Examples illustrate sour-gas processing megaproject metrics

被引:0
|
作者
Amott, Nick [1 ]
Mogose, Stephen [2 ]
机构
[1] Fluor Ltd, Oil & Gas Prod, Farnborough, Hants, England
[2] Fluor Ltd, Farnborough, Hants, England
关键词
D O I
暂无
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
引用
收藏
页码:58 / 65
页数:8
相关论文
共 50 条
  • [32] UNION-PACIFIC STARTS UP SOUR-GAS WAHSATCH SYSTEM
    TRUE, WR
    OIL & GAS JOURNAL, 1994, 92 (26) : 34 - 39
  • [33] User's approach to qualification of dynamic seals for sour-gas environments
    Abrams, Philip I.
    Kennelley, Kevin J.
    Johnson, Dale V.
    SPE Production Engineering, 1990, 5 (03):
  • [34] MICHIGAN PLANT OPENS UP NEARBY SOUR-GAS FIELD.
    Marsh, Robert J.
    1600, (85):
  • [35] In-line inspection guides integrity assessment, rehabilitation of sour-gas pipeline
    Hallen, JM
    González, JL
    Caleyo, F
    Fernández-Lagos, F
    OIL & GAS JOURNAL, 2002, 100 (15) : 62 - 66
  • [36] Novel approach to sour-gas treatment lowers cost and limits safety hazards
    Carpenter, Chris
    JPT, Journal of Petroleum Technology, 2019, 71 (04): : 55 - 56
  • [37] CONTINGENCY PLANNING FOR DRILLING AND PRODUCING HIGH-PRESSURE SOUR-GAS WELLS
    HAMBY, TW
    SMITH, JR
    JOURNAL OF PETROLEUM TECHNOLOGY, 1972, 24 (NMAR): : 347 - &
  • [38] Finite service life evaluation method of production casing for sour-gas wells
    Zhang Zhi
    Li Jing
    Zheng Yushan
    Zhang Cheng
    Zhang Qingsheng
    Zeng Dezhi
    Zhong Xiankang
    JOURNAL OF PETROLEUM SCIENCE AND ENGINEERING, 2018, 165 : 171 - 180
  • [39] Sour-gas sweetening during offshore drillstem tests. A case history
    Casselman, Robert
    SPE Production Engineering, 1990, 5 (02):