Full-scale experience with the deammonification process to treat high strength sludge water - a case study

被引:57
|
作者
Jardin, N. [1 ]
Hennerkes, J. [1 ]
机构
[1] Ruhrverband, D-45128 Essen, Germany
关键词
Anammox; deammonification; reject water; SBR; sludge water; NITROGEN REMOVAL; INHIBITION; NITRIFICATION; ANAMMOX;
D O I
10.2166/wst.2012.867
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
More stringent effluent criteria with regard to nitrogen calls for improved nutrient removal techniques in wastewater treatment plants (WWTPs). Besides optimisation of the liquid treatment train of the plants, attention has increasingly centred on the problem of return flows from sludge treatment. One of the most recent developments aimed at the reduction of this nitrogen load is deammonification which has been used at one of Ruhrverband's plants since 2002 by applying a moving bed system. To gain additional experience in operating this process, another full scale plant was modified in 2007 by integration of deammonification, using a SBR system with suspended biomass based on the DEMON (R) control scheme. By using seeding sludge from Strass WWTP in Austria, start-up has been achieved within only 1 day. After stable operation for several months, increasing nitrate concentrations were observed in the effluent of the system indicating growing activity of nitrite oxidising bacteria (NOB). Following severe process deterioration, it was decided to re-start the system again but the same behaviour, i.e. increasing levels of nitrate, was observed once again. Several approaches were used to suppress NOB organisms in full-scale without success, e.g. low oxygen levels and high free ammonia concentrations. Finally, the reduction of the aerobic cycle length during intermittent aeration down to 8 min, followed by an anoxic mixing period of only 18 min was successful in inhibiting the activity of NOB organisms, most probably due to their elevated lag-phase compared with ammonium oxidising bacteria. Today, nitrogen elimination that has been stabilised at more than 80% at a daily volumetric loading rate of 0.5 kg N/(m(3) d). The total costs amount to (sic)2.3/kg N-ell.
引用
收藏
页码:447 / 455
页数:9
相关论文
共 50 条
  • [31] Experimental studies on full-scale high-strength concrete columns
    Xiao, Y
    Yun, HW
    [J]. ACI STRUCTURAL JOURNAL, 2002, 99 (02) : 199 - 207
  • [32] Evaluation of upgrading a full-scale activated sludge process integrated with floating biofilm carriers
    Ge, Shijian
    Zhu, Yunpeng
    Qiu, Shuang
    Yang, Xiong
    Ma, Bin
    Huang, Donghui
    Peng, Yongzhen
    [J]. WATER SCIENCE AND TECHNOLOGY, 2014, 70 (10) : 1594 - 1601
  • [33] Full-Scale Application of Catalytic Ozonation for Drinking Water Treatment: Case Study in China
    Liu, Zheng-Qian
    Han, Bang-Jun
    Wen, Gang
    Ma, Jun
    Wang, Sheng-Jun
    Zha, Ren-Guang
    Shen, Li-Ping
    Wang, Chun
    [J]. JOURNAL OF ENVIRONMENTAL ENGINEERING, 2014, 140 (09)
  • [34] Natural sludge dewatering .2. Thawing-drying process in full-scale sludge freezing ditches
    Hellstrom, D
    [J]. JOURNAL OF COLD REGIONS ENGINEERING, 1997, 11 (01) : 15 - 29
  • [35] Sludge reduction at low ozone doses: predictive effects and full-scale study
    Romero, P.
    Coello, M. D.
    Aragon, C. A.
    Eusebi, A. L.
    [J]. WATER SCIENCE AND TECHNOLOGY, 2015, 71 (02) : 191 - 196
  • [36] ENERGY SAVING, HIGH BIOLOGICAL PHOSPHORUS REMOVAL AND IMPROVEMENT OF SLUDGE SETTLEABILITY ON FULL-SCALE ANAEROBIC-AEROBIC ACTIVATED-SLUDGE PROCESS
    TANAKA, T
    KITAGAWA, M
    OHKUBO, E
    [J]. WATER SCIENCE AND TECHNOLOGY, 1991, 23 (4-6) : 801 - 810
  • [37] Bacterial removal performance and community changes during advanced treatment process: A case study at a full-scale water reclamation plant
    Cui, Qi
    Liu, Hai
    Yang, Hong-Wei
    Lu, Yun
    Chen, Zhuo
    Hu, Hong-Ying
    [J]. SCIENCE OF THE TOTAL ENVIRONMENT, 2020, 705 (705)
  • [38] ORGANIC WASTE VALORIZATION THROUGH COMPOSTING PROCESS: A FULL-SCALE CASE STUDY IN MAXIXE, MOZAMBIQUE
    Perteghella, Andrea
    Vaccari, Mentore
    [J]. ENVIRONMENTAL ENGINEERING AND MANAGEMENT JOURNAL, 2017, 16 (08): : 1819 - 1826
  • [39] Full-scale vacuum degassing of activated sludge-A case study over 2-years of operation
    Gnida, Anna
    Student, Sebastian
    [J]. JOURNAL OF WATER PROCESS ENGINEERING, 2021, 41
  • [40] Startup and performance of full-scale anaerobic granular sludge blanket reactor treating high strength inhibitory acrylic acid wastewater
    Show, Kuan-Yeow
    Yan, Yue-Gen
    Zhao, Jian
    Shen, Jie
    Han, Zhong-Xu
    Yao, Hai-Yong
    Lee, Duu-Jong
    [J]. BIORESOURCE TECHNOLOGY, 2020, 317 (317)