An integrated approach to in-situ remediation of a former paint manufacturing facility

被引:0
|
作者
Ballesteros, F. C. [1 ]
DeSales, L. F. [1 ]
Pamintuan, G. D. [1 ]
机构
[1] Univ Philippines Diliman, Environm Engn Grad Program, Quezon City, Philippines
来源
关键词
composting bioremediation; SVOC developing country;
D O I
10.2495/WM100311
中图分类号
Q14 [生态学(生物生态学)];
学科分类号
071012 ; 0713 ;
摘要
In the Philippines, there are neither regulations nor standards governing the remediation a contaminated sites Using the United States Environmental Protection Agency (USEPA) Environmental Site Assessment (ESA) Procedure, ESA Phases and 2 were conducted on a contaminated facility suspected of VOCs and TPH Initial testing using auger drilling up to two (2) meters depth showed at least five (5) impacted areas The 2 4-hectare property was then subjected to a 5m x 5m drilling grid in the 5 areas and test pitting The following were found to have contributed to the contamination in the area an underground storage tank which contained, among other compounds, acetone and esters, a drainage system emptying into a series of settling ponds, and another drainage system which was older but apparently was not part of the plant facility Most of the subsurfact contamination was in the clay layers which were of two kinds a lighter brown type which was deposited from the nearby mountains, and a dark, organic matter-bearing clay, which has been deposited by an ancient river in the area Contamination in the clays took the form of a plume which spread out from the storage tank and leakage of TPH from the drainage systems overprinted the plume A layer of coarser sediments (sand- up to gravel-sized) at depths of 4 meters or more marked the deepest parts of the pit, behaviour of contaminant movement was not easy to follow in this stratum due to the high porosity/permeability Tests included visual, olfactory, pH, PID and laboratory tests for VOCs and TPH, a correlation between the last two tests was done to lower cost of laboratory testing, water produced during the excavation was chemically treated using FeCl3 before discharging to a nearby creek Bioremediation using white rot fungus, Phanerochaete chyrsosporium, was done in-situ on VOC-contaminated clays, while TPH-contaminated materials were shipped out for ex-situ treatment
引用
收藏
页码:349 / 355
页数:7
相关论文
共 50 条
  • [41] VERIFICATION APPROACHES FOR IN-SITU REMEDIATION PROJECTS IN THE UK
    Baldock, James
    Hart, Sasha
    Kingston, Celia
    Thomas, Alan
    CONSOIL 2008: THEME E - REMEDIATION CONCEPTS & TECHNOLOGIES, VOLS 1-3, 2008, : 535 - 540
  • [42] Development of passive in-situ methods for groundwater remediation
    Gillham, RW
    Blowes, DW
    PROCEEDINGS OF THE INTERNATIONAL SYMPOSIUM ON HYDROGEOLOGY AND THE ENVIRONMENT, 2000, : 8 - 13
  • [43] Technical challenges to in-situ remediation of polluted sites
    Reddy K.R.
    Geotechnical and Geological Engineering, 2010, 28 (3) : 211 - 221
  • [44] STEAM-AIR-INJECTION FOR IN-SITU GROUNDWATER AND SOIL REMEDIATION: PILOT APPLICATION AT THE FORMER INDUSTRIAL SITE IN ZEITZ, GERMANY
    Koschitzky, Hans-Peter
    Troetschler, Oliver
    Limburg, Berit
    Hirsch, Markus
    Weiss, Holger
    CONSOIL 2008: THEME E - REMEDIATION CONCEPTS & TECHNOLOGIES, VOLS 1-3, 2008, : 85 - +
  • [45] Review of in-situ process monitoring and in-situ metrology for metal additive manufacturing
    Everton, Sarah K.
    Hirsch, Matthias
    Stravroulakis, Petros
    Leach, Richard K.
    Clare, Adam T.
    MATERIALS & DESIGN, 2016, 95 : 431 - 445
  • [46] Integrated photothermal microscope and laser damage test facility for in-situ investigation of nanodefect induced damage
    During, A
    Commandré, M
    Fossati, C
    Bertussi, B
    Natoli, JY
    Rullier, JL
    Bercegol, H
    Bouchut, P
    OPTICS EXPRESS, 2003, 11 (20): : 2497 - 2501
  • [47] Natural remediation of organic and metal constituents at a chemical manufacturing facility
    Swindoll, CM
    Hartten, AS
    Wood, KN
    Lee, MD
    Bishop, AL
    Lawrence, WJ
    Davis, KL
    Conner, JM
    IN SITU AND ON-SITE BIOREMEDIATION, VOL 2, 1997, 4(2) (02): : 137 - 142
  • [48] Remediation and development of a former military manufacturing and test site in Florida USA
    Olsen, R. L.
    Woods, A. B.
    Edgar, M. H.
    BROWNFIELD SITES III: PREVENTION, ASSESSMENT, REHABILITATION AND DEVELOPMENT OF BROWNFIELD SITES, 2006, 94 : 121 - +
  • [49] An Integrated In-Situ Approach to Impacts from Natural Disasters on Critical Infrastructures
    Mittelstaedt, Sebastian
    Wang, Xiaoyu
    Eaglin, Todd
    Thom, Dennis
    Keim, Daniel
    Tolone, William
    Ribarsky, William
    2015 48TH HAWAII INTERNATIONAL CONFERENCE ON SYSTEM SCIENCES (HICSS), 2015, : 1118 - 1127
  • [50] A Triple Beam In-Situ Facility at Xiamen University
    Tang, Bing
    Zhang, Jian
    Ma, Ruigang
    Ma, Yingjun
    Huang, Qinghua
    Chen, Lihua
    Cui, Baoqun
    Wu, Yazhao
    Li, Ning
    Jiang, Weisheng
    MATERIALS TRANSACTIONS, 2014, 55 (03) : 410 - 412