共 50 条
- [31] A Schedule Risk Assessment Model of Construction Projects Based on Bayesian Network PROCEEDINGS OF THE 2011 INTERNATIONAL CONFERENCE ON ENGINEERING AND RISK MANAGEMENT, 2011, : 106 - 111
- [32] Optimization sequencing for grid construction projects based on evaluation of network coordination Dianli Xitong Baohu yu Kongzhi/Power System Protection and Control, 2010, 38 (17): : 112 - 115
- [33] Application of simulation method in financial evaluation of construction projects Chongqing Jianzhu Daxue Xuebao/Journal of Chongqing Jianzhu University, 2000, 22 (03): : 39 - 45
- [35] An AI-Based Approach to Identify Financial Risks in Transportation Infrastructure Construction Projects ARTIFICIAL INTELLIGENCE APPLICATIONS AND INNOVATIONS, PT II, AIAI 2024, 2024, 712 : 158 - 173
- [36] Modified Bayesian Network-Based Risk Analysis of Construction Projects: Case Study of South Pars Gas Field Development Projects ASCE-ASME JOURNAL OF RISK AND UNCERTAINTY IN ENGINEERING SYSTEMS PART A-CIVIL ENGINEERING, 2018, 4 (04):
- [38] COMPARATIVE FINANCIAL ANALYSIS OF RAILWAY WORKSHOP INTERDISCIPLINARY MANAGEMENT RESEARCH XIV (IMR 2018), 2018, 14 : 796 - 805
- [39] Railway Accident Causation Analysis Based on Complex Network 2013 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND MANAGEMENT SCIENCE (ICIEMS 2013), 2013, : 527 - 532
- [40] Analysis of Informationization Construction of Business Financial Management under the Network Economy ADVANCED RESEARCH ON ELECTRONIC COMMERCE, WEB APPLICATION, AND COMMUNICATION, PT 2, 2011, 144 : 76 - 80