Optimizing consistency improvement of positive reciprocal matrices with implications for Monte Carlo Analytic Hierarchy Process

被引:20
|
作者
Negahban, Ashkan [1 ]
机构
[1] Penn State Univ, Sch Grad Profess Studies, Malvern, PA 19355 USA
关键词
Monte Carlo simulation; Analytic hierarchy process; Mixed-integer nonlinear programing; Consistency ratio; Facility layout; GROUP DECISION-MAKING; PREFERENCE RELATIONS; SIMULATION APPROACH; FACILITY LAYOUT; AHP; FUZZY; INDEX;
D O I
10.1016/j.cie.2018.07.018
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Motivated by a situation encountered in a real-world application of the Analytic Hierarchy Process (AHP), this paper extends previous work on improving consistency of positive reciprocal judgment matrices by optimizing their transformation into near-consistent matrices. A sampling-optimization-adjustment approach is proposed and integrated into the Monte Carlo AHP framework, allowing it to deal with situations where no or insufficient distinct near-consistent matrices can be generated by directly sampling from the original pairwise comparison distributions a situation that prohibits meaningful statistical analysis and effective decision-making using the traditional Monte Carlo AHP. Three mixed-integer nonlinear programing models are formulated for minimizing the sum of adjustments, maximum adjustment, and number of adjusted elements. Four heuristic algorithms are proposed to solve the models. The most appropriate heuristic(s) under each objective function and matrix size is detennined through extensive statistical analysis of numerical experiments. The paper also presents an application of the proposed enhanced Monte Carlo AHP in a real-world industrial example of facility layout design selection, where the traditional Monte Carlo AHP fails to provide sufficient information to perform any statistical analysis on the final ranks and weights for the components in the hierarchy.
引用
收藏
页码:113 / 124
页数:12
相关论文
共 50 条
  • [41] CONSISTENCY OF JUDGMENT MATRIX AND FUZZY WEIGHTS IN FUZZY ANALYTIC HIERARCHY PROCESS
    WANG, XZ
    KERRE, EE
    RUAN, D
    [J]. INTERNATIONAL JOURNAL OF UNCERTAINTY FUZZINESS AND KNOWLEDGE-BASED SYSTEMS, 1995, 3 (01) : 35 - 46
  • [42] Assessing and Improving Consistency of a Pairwise Comparison Matrix in the Analytic Hierarchy Process
    Yu, Oliver
    [J]. 2017 PORTLAND INTERNATIONAL CONFERENCE ON MANAGEMENT OF ENGINEERING AND TECHNOLOGY (PICMET), 2017,
  • [43] Probabilistic consistency of stochastic multiplicative comparison matrices based on Monte Carlo simulation
    Wang, Yixin
    Zhou, Ligang
    Li, Hao
    Dai, Xianchao
    [J]. INFORMATION SCIENCES, 2024, 656
  • [44] Enhancing Decision Fusion for Wastewater Treatment System Selection Using Monte Carlo Simulation and Gray Analytic Hierarchy Process
    Zhian, Tahmineh
    Monfared, Seyed Arman Hashemi
    Rashki, Mohsen
    Azizyan, Gholamreza
    [J]. WATER, 2024, 16 (12)
  • [45] An Improvement Analytic Hierarchy Process and its Application in Teacher Evaluation
    Si Xiulin
    Li Dawei
    [J]. 2014 Fifth International Conference on Intelligent Systems Design and Engineering Applications (ISDEA), 2014, : 169 - 172
  • [46] Practical application of an Analytic Hierarchy Process for the improvement of the warranty management
    Gonzalez Diaz, V.
    Gomez Fernandez, J.
    Crespo Marquez, A.
    [J]. JOURNAL OF QUALITY IN MAINTENANCE ENGINEERING, 2011, 17 (02) : 163 - +
  • [47] An Improvement Model of Analytic Hierarchy Process Based on Genetic Algorithm
    Sun, Xin
    Zheng, Jun
    Pang, Yin
    Ye, Chengfeng
    Zhang, Lei
    [J]. HIGH PERFORMANCE NETWORKING, COMPUTING, AND COMMUNICATION SYSTEMS, 2011, 163 : 237 - 244
  • [48] An Improvement Research of SWOT Method Based on Analytic Hierarchy Process
    Gong, Ting
    Yan, Hui
    [J]. INFORMATION TECHNOLOGY APPLICATIONS IN INDUSTRY, PTS 1-4, 2013, 263-266 : 2287 - 2290
  • [49] Choosing a quality improvement project using the analytic hierarchy process
    van de Water, Henny
    de Vries, Jan
    [J]. INTERNATIONAL JOURNAL OF QUALITY & RELIABILITY MANAGEMENT, 2006, 23 (04) : 409 - +
  • [50] Automatic repair of inconsistent pairwise weighting matrices in analytic hierarchy process
    Yang, I-Tung
    Wang, Wei-Chih
    Yang, Tzu-I
    [J]. AUTOMATION IN CONSTRUCTION, 2012, 22 : 290 - 297