Optimal use of budget reserves to minimize technical and management failure risks during complex project development

被引:16
|
作者
Dillon, RL [1 ]
Paté-Cornell, A
Guikema, SD
机构
[1] Georgetown Univ, McDonough Sch Business, Washington, DC 20057 USA
[2] Stanford Univ, Management Sci & Engn Dept, Stanford, CA 93405 USA
[3] Cornell Univ, Dept Civil & Environm Engn, Ithaca, NY 14853 USA
关键词
budget reserves; decision analysis; project management; resource optimization; risk management;
D O I
10.1109/TEM.2005.850733
中图分类号
F [经济];
学科分类号
02 ;
摘要
Project managers are recognizing that adequate resource reserves are a critical success factor in a project development environment that is complex and uncertain. Yet, justifying the need for project reserves is still a challenge, as is the optimal allocation of any available resources to minimize development uncertainties. This paper presents a multiperiod decision model designed to support the management of reserves considering the risks of failures including technical, managerial, i.e., exceeding budget and schedule, or strategic, i.e., meeting budget, schedule, and technical specifications but not achieving the full strategic value of the project. In this paper, we examine the tradeoffs among these risks and their implications for resource allocation during a project's development phase. This decision support model is referred to as Dynamic Advanced Probabilistic Risk Analysis Model. It provides decision makers with a quantitative tool to allocate reserves (beyond. the bare-bone minimum project costs) among project reserves, technical reinforcements of the engineered system, and product enhancements, with the advantage of flexibility over time. The model yields first, coarse estimates of the value of deferring some commitments about the product's design until critical uncertainties are resolved and second, an estimate of the optimal amount to be invested in testing and reviews. We show that the greater the uncertainties at the onset of the development phase, the greater the value of this information.
引用
收藏
页码:382 / 395
页数:14
相关论文
共 4 条
  • [1] Use of Management Techniques Technical Risks in a Software Development Company
    Penha, Renato
    Kniess, Claudia Terezinha
    Bergman, Daniel Reed
    Biancolino, Cesar Augusto
    [J]. REVISTA GESTAO & TECNOLOGIA-JOURNAL OF MANAGEMENT AND TECHNOLOGY, 2014, 14 (01): : 151 - 173
  • [2] Modeling a Global Software Development Project as a Complex Socio-Technical System to Facilitate Risk Management and Improve the Project Structure
    Bider, Ilia
    Otto, Henning
    [J]. 2015 IEEE 10TH INTERNATIONAL CONFERENCE ON GLOBAL SOFTWARE ENGINEERING (ICGSE 2015), 2015, : 1 - 12
  • [3] The Changes in Team Cognition and Cognitive Artifact Use During Agile Software Development Project Management
    Drury-Grogan, Meghann L.
    [J]. PROJECT MANAGEMENT JOURNAL, 2021, 52 (02) : 127 - 145
  • [4] The IRISK project: Development of an integrated technical and management risk control and monitoring methodology for managing and quantifying on-site and off-site risks.
    Oh, JIH
    Brouwer, WGJ
    Bellamy, LJ
    Hale, AR
    Ale, BJM
    Papazoglou, IA
    [J]. PROBABILISTIC SAFETY ASSESSMENT AND MANAGEMENT (PSAM 4), VOLS 1-4, 1998, : 2485 - 2491