Allegheny River tunnel crossing project

被引:0
|
作者
Roy, Paul A. [1 ]
Boscardin, Marco D. [2 ]
Miller, Andy J. [3 ]
机构
[1] DMJM Harris, New York, NY 10158 USA
[2] Boscardin Consulting Engn Inc, Amherst, MA USA
[3] Faber Maunsell Ltd, Beckenham, Kent, England
关键词
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The North Shore Connector Project for the Port Authority of Allegheny County constructs twin Tunnel Boring Machine (TBM) tunnels through cohesive soils and rock beneath the Allegheny River and a narrow city street in Pittsburgh, PA. The tunnel alignment includes an historic building on shallow foundations, modern buildings on deep foundations, and an office building constructed directly over the alignment during the design of the tunnel sections. This paper provides an overview and update of the general site conditions, TBM tunnel design, and support of excavation for the TBM launching pit. Deformation limits, ground improvement, monitoring and mitigation plans are also discussed.
引用
收藏
页码:587 / +
页数:2
相关论文
共 50 条
  • [1] Review on construction technology for Fuxingdonglu crossing-river tunnel project in Shanghai
    Zhou, Song
    Yanshilixue Yu Gongcheng Xuebao/Chinese Journal of Rock Mechanics and Engineering, 2004, 23 (SUPPL. 2): : 4761 - 4769
  • [2] Key construction technology for the Nanjing Weisan Road river-crossing tunnel project
    Yao, Zhanhu
    Yang, Zhao
    Tian, Yi
    Hu, Huitao
    Modern Tunnelling Technology, 2015, 52 (04) : 15 - 23
  • [3] General design and key technologies of the Nanjing Weisan Road river-crossing tunnel project
    Tuo, Yongfei
    Guo, Xiaohong
    Modern Tunnelling Technology, 2015, 52 (04) : 1 - 6
  • [4] Design and construction of river crossing tunnel beneath Tachia River, Taiwan
    Liu, Hong-Shiang
    Shou, Keh-Jian
    Hou, Ping-Cheng
    Tsai, Chin-Fa
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2010, 25 (05) : 638 - 650
  • [5] JUSTIFICATION OF A NOVEL PIPE IN TUNNEL APPROACH TO A RIVER CROSSING
    Jandu, Chas
    Taylor, Mike
    Humphrey, Stephen
    IPC2008: PROCEEDINGS OF THE ASME INTERNATIONAL PIPELINE CONFERENCE - 2008, VOL 1, 2009, : 141 - 151
  • [6] The mechanical characteristics of Yellow River crossing tunnel composite linings in the south-north water diversion project
    Yang, J.
    Ma, J.
    Li, F. X.
    Cheng, Y.
    Wang, R. H.
    Wang, J.
    WATER RESOURCES AND ENVIRONMENT, 2016, : 39 - 45
  • [7] EPB tunnelling at the Silvertown Tunnel Project in London: Approach and challenges of the river crossing in mixed-face conditions
    Conrads A.
    Hooi Lim O.
    Thomas I.
    Geomechanik und Tunnelbau, 2024, 17 (04): : 276 - 288
  • [8] Hydrological Observation of Qiantang River in the River Crossing Tunnel of Metro Line 8
    Zhou, Hanyu
    Dong, Haiyang
    Lu, Hanzhang
    Li, Zongyu
    Chen, Fanjun
    2020 3RD INTERNATIONAL CONFERENCE OF GREEN BUILDINGS AND ENVIRONMENTAL MANAGEMENT, 2020, 531
  • [9] Water pressure test in the design of the tunnel in Yellow River crossing project of the mid-route of South-to-north water transfer project
    Yang, J.
    Wang, J.
    Wang, R. H.
    Cheng, L.
    Li, F. X.
    WATER RESOURCES AND ENVIRONMENT, 2016, : 59 - 65
  • [10] Pipe jacking tunnel construction crossing the Bang Pakong River
    Piriyakul, K.
    Pochalard, S.
    Rungrueng, E.
    Geotechnical Aspects of Underground Construction in Soft Ground - Proceedings of the 10th International Symposium on Geotechnical Aspects of Underground Construction in Soft Ground, IS-CAMBRIDGE 2022, 2021, : 123 - 128