A lean proposal: development of value stream mapping for L'Oreal's artwork process

被引:3
|
作者
Ghosh, Sid [1 ]
Lever, Kaitlin [2 ]
机构
[1] Bournemouth Univ, Sch Business, Poole, Dorset, England
[2] L'Oreal Ltd, London, England
关键词
Automation; VSM; Lean tools; Artwork-process; L'Oreal; SUPPLY CHAIN; DESIGN;
D O I
10.1108/BPMJ-02-2020-0075
中图分类号
F [经济];
学科分类号
02 ;
摘要
Purpose This research develops value stream mapping (VSM) for L'Oreal's artwork process, to eliminate waste, reduce lead time and identify stages that can be automated, which makes the process less prone to human error and more responsive to fulfilling business-to-business customer requirements. In addition, amendments frequently occur slowing down the artwork process. In this context, VSM is applied to L'Oreal's artwork process to reduce lead time, human error and missed deadlines. Design/methodology/approach This study uses data from L'Oreal's artwork tracker from 2018-2019, which is manually tracked by the launch team. The service level agreement and task time data have been collected from 12 employees representing the launch, factory and marketing teams working on the artwork process. Qualitative feedback was also obtained from nine employees to validate the VSM for L'Oreal's artwork process. Findings VSM identified stages that can be streamlined and automated in L'Oreal's artwork process, which makes the process more efficient and responsive to changing scope of the artworks. 50% of the stages have been eliminated from the manual artwork process, resulting in a reduced lead time of 10.5 days and a reduction of 28% spent on the process. This allows the artwork process to be more agile to the requirements of business-to-business customers. The proposed VSM shows a 73% increase in value-added time for a renovation and a 75% increase in value-added time for new product developments. Originality/value VSM has been specifically designed, developed and analyzed for L'Oreal's artwork process, in order to make the process more efficient and responsive to business-to-business customer's requirements.
引用
收藏
页码:1925 / 1947
页数:23
相关论文
共 50 条
  • [41] A RESEARCH AGENDA FOR VALUE STREAM MAPPING THE SALES PROCESS
    Barber, Clifford
    Tietje, Brian
    [J]. JOURNAL OF PERSONAL SELLING & SALES MANAGEMENT, 2008, 28 (02) : 155 - 165
  • [42] Process mining enabling a dynamic value stream mapping
    Ziegler, Steffen
    Braunreuther, Stefan
    Reinhart, Gunther
    [J]. ZWF Zeitschrift fuer Wirtschaftlichen Fabrikbetrieb, 2019, 114 (06): : 327 - 331
  • [43] SIMULATION OF PRODUCTION PROCESS REORGANIZED WITH VALUE STREAM MAPPING
    Gjeldum, Nikola
    Veza, Ivica
    Bilic, Bozenko
    [J]. TEHNICKI VJESNIK-TECHNICAL GAZETTE, 2011, 18 (03): : 341 - 347
  • [44] Lean Implementation Through Value Stream Mapping: A Case Study of A Footwear Manufacturer
    Liu, Qingqi
    Yang, Hualong
    [J]. 2017 29TH CHINESE CONTROL AND DECISION CONFERENCE (CCDC), 2017, : 3390 - 3395
  • [45] Lean manufacturing in agriculture: adapting the value stream mapping approach for farm management
    Carrijo, Pamella Rodrigues Silva
    Rader, Maria Luiza Bortolini
    Batalha, Mario Otavio
    Godinho Filho, Moacir
    [J]. OPERATIONS MANAGEMENT RESEARCH, 2024,
  • [46] Therblig-embedded value stream mapping method for lean energy machining
    Jia, Shun
    Yuan, Qinghe
    Lv, Jingxiang
    Liu, Ying
    Ren, Dawei
    Zhang, Zhongwei
    [J]. ENERGY, 2017, 138 : 1081 - 1098
  • [47] LEAN DISTRIBUTION ASSESSMENT USING AN INTEGRATED FRAMEWORK OF VALUE STREAM MAPPING AND SIMULATION
    Mahfouz, Amr
    Arisha, Amr
    [J]. 2013 WINTER SIMULATION CONFERENCE (WSC), 2013, : 3440 - +
  • [48] Lean manufacturing implementation using value stream mapping at excavator manufacturing company
    Masuti, P. M.
    Dabade, U. A.
    [J]. MATERIALS TODAY-PROCEEDINGS, 2019, 19 : 606 - 610
  • [49] A LEAN APPROACH TO OPTIMIZE BIM INFORMATION FLOW USING VALUE STREAM MAPPING
    Michaud, Martin
    Forgues, Eva-Charlotte
    Carignan, Vincent
    Forgues, Daniel
    Ouellet-Plamondon, Claudiane
    [J]. JOURNAL OF INFORMATION TECHNOLOGY IN CONSTRUCTION, 2019, 24 : 472 - 488
  • [50] Lean production design using value stream mapping and ergonomics approach for waste elimination on buffing panel upright process
    Suryoputro, M. R.
    Sari, A. D.
    Burhanudin, R.
    Sugarindra, M.
    [J]. 10TH INTERNATIONAL SEMINAR ON INDUSTRIAL ENGINEERING AND MANAGEMENT: SUSTAINABLE DEVELOPMENT IN INDUSTRY AND MANAGEMENT, 2017, 277