Pump and treat ground-water remediation system optimization

被引:83
|
作者
McKinney, DC [1 ]
Lin, MD [1 ]
机构
[1] NATL CHUNGHSING UNIV,DEPT ENVIRONM ENGN,TAICHUNG 40227,TAIWAN
关键词
D O I
10.1061/(ASCE)0733-9496(1996)122:2(128)
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
A ground-water management model using a nonlinear programming algorithm was developed to find the minimum cost design of the combined pumping and treatment components of a pump-and-treat remediation system and includes the fixed costs of system construction and installation as well as operation and maintenance. The fixed-cost terms of the objective function are incorporated into the nonlinear programming formulation using a penalty coefficient method. Results of applying the model to an aquifer with homogeneous hydraulic conductivity show that a combined well field and treatment process model that includes fixed costs has a significant impact on the design and cost of these systems, reducing the cost by using fewer, larger-flowrate wells. Previous pump-and-treat design formulations have resulted in systems with numerous, low-how-rate wells due to the use of simplified cost functions that do not exhibit economies of scale or fixed costs. Two example aquifers with heterogeneous conductivity fields were also investigated, and system costs similar to the homogeneous case were obtained. However, the introduction of aquifer heterogeneity did affect the remediation design, for example, well locations and pumping rates. Trade-offs between total remediation system cost and cleanup standard, remediation period, and typical design parameters of air-stripping towers are examined through sensitivity analysis. Generally, the optimal injection concentration is found to be approximately 70-80% of the cleanup standard. Designs with remediation periods around 5-6 yr have the minimum cost for the case study presented in this paper. Remediation periods beyond 6 yr are not economically justified, since the tower operating costs become dominant and offset the reduction of capital cost.
引用
收藏
页码:128 / 136
页数:9
相关论文
共 50 条
  • [41] RECHARGING GROUND-WATER
    BOUWER, H
    PYNE, RDG
    GOODRICH, JA
    [J]. CIVIL ENGINEERING, 1990, 60 (06): : 63 - 66
  • [42] ENERGY AND ENVIRONMENTAL ANALYSIS OF AN OPEN-LOOP GROUND-WATER HEAT PUMP SYSTEM IN AN URBAN AREA
    Baccino, Giorgia
    Lo Russo, Stefano
    Taddia, Glenda
    Verda, Vittorio
    [J]. THERMAL SCIENCE, 2010, 14 (03): : 693 - 706
  • [43] GREENING OF GROUND-WATER
    DULLE, KJ
    STRECKFUSS, TH
    [J]. CIVIL ENGINEERING, 1995, 65 (04): : 62 - 65
  • [44] A FIELD DEMONSTRATION OF THE UV OXIDATION TECHNOLOGY TO TREAT GROUND-WATER CONTAMINATED WITH VOCS
    LEWIS, N
    TOPUDURTI, K
    WELSHANS, G
    FOSTER, R
    [J]. JOURNAL OF THE AIR & WASTE MANAGEMENT ASSOCIATION, 1990, 40 (04): : 540 - 547
  • [45] CHEMISM OF GROUND-WATER IN THE NEUBRANDENBURG COUNTY .3. IODIDE IN THE GROUND-WATER
    DEIBEL, K
    [J]. ACTA HYDROCHIMICA ET HYDROBIOLOGICA, 1990, 18 (01): : 133 - 151
  • [46] UTILIZATION OF GROUND-WATER STORAGE IN STREAM SYSTEM DEVELOPMENT
    CONKLING, H
    [J]. TRANSACTIONS OF THE AMERICAN SOCIETY OF CIVIL ENGINEERS, 1946, 111 : 275 - 305
  • [47] SAMPLING OF VOCS WITH THE BAT GROUND-WATER SAMPLING SYSTEM
    MINES, BS
    DAVIDSON, JL
    BLOOMQUIST, D
    STAUFFER, TB
    [J]. GROUND WATER MONITORING AND REMEDIATION, 1993, 13 (01): : 115 - 120
  • [48] Ground-water treatments gain ground
    Abbasi, RA
    [J]. CIVIL ENGINEERING, 1996, 66 (02): : 53 - 55
  • [49] Experimental Research on Bleeding Performance of Single Well Ground-water Heat Pump
    Song, Wei
    Ni, Long
    Yao, Yang
    [J]. 10TH INTERNATIONAL SYMPOSIUM ON HEATING, VENTILATION AND AIR CONDITIONING, ISHVAC2017, 2017, 205 : 3156 - 3163
  • [50] Two-dimensional hydraulics of recirculating ground-water remediation wells in unconfined aquifers
    Stallard, WM
    Wu, KC
    Shi, N
    Corapcioglu, MY
    [J]. JOURNAL OF ENVIRONMENTAL ENGINEERING-ASCE, 1996, 122 (08): : 692 - 699