Train working diagram system of high and middle speed train on JingHu high speed railway line

被引:0
|
作者
Ma, JJ [1 ]
Hu, SJ [1 ]
Chen, Y [1 ]
Li, JT [1 ]
机构
[1] No Jiaotong Univ, Coll Traff & Transportat, Beijing 100044, Peoples R China
关键词
D O I
暂无
中图分类号
U [交通运输];
学科分类号
08 ; 0823 ;
摘要
This paper discusses characteristics of operating schemes and train working diagram of high and middle speed train on JingHu high speed railway line, as well as principles to design. builds train working diagram system worked out with computer on basis of JingHu high speed railway line and existing netted line. and accomplishes simulation system requirement analysis, structure design, function design, and realizes modernization of working out, adjusting operating scheme and train working diagram. All of these reflect current status and developmental tendency of train working diagram worked out with computer at present day.
引用
收藏
页码:957 / 962
页数:6
相关论文
共 50 条
  • [21] Gearbox fault diagnosis of high-speed railway train
    Zhang, Bing
    Tan, Andy C. C.
    Lin, Jian-hui
    [J]. ENGINEERING FAILURE ANALYSIS, 2016, 66 : 407 - 420
  • [22] Generation mechanism of train operation conflicts in high speed railway
    Wang T.
    Huang K.
    Song X.
    Wang Z.
    [J]. EEA - Electrotehnica, Electronica, Automatica, 2020, 68 (03): : 41 - 46
  • [23] Inserting extra train services on high-speed railway
    Tan Y.
    Xu W.
    Jiang Z.
    Wang Z.
    Sun B.
    [J]. Jiang, Zhibin (jzb@tongji.edu.cn), 1600, Budapest University of Technology and Economics (49): : 16 - 24
  • [24] Study on the strategy of train operation adjustment on high speed railway
    Nie, L.
    Zhang, X.C.
    Zhao, P.
    Yang, H.
    Hu, A.Z.
    [J]. Tiedao Xuebao/Journal of the China Railway Society, 2001, 23 (04):
  • [25] Optimization to the Train Operating Schedule of Intercity High Speed Railway
    Xie, Ruhe
    Luo, Guixiu
    Peng, Zhongren
    [J]. PROCEEDINGS OF 2009 IEEE INTERNATIONAL CONFERENCE ON SERVICE OPERATION, LOGISTICS AND INFORMATICS, 2009, : 26 - +
  • [26] Synchronous Optimization Model of Station Redundant Time and Interval Redundant Time in High-speed Railway Train Working Diagram
    Niu H.-X.
    Ning Z.
    Zhang Z.-X.
    [J]. Jiaotong Yunshu Xitong Gongcheng Yu Xinxi/Journal of Transportation Systems Engineering and Information Technology, 2019, 19 (03): : 96 - 102
  • [27] HIGH SPEED TRAIN.
    Stanier, W.M.
    [J]. 1600, (02):
  • [29] Research on effect of train running on elevated line of high-speed railway on existing railway subgrade
    Shi Jin
    Zou Kai
    Gu Ai-jun
    Jiang Hui
    Liang Qing-huai
    [J]. ROCK AND SOIL MECHANICS, 2013, 34 : 285 - 290
  • [30] Speed classification of high speed train in China
    Tang, Song-Bai
    Huang, Wen-Ying
    [J]. Zhongguo Tiedao Kexue/China Railway Science, 2006, 27 (02): : 77 - 82