The effects of train brake delay time on in-train forces

被引:73
|
作者
Nasr, A. [1 ]
Mohammadi, S. [2 ]
机构
[1] Iran Univ Sci & Technol, Sch Railway Engn, Tehran 16884, Iran
[2] Iran Univ Sci & Technol, Dept Mech Engn, Tehran 16884, Iran
关键词
train dynamics; train longitudinal forces; train brake application; brake delay time;
D O I
10.1243/09544097JRRT306
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
In long trains, the braking signal from locomotive control valve takes a few seconds to reach the end cars. As a result, there is a time delay in the braking of the neighbouring cars (locomotives and wagons). This causes the running of rear cars into front cars, thus producing large forces in the buffers and couplers. The induced compression and tensile forces are mainly of longitudinal nature and considered to be responsible for large amount of expenses regarding rolling stock and track repairs as well as deterioration of safety operation of the trains. The effects of the train brake delay time on longitudinal dynamic behaviour of the freight trains are investigated in this article using simulation method. The freight trains considered are those currently operating in Iranian railways. The simulations are carried out for three different cases of long, medium, and short brake application delay times. For each case, three different train forward velocities are considered. The computed results presented here include in-train compression and tensile forces. Different modes of longitudinal dynamic interactions along the train length are also observed by simulations. The results are compared in order to give some new insight into the effect of train braking delay time on train longitudinal dynamics during braking.
引用
收藏
页码:523 / 534
页数:12
相关论文
共 50 条
  • [21] Freight train air brake models
    Wu, Qing
    Cole, Colin
    Spiryagin, Maksym
    Chang, Chongyi
    Wei, Wei
    Ursulyak, Lyudmila
    Shvets, Angela
    Murtaza, Mirza Ahsan
    Mirza, Ikram Murtaza
    Zhelieznov, Kostiantyn
    Mohammadi, Saeed
    Serajian, Hossein
    Schick, Bastian
    Berg, Mats
    Sharma, Rakesh Chandmal
    Aboubakr, Ahmed
    Sharma, Sunil Kumar
    Melzi, Stefano
    Di Gialleonardo, Egidio
    Bosso, Nicola
    Zampieri, Nicolo
    Magelli, Matteo
    Ion, Craciun Camil
    Routcliffe, Ian
    Pudovikov, Oleg
    Menaker, Grigory
    Mo, Jiliang
    Luo, Shihui
    Ghafourian, Amin
    Serajian, Reza
    Santos, Auteliano A.
    Teodoro, Icaro Pavani
    Eckert, Jony Javorski
    Pugi, Luca
    Shabana, Ahmed
    Cantone, Luciano
    [J]. INTERNATIONAL JOURNAL OF RAIL TRANSPORTATION, 2023, 11 (01) : 1 - 49
  • [22] In-train air quality assessment of the railway transit system in Beijing: A note
    Li, Tian-Tian
    Bai, Yu-Hua
    Liu, Zhao-Rong
    Li, Jin-Long
    [J]. TRANSPORTATION RESEARCH PART D-TRANSPORT AND ENVIRONMENT, 2007, 12 (01) : 64 - 67
  • [23] Investigation of in-train stability and safety assessment for railway vehicles during braking
    Lai Wei
    Jing Zeng
    Qunsheng Wang
    [J]. Journal of Mechanical Science and Technology, 2016, 30 : 1507 - 1525
  • [24] Effects of temperature and preload on fatigue behavior of train brake disc bolts
    Yao, Shuguang
    Long, Yating
    Xu, Ping
    Tang, Meng
    Yang, Chengxing
    [J]. ENGINEERING FAILURE ANALYSIS, 2024, 165
  • [25] Investigation of in-train stability and safety assessment for railway vehicles during braking
    Wei, Lai
    Zeng, Jing
    Wang, Qunsheng
    [J]. JOURNAL OF MECHANICAL SCIENCE AND TECHNOLOGY, 2016, 30 (04) : 1507 - 1525
  • [26] Influence of train brake on longitudinal impulse of a heavy haul train passing through a ramp
    Wei, Wei
    Wang, Qiang
    [J]. Zhendong yu Chongji/Journal of Vibration and Shock, 2014, 33 (05): : 143 - 148
  • [27] 'TRAIN TIME'
    SEILER, B
    [J]. NEW ENGLAND REVIEW AND BREAD LOAF QUARTERLY, 1989, 12 (02): : 156 - 156
  • [28] Time Train
    不详
    [J]. SPACE, 2011, (520): : 18 - 18
  • [29] Time to train
    [J]. Building Engineer, 2022, 97 (05): : 30 - 31
  • [30] Design and Implementation of the Train Brake Monitoring System
    Hu, Jisheng
    Tian, Xuan
    Feng, Qingsheng
    Li, Hong
    [J]. 2011 CHINESE CONTROL AND DECISION CONFERENCE, VOLS 1-6, 2011, : 1824 - +