A KNOWLEDGE BASED APPROACH TO PRODUCTION PLANNING AND SCHEDULING IN A METALLURGICAL COMPANY

被引:0
|
作者
Relich, Marcin [1 ]
Witkowski, Krzysztof [1 ]
Saniuk, Sebastian [1 ]
Sujanova, Jana [2 ]
机构
[1] Univ Zielona Gora, Zielona Gora, Poland
[2] Slovak Univ Technol Bratislava, Trnava, Slovakia
关键词
production flow; decision support system; constraint programming; search strategies;
D O I
暂无
中图分类号
TF [冶金工业];
学科分类号
0806 ;
摘要
Decision-making supported by task-oriented software tools plays more and more role in the production companies, including metallurgical plants. Decision-making in production planning and scheduling requires the response in an interactive real-time mode. It is an incentive for developing decision support system (DSS) that enables a fast prototyping of production flows in multi-project environment. The paper aims at providing a knowledge base approach allowing one to be independent of context or representation data as well as allowing for the design of an interactive and task-oriented DSS. The assumed knowledge base mode of specifying a production system leads to solving a decision problem formulated in terms of constraint satisfaction problem (CSP). Possible scenarios of the CSP decomposition as well as possibility of different programming languages application lead to a problem of searching for a distribution strategy that enables a real-time mode. A declarative form of the description of a multicriteria decision problem allows its implementation in constraint programming languages and facilitates the development of DSS. Illustrative example concerns optimal steelmaking process scheduling with constraints such as processing time, limited waiting time between adjacent tasks, and amount of resources allocated to tasks. Numerical experiments present the use of constraint programming approach, including various search strategies, to production planning and scheduling in the context of a metallurgical company.
引用
收藏
页码:1846 / 1851
页数:6
相关论文
共 50 条
  • [41] A USER INTERFACE FOR A KNOWLEDGE-BASED PLANNING AND SCHEDULING SYSTEM
    MULVEHILL, AM
    [J]. IEEE TRANSACTIONS ON SYSTEMS MAN AND CYBERNETICS, 1988, 18 (04): : 514 - 521
  • [42] KNOWLEDGE ELICITATION AND THE DEVELOPMENT OF A KNOWLEDGE-BASED SYSTEM FOR PRODUCTION SCHEDULING
    PRICE, G
    DUNNE, FPE
    TEOH, KS
    WALTERS, DG
    [J]. PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART B-JOURNAL OF ENGINEERING MANUFACTURE, 1995, 209 (02) : 99 - 106
  • [43] DNA Based Approach: Integration of Process Planning and Scheduling
    Mohapatra, Priyabrata
    Nanda, Sourabh
    Maji, Susovan
    [J]. PROCEEDINGS OF 2015 IEEE 9TH INTERNATIONAL CONFERENCE ON INTELLIGENT SYSTEMS AND CONTROL (ISCO), 2015,
  • [44] A Digital Twin-based Approach Performing Integrated Process Planning and Scheduling for Service-based Production
    Mueller-Zhang, Zai
    Kuhn, Thomas
    [J]. 2022 IEEE 27TH INTERNATIONAL CONFERENCE ON EMERGING TECHNOLOGIES AND FACTORY AUTOMATION (ETFA), 2022,
  • [45] A negotiation based approach for agent based production scheduling
    Klein, Matthias
    Loecklin, Andreas
    Jazdi, Nasser
    Weyrich, Michael
    [J]. 28TH INTERNATIONAL CONFERENCE ON FLEXIBLE AUTOMATION AND INTELLIGENT MANUFACTURING (FAIM2018): GLOBAL INTEGRATION OF INTELLIGENT MANUFACTURING AND SMART INDUSTRY FOR GOOD OF HUMANITY, 2018, 17 : 334 - 341
  • [46] A neural-based approach to production scheduling
    Yu, HB
    Wang, HB
    Xu, XH
    Xue, JS
    [J]. PROCEEDINGS OF THE 1997 AMERICAN CONTROL CONFERENCE, VOLS 1-6, 1997, : 1027 - 1031
  • [47] MASTER PRODUCTION SCHEDULING - A FUNCTION BASED APPROACH
    GIESBERTS, PMJ
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 1991, 24 (1-2) : 65 - 76
  • [48] Scheduling cardiac procedures: A knowledge-based approach
    Bharadwaj, A
    Sen, A
    Vinze, A
    [J]. IEEE TRANSACTIONS ON ENGINEERING MANAGEMENT, 1999, 46 (03) : 322 - 334
  • [49] FMS scheduling with knowledge based genetic algorithm approach
    Prakash, A.
    Chan, Felix T. S.
    Deshrnukh, S. G.
    [J]. EXPERT SYSTEMS WITH APPLICATIONS, 2011, 38 (04) : 3161 - 3171
  • [50] A Reactive Scheduling Approach Based on Domain-Knowledge
    Novas, Juan M.
    Henning, Gabriela P.
    [J]. 10TH INTERNATIONAL SYMPOSIUM ON PROCESS SYSTEMS ENGINEERING, 2009, 27 : 765 - 770