CREW SCHEDULING CONSIDERING BOTH CREW DUTY TIME DIFFERENCE AND COST ON URBAN RAIL SYSTEM

被引:8
|
作者
Zhou, Wenliang [1 ]
Yang, Xia [2 ]
Qin, Jin [1 ]
Deng, Lianbo [1 ]
机构
[1] Cent South Univ, Sch Traff & Transportat Engn, 22 ShaoShan South Rd, Changsha 410075, Hunan, Peoples R China
[2] Rensselaer Polytech Inst, Dept Civil & Environm Engn, Troy, NY 12180 USA
来源
PROMET-TRAFFIC & TRANSPORTATION | 2016年 / 28卷 / 05期
关键词
urban railway; crew schedule; ant colony algorithm; duty time difference; PRICE;
D O I
10.7307/ptt.v28i5.1842
中图分类号
U [交通运输];
学科分类号
08 ; 0823 ;
摘要
Urban rail crew scheduling problem is to allocate train services to crews based on a given train timetable while satisfying all the operational and contractual requirements. In this paper, we present a new mathematical programming model with the aim of minimizing both the related costs of crew duty and the variance of duty time spreads. In addition to iincorporating the commonly encountered crew scheduling constraints, it also takes into consideration the constraint of arranging crews having a meal in the specific meal period of one day rather than after a minimum continual service time. The proposed model is solved by an ant colony algorithm which is built based on the construction of ant travel network and the design of ant travel path choosing strategy. The performances of the model and the algorithm are evaluated by conducting case study on Changsha urban rail. The results indicate that the proposed method can obtain a satisfactory crew schedule for urban rails with a relatively small computational time.
引用
收藏
页码:449 / 460
页数:12
相关论文
共 50 条
  • [31] A Bus Crew Scheduling Problem with Eligibility Constraints and Time Limitations
    Oztop, Hande
    Eliiyi, Ugur
    Eliiyi, Deniz Tursel
    Kandiller, Levent
    [J]. 19TH EURO WORKING GROUP ON TRANSPORTATION MEETING (EWGT2016), 2017, 22 : 222 - 231
  • [32] Set partition model and algorithm for crew pairing problem in urban rail transit
    Shi, Jungang
    Zhou, Feng
    Xu, Ruihua
    [J]. Tongji Daxue Xuebao/Journal of Tongji University, 2015, 43 (02): : 232 - 238
  • [33] TWO APPROACHES TO VEHICLE AND CREW SCHEDULING IN URBAN AND REGIONAL BUS TRANSPORT
    Paluch, Stanislav
    [J]. PROCEEDINGS OF THE INTERNATIONAL CONFERENCE QUANTITATIVE METHODS IN ECONOMICS (MULTIPLE CRITERIA DECISION MAKING XIV), 2008, : 212 - 219
  • [34] Genetic Algorithm-Based Column Generation Approach to Passenger Rail Crew Scheduling
    Liu, Mindy
    Haghani, Ali
    Toobaie, Shahabeddin
    [J]. TRANSPORTATION RESEARCH RECORD, 2010, (2159) : 36 - 43
  • [35] A BUS CREW SCHEDULING SYSTEM USING A SET COVERING FORMULATION
    SMITH, BM
    WREN, A
    [J]. TRANSPORTATION RESEARCH PART A-POLICY AND PRACTICE, 1988, 22 (02) : 97 - 108
  • [36] Study of Crew Scheduling System for High-speed Railway
    Guo, Bin
    Zhou, Leishan
    Li, Dandan
    [J]. ADVANCES IN COMPUTERS, ELECTRONICS AND MECHATRONICS, 2014, 667 : 72 - +
  • [37] COCKPIT CREW SCHEDULING AND SUPPORTING SYSTEM USING AI TECHNIQUES
    ONODERA, K
    [J]. NEC RESEARCH & DEVELOPMENT, 1989, (92): : 151 - 156
  • [38] A BUS CREW SCHEDULING SYSTEM USING A SET PARTITIONING MODEL
    FALKNER, JC
    RYAN, DM
    [J]. ASIA-PACIFIC JOURNAL OF OPERATIONAL RESEARCH, 1987, 4 (01) : 39 - 56
  • [39] IMPACS - A BUS CREW SCHEDULING SYSTEM USING INTEGER PROGRAMMING
    SMITH, BM
    [J]. MATHEMATICAL PROGRAMMING, 1988, 42 (01) : 181 - 187
  • [40] Crew Assignment with Duty Time Limits for Transport Services: Tight Multicommodity Models
    Balakrishnan, Anantaram
    Mirchandani, Prakash
    Lin, Sifeng
    [J]. OPERATIONS RESEARCH, 2022, 70 (02) : 690 - 714