Illumination and Visibility of Workers in Nighttime Highway Work Zones

被引:0
|
作者
Jafarnejad, Ali [1 ]
Gambatese, John A. [1 ]
Nnaji, Chukwuma [1 ]
机构
[1] Oregon State Univ, Sch Civil & Construct Engn, 101 Kearney Hall, Corvallis, OR 97331 USA
关键词
CONSTRUCTION;
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Much of the construction work that occurs on high-speed roadways takes place at night to minimize impacts on drivers. Performing work at night exposes workers to hazards that are not present during the daytime such as driver drowsiness, alcohol use, and reduction in visibility. Illuminating the area where work is taking place can provide sufficient lighting for the workers to see their work and help them to be more visible. Depending on various factors such as the amount of light needed and the nature of work operation, different lighting equipment is used for illumination. Mobile lights attached to the construction equipment, portable lights, and personal lights worn by workers are examples that can be used to provide the necessary lighting. The authors performed a survey of current lighting systems and practices in preservation project work zones across the U.S. The impact of two lighting systems including the light tower and balloon light on visibility of the workers was evaluated. The authors examined the visibility of workers at different distances, various locations in regards to the light and with different high visibility apparel. The results of the survey showed that a portable light tower and balloon lights are the most commonly-used types of lighting system in construction work zones. Moreover, workers feel safer when using additional personal light equipment such as a flashlight. The location of the worker on the roadway relative to the light location is a significant factor in the visibility of the worker. Selected lighting strategies are provided to be considered in designing nighttime work zones to improve the visibility of workers and increase safety in highway work zone construction.
引用
收藏
页码:231 / 240
页数:10
相关论文
共 50 条
  • [31] Field Experiments to Evaluate and Control Light Tower Glare in Nighttime Work Zones
    Odeh, Ibrahim
    El-Rayes, Khaled
    Liu, Liang
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2009, 135 (09): : 911 - 919
  • [32] ESTIMATING MOTORIST DELAY AT 2-LANE HIGHWAY WORK ZONES
    CASSIDY, MJ
    SON, YT
    ROSOWSKY, DV
    TRANSPORTATION RESEARCH PART A-POLICY AND PRACTICE, 1994, 28 (05) : 433 - 444
  • [33] Model for analysis of factors affecting construction schedule in highway work zones
    Sukumaran, Praveen
    Bayraktar, Mehmet Emre
    Hong, TaeHoon
    Hastak, Makarand
    JOURNAL OF TRANSPORTATION ENGINEERING, 2006, 132 (06) : 508 - 517
  • [34] Safety impacts of signalized lane merge control at highway work zones
    Qi, Yi
    Zhao, Qun
    TRANSPORTATION PLANNING AND TECHNOLOGY, 2017, 40 (05) : 577 - 591
  • [35] Evaluation of Spatial and Temporal Speed Limit Compliance in Highway Work Zones
    Wasson, Jason S.
    Boruff, Guy W.
    Hainen, Alexander M.
    Remias, Stephen M.
    Hulme, Eric A.
    Farnsworth, Grant D.
    Bullock, Darcy M.
    TRANSPORTATION RESEARCH RECORD, 2011, (2258) : 1 - 15
  • [36] Estimating motorist delay at two-lane highway work zones
    Cassidy, Michael J.
    Son, YoungTae
    Rosowsky, David V.
    1600, Pergamon Press Inc, Tarrytown, NY, United States (28):
  • [37] Probabilistic speed-flow models in highway construction work zones
    Weng, Jinxian
    Chen, Qiang
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-TRANSPORT, 2023, 176 (02) : 110 - 116
  • [38] Variance analysis of factors that affected traffic safety in highway work zones
    Zhang, Yanyan
    Zhu, Shunying
    Wang, Hong
    Hu, Yanjie
    Liu, Bing
    ICTIS 2011: Multimodal Approach to Sustained Transportation System Development - Information, Technology, Implementation - Proceedings of the 1st Int. Conf. on Transportation Information and Safety, 2011, : 567 - 574
  • [39] A macroscopic traffic model for highway work zones: Formulations and numerical results
    Department of Civil Engineering, University of Maryland, College Park, United States
    不详
    J Adv Transp, 3 (265-287):
  • [40] Queueing delay models for two-lane highway work zones
    Son, YT
    TRANSPORTATION RESEARCH PART B-METHODOLOGICAL, 1999, 33 (07) : 459 - 471