspection (RBI) method that includes consequences and probability of failure. In this work, PSVs installed in different pressurized equipment of a gas processing plant located in Comilla, Bangladesh, have been studied in order to establish and implement a risk-based inspection planning process in the facility in accordance with API 580 and 581. The probability of failure and consequence of failure have been assessed separately and then combined to determine the risk of failure. The results have been used to assess the acceptability of the current inspection schedule in the facility and present some inspection planning guidelines in order to manage risks. The outcome indicates that a large fraction of the overall risk is concentrated in a relatively limited number of PSVs. These potentially high-risk PSVs should require greater consideration through an amended inspection plan in which more regular inspections are to be scheduled for these devices while inspection intervals may be extended for PSVs identified as having lower risk.
引用
收藏
页码:421 / 433
页数:13
相关论文
共 50 条
  • [41] Mitigation of BTEX emission from gas dehydration unit by application of Drizo process: A case study in Farashband gas processing plant; Iran
    Saidi, Majid
    Parhoudeh, Mahboubeh
    Rahimpour, Mohammad Reza
    JOURNAL OF NATURAL GAS SCIENCE AND ENGINEERING, 2014, 19 : 32 - 45
  • [42] Fuzzy probability on reliability study of nuclear power plant probabilistic safety assessment: A review
    Purba, Julwan Hendry
    PROGRESS IN NUCLEAR ENERGY, 2014, 76 : 73 - 80
  • [43] Application of solid oxide fuel cell for flare gas recovery as a new approach; a case study for Asalouyeh gas processing plant, Iran
    Saidi, M.
    Siavashi, F.
    Rahimpour, M. R.
    JOURNAL OF NATURAL GAS SCIENCE AND ENGINEERING, 2014, 17 : 13 - 25
  • [44] Pressure management for leakage reduction using pressure reducing valves. Case study in an Andean city
    Garcia-Avila, Fernando
    Aviles-Anazco, Alex
    Ordonez-Jara, Juan
    Guanuchi-Quezada, Christian
    Flores del Pino, Lisveth
    Ramos-Fernandez, Lia
    ALEXANDRIA ENGINEERING JOURNAL, 2019, 58 (04) : 1313 - 1326
  • [45] Failure of the Pressure Bulkhead of a Passenger Aircraft - A Case Study
    Salam, I.
    Khan, A. N.
    Farooque, M.
    ADVANCED MATERIALS XII, 2012, 510-511 : 206 - 213
  • [46] MYTH OF GOVERNMENT-SPONSORED REVOLUTION - CASE STUDY OF INSTITUTIONAL SAFETY-VALVES
    SAKOLSKY, R
    EDUCATION AND URBAN SOCIETY, 1973, 5 (03) : 321 - 343
  • [47] Detection probability of forest pests in current inspection protocols - A case study of the bronze birch borer
    Okland, Bjorn
    Haack, Robert A.
    Wilhelmsen, Gunnar
    SCANDINAVIAN JOURNAL OF FOREST RESEARCH, 2012, 27 (03) : 285 - 297
  • [48] Bayesian update of fragility curves for equipment failure probability in seismic probabilistic safety assessment in nuclear power plant
    Jiang, Hong
    Peng, Changhong
    ANNALS OF NUCLEAR ENERGY, 2024, 201
  • [49] Study on the Erosion of Choke Valves in High-Pressure, High-Temperature Gas Wells
    Guo, Ling
    Wang, Yayong
    Xu, Xiaohui
    Gao, Han
    Yang, Hong
    Han, Guoqing
    PROCESSES, 2022, 10 (10)
  • [50] Root cause analysis of failure of bolts in the low pressure section of a gas turbine in an oil and gas production plant
    Mousavinia, M.
    Bahrami, A.
    Rafiaei, S. M.
    Rajabinezhad, M.
    Taghian, M.
    Seyedi, S. J.
    ENGINEERING FAILURE ANALYSIS, 2020, 115