共 50 条
- [45] Multi-product capacitated disassembly lot-sizing problem with lost sales and possibility of defective disassembly components [J]. IFAC PAPERSONLINE, 2022, 55 (10): : 520 - 525
- [50] SCHEDULING POLICIES IN MULTI-PRODUCT MANUFACTURING SYSTEMS WITH SEQUENCE-DEPENDENT SETUP TIMES [J]. PROCEEDINGS OF THE 2011 WINTER SIMULATION CONFERENCE (WSC), 2011, : 2050 - 2061