CREW SCHEDULING CONSIDERING BOTH CREW DUTY TIME DIFFERENCE AND COST ON URBAN RAIL SYSTEM

被引:9
|
作者
Zhou, Wenliang [1 ]
Yang, Xia [2 ]
Qin, Jin [1 ]
Deng, Lianbo [1 ]
机构
[1] Cent South Univ, Sch Traff & Transportat Engn, 22 ShaoShan South Rd, Changsha 410075, Hunan, Peoples R China
[2] Rensselaer Polytech Inst, Dept Civil & Environm Engn, Troy, NY 12180 USA
来源
PROMET-TRAFFIC & TRANSPORTATION | 2016年 / 28卷 / 05期
关键词
urban railway; crew schedule; ant colony algorithm; duty time difference; PRICE;
D O I
10.7307/ptt.v28i5.1842
中图分类号
U [交通运输];
学科分类号
08 ; 0823 ;
摘要
Urban rail crew scheduling problem is to allocate train services to crews based on a given train timetable while satisfying all the operational and contractual requirements. In this paper, we present a new mathematical programming model with the aim of minimizing both the related costs of crew duty and the variance of duty time spreads. In addition to iincorporating the commonly encountered crew scheduling constraints, it also takes into consideration the constraint of arranging crews having a meal in the specific meal period of one day rather than after a minimum continual service time. The proposed model is solved by an ant colony algorithm which is built based on the construction of ant travel network and the design of ant travel path choosing strategy. The performances of the model and the algorithm are evaluated by conducting case study on Changsha urban rail. The results indicate that the proposed method can obtain a satisfactory crew schedule for urban rails with a relatively small computational time.
引用
收藏
页码:449 / 460
页数:12
相关论文
共 50 条
  • [1] A Crew Rostering Optimization Method for Urban Rail Transit Considering Crew Preference
    Jin, Hua
    Chen, Shaokuan
    Feng, Xujie
    Bai, Yun
    Li, Hao
    [J]. Tiedao Xuebao/Journal of the China Railway Society, 2023, 45 (07): : 29 - 37
  • [2] An Optimal Crew Scheduling Model for Urban Rail Transit
    Zhou Feng
    Xu Ruihua
    [J]. PROCEEDINGS OF 2010 3RD IEEE INTERNATIONAL CONFERENCE ON COMPUTER SCIENCE AND INFORMATION TECHNOLOGY (ICCSIT 2010), VOL 6, 2010, : 113 - 116
  • [3] A branch-and-price algorithm for integrating urban rail crew scheduling and rostering problems
    Feng, Tao
    Lusby, Richard M.
    Zhang, Yongxiang
    Tao, Siyu
    Zhang, Bojian
    Peng, Qiyuan
    [J]. TRANSPORTATION RESEARCH PART B-METHODOLOGICAL, 2024, 183
  • [4] CREW-OPT - SUBPROBLEM MODELING IN A COLUMN GENERATION APPROACH TO URBAN CREW SCHEDULING
    DESROCHERS, M
    GILBERT, J
    SAUVE, M
    SOUMIS, F
    [J]. LECTURE NOTES IN ECONOMICS AND MATHEMATICAL SYSTEMS, 1992, 386 : 395 - 406
  • [5] Vehicle and crew scheduling for urban bus lines
    Rodrigues, MM
    de Souza, CC
    Moura, AV
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2006, 170 (03) : 844 - 862
  • [6] Repair Crew Scheduling Considering Variable Disaster Aspects
    Kim, Sungwoo
    Park, Youngsoo
    Lee, Kihyun
    Moon, Ilkyeong
    [J]. ADVANCES IN PRODUCTION MANAGEMENT SYSTEMS: THE PATH TO INTELLIGENT, COLLABORATIVE AND SUSTAINABLE MANUFACTURING, 2017, 513 : 57 - 63
  • [7] A Model for Bus Crew Scheduling Problem with Multiple Duty Types
    Chen, Mingming
    Niu, Huimin
    [J]. DISCRETE DYNAMICS IN NATURE AND SOCIETY, 2012, 2012
  • [8] A hybrid model for crew scheduling in rail rapid transit networks
    Fuentes, Manuel
    Cadarso, Luis
    Marin, Angel
    [J]. TRANSPORTATION RESEARCH PART B-METHODOLOGICAL, 2019, 125 : 248 - 265
  • [9] Simultaneous vehicle and crew scheduling for extra urban transports
    Laurent, Benoit
    Hao, Jin-Kao
    [J]. NEW FRONTIERS IN APPLIED ARTIFICIAL INTELLIGENCE, 2008, 5027 : 466 - +
  • [10] Research on optimization of flight crew scheduling considering pilot fatigue
    Lin, Hui
    Guo, Chao
    You, Jianxin
    Xia, Ming
    [J]. INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING COMPUTATIONS, 2024, 15 (01) : 171 - 188