Improved algorithms for single-machine common due window assignment and scheduling with batch deliveries

被引:5
|
作者
Li, Chung-Lun [1 ]
机构
[1] Hong Kong Polytech Univ, Dept Logist & Maritime Studies, Kowloon, Hong Kong, Peoples R China
关键词
Scheduling; Due window; Batch delivery; Computational complexity; MAINTENANCE ACTIVITY;
D O I
10.1016/j.tcs.2014.12.021
中图分类号
TP301 [理论、方法];
学科分类号
081202 ;
摘要
We consider a single-machine due window assignment and scheduling problem with batch deliveries, where all jobs have a common due window, and the start time and size of the due window are decision variables. Finished jobs are delivered in batches with unlimited batch capacity. The objective is to determine the due window, a job sequence, and the delivery times, so as to minimize the total cost which comprises earliness of delivery, job holding, start time of due window, size of due window, number of delivery batches, and tardiness penalty. We consider three different variants of the problem corresponding to different measurements of tardiness penalty. We present polynomial-time solution procedures for these variants with significantly lower computational complexities than those of known algorithms in the literature. (C) 2015 Elsevier B.V. All rights reserved.
引用
收藏
页码:30 / 39
页数:10
相关论文
共 50 条
  • [21] Single batch machine scheduling with deliveries
    Cheng, B. -Y.
    Leung, J. Y. -T.
    Li, K.
    Yang, S. -L.
    NAVAL RESEARCH LOGISTICS, 2015, 62 (06) : 470 - 482
  • [22] Scheduling Jobs and A Variable Maintenance on A Single Machine with Common Due-window Assignment
    Gong, Jianbo
    Wan, Long
    Luo, Wenchang
    INTERNATIONAL JOURNAL OF APPLIED MATHEMATICS & STATISTICS, 2014, 52 (07): : 81 - 89
  • [23] Single-machine batch delivery scheduling with an assignable common due date and controllable processing times
    Yin, Yunqiang
    Cheng, T. C. E.
    Cheng, Shuenn-Ren
    Wu, Chin-Chia
    COMPUTERS & INDUSTRIAL ENGINEERING, 2013, 65 (04) : 652 - 662
  • [24] Optimal single-machine scheduling about a common due window with earliness/tardiness and additional penalties
    Wu, Y
    Wang, DW
    INTERNATIONAL JOURNAL OF SYSTEMS SCIENCE, 1999, 30 (12) : 1279 - 1284
  • [25] Single-machine serial-batch delivery scheduling with two competing agents and due date assignment
    Yunqiang Yin
    Doudou Li
    Dujuan Wang
    T. C. E. Cheng
    Annals of Operations Research, 2021, 298 : 497 - 523
  • [26] Single-machine serial-batch delivery scheduling with two competing agents and due date assignment
    Yin, Yunqiang
    Li, Doudou
    Wang, Dujuan
    Cheng, T. C. E.
    ANNALS OF OPERATIONS RESEARCH, 2021, 298 (1-2) : 497 - 523
  • [27] Single-Machine Due-Window Assignment Scheduling with Resource Allocation and Generalized Earliness/Tardiness Penalties
    Tian, Yu
    ASIA-PACIFIC JOURNAL OF OPERATIONAL RESEARCH, 2022, 39 (05)
  • [28] Study on Single-Machine Group Scheduling with Due-Window Assignment and Position-Dependent Weights
    Liu, Weiguo
    Wang, Xuyin
    Wang, Xiaoxiao
    Zhao, Peizhen
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2021, 2021
  • [29] BATCH DELIVERY SCHEDULING ON A SINGLE-MACHINE
    CHENG, TCE
    GORDON, VS
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1994, 45 (10) : 1211 - 1215
  • [30] A Single Processor Scheduling Problem with a Common Due Window Assignment
    Janiak, Adam
    Winczaszek, Marcin
    OPERATIONS RESEARCH PROCEEDINGS 2004, 2005, : 213 - 220